TARRANT FM 157 (0747-04-076)

Items: 66

County: TARRANT
Length: N/A
Highway: FM 157
District: FORT WORTH
Control Number: 0747-04-076
DBE Goal: N/A
Project: NH 2020(721)
Guaranty: N/A
Time: 86 WORKING DAYS
Engineer's Estimate: $3,971,218.30
Date: 04/08/2020 (6 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,971,218.30
$3,418,266.67
Over/Under Est: -13.92% -$552,951.63
Over/Under Est: -12.37% -$491,126.16
Amt Left: 1.81% $61,825.47
Over/Under Est: -11.35% -$450,712.23
Amt Left: 2.99% $102,239.40
Delta: -1.16% -$40,413.93
Over/Under Est: -0.51% -$20,395.75
Amt Left: 15.58% $532,555.88
Delta: -12.22% -$430,316.48

Bid Items & Bid Tabulations

66 Total 0 of 66
TARRANT  |  FM 157  |  FORT WORTH  |  0747-04-076  |  04/08/2020  |  $3,971,218.30  |  NH 2020(721)  |  RESURF ROADWAY  |  86 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
NORTHEASTERN PAVERS, LLC
PEACHTREE CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 700.000 $10.000 $50.000 $50.000 $73.000 $58.000
FLEX PAVEMENT STRUCTURE REPAIR (5"-10")
SY 1,000.000 $200.000 $81.270 $65.000 $93.000 $99.000
PLAN & TEXT ASPH CONC PAV(2" TO 4")
SY 98,726.000 $3.500 $2.600 $2.550 $2.750 $2.550
RIPRAP (MOW STRIP)(5 IN)
CY 944.000 $350.000 $400.000 $475.000 $520.000 $525.000
MOBILIZATION
LS 1.000 $318,049.400 $340,000.000 $225,000.000 $250,000.000 $287,870.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $8,000.000 $30,000.000 $1,500.000 $6,000.000 $10,250.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $5.000 $2.050 $1.800 $2.300 $2.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $2.000 $0.800 $0.800 $0.900 $0.900
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,000.000 $15.000 $6.250 $4.800 $7.000 $6.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $5.000 $1.350 $1.300 $1.500 $1.480
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 1,000.000 $20.000 $6.750 $2.900 $7.500 $8.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,250.000 $20.000 $19.500 $23.000 $25.000 $24.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $1,000.000 $1,350.000 $1,100.000 $1,200.000 $1,120.000
MTL BM GD FEN TRANS (31"-28")
EA 12.000 $650.000 $615.000 $625.000 $670.000 $490.000
REMOVE METAL BEAM GUARD FENCE
LF 4,675.000 $3.000 $3.000 $3.000 $3.200 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $2,500.000 $2,650.000 $3,000.000 $3,200.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 22.000 $300.000 $325.000 $200.000 $210.000 $250.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $250.000 $225.000 $150.000 $160.000 $290.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 166.000 $30.000 $28.000 $24.000 $25.000 $32.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 10.000 $800.000 $610.000 $801.000 $850.000 $725.000
REMOVE SM RD SN SUP&AM
EA 10.000 $100.000 $75.000 $100.000 $105.000 $87.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)SRF
EA 30.000 $120.000 $80.000 $111.000 $115.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 600.000 $20.000 $21.000 $34.000 $36.000 $37.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 7,540.000 $0.500 $0.550 $0.700 $0.750 $0.780
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 890.000 $1.000 $1.580 $1.400 $1.500 $1.550
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 7,493.000 $1.000 $1.000 $0.900 $0.950 $1.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 2,496.000 $5.000 $4.000 $3.000 $3.200 $3.320
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 969.000 $5.000 $8.000 $5.000 $5.300 $5.600
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 35.000 $75.000 $120.000 $100.000 $105.000 $110.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 5.000 $100.000 $250.000 $140.000 $150.000 $152.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 25.000 $75.000 $175.000 $120.000 $125.000 $132.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 24,060.000 $0.500 $0.500 $0.700 $0.750 $0.760
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,800.000 $1.000 $1.050 $1.000 $1.600 $1.030
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,000.000 $1.000 $1.050 $1.000 $1.600 $1.030
REFL PAV MRKR TY I-C
EA 900.000 $5.000 $4.000 $5.000 $5.300 $5.250
REFL PAV MRKR TY II-A-A
EA 800.000 $5.000 $4.000 $5.000 $5.300 $5.250
ELIM EXT PAV MRK & MRKS (4")
LF 12,874.000 $0.500 $0.450 $0.350 $0.370 $0.360
ELIM EXT PAV MRK & MRKS (8")
LF 1,820.000 $1.000 $0.540 $1.000 $1.050 $1.050
ELIM EXT PAV MRK & MRKS (12")
LF 550.000 $2.000 $1.000 $2.000 $2.100 $2.120
ELIM EXT PAV MRK & MRKS (24")
LF 220.000 $3.000 $2.000 $3.000 $3.200 $3.200
ELIM EXT PAV MRK & MRKS (ARROW)
EA 15.000 $60.000 $40.000 $50.000 $53.000 $52.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 2.000 $75.000 $80.000 $100.000 $105.000 $108.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 15.000 $60.000 $75.000 $50.000 $53.000 $52.000
PAV SURF PREP FOR MRK (4")
LF 12,874.000 $0.100 $0.050 $0.010 $0.010 $0.012
PAV SURF PREP FOR MRK (8")
LF 1,820.000 $0.200 $0.100 $0.020 $0.020 $0.021
PAV SURF PREP FOR MRK (12")
LF 550.000 $0.400 $0.500 $0.030 $0.030 $0.031
PAV SURF PREP FOR MRK (24")
LF 220.000 $1.000 $1.000 $0.060 $0.060 $0.062
PAV SURF PREP FOR MRK (ARROW)
EA 15.000 $25.000 $15.000 $10.000 $10.500 $11.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $35.000 $30.000 $100.000 $105.000 $108.000
PAV SURF PREP FOR MRK (WORD)
EA 15.000 $20.000 $25.000 $10.000 $10.500 $11.000
TREE TRIMMING / BRUSH REMOVAL
MI 0.930 $10,000.000 $14,000.000 $14,000.000 $20,000.000 $15,750.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 2,952.000 $3.000 $3.000 $3.000 $3.600 $4.400
SP MIXES SP-C SAC-A PG70-28
TON 18,715.000 $120.000 $95.000 $108.000 $98.500 $119.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 172.000 $100.000 $92.010 $90.000 $75.000 $80.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 26,610.000 $1.000 $0.500 $0.600 $0.730 $0.740
MULTIPOLYMER PAV MRK (W)(4")(BRK)
LF 7,540.000 $1.000 $0.570 $0.600 $0.730 $0.740
MULTIPOLYMER PAV MRK (W)(4")(DOT)
LF 890.000 $1.000 $1.500 $2.000 $2.100 $2.200
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 7,685.000 $1.500 $1.250 $1.200 $1.250 $1.300
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 2,537.000 $4.000 $3.750 $4.000 $4.200 $4.200
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 959.000 $9.000 $7.000 $8.000 $8.500 $8.500
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 24,060.000 $1.000 $0.500 $0.600 $0.750 $0.740
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 2,119.000 $1.000 $1.250 $1.200 $1.250 $1.300
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 52.000 $110.000 $145.000 $200.000 $210.000 $210.000
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
EA 6.000 $110.000 $300.000 $300.000 $320.000 $315.000
MULTIPOLYMER PAV MRK (W) (WORD)
EA 38.000 $100.000 $165.000 $200.000 $210.000 $220.000
TMA (STATIONARY)
DAY 160.000 $250.000 $187.880 $0.010 $120.000 $240.000
Totals: $3,971,218.300 $3,418,266.670 $3,480,092.140 $3,520,506.070 $3,950,822.558