TARRANT IH 20 (0008-16-042)

Items: 186

County: TARRANT
Length: N/A
Highway: IH 20
District: FORT WORTH
Control Number: 0008-16-042
DBE Goal: N/A
Project: NH 1902(222)
Guaranty: N/A
Time: 371 WORKING DAYS
Engineer's Estimate: $24,136,519.69
Date: 04/09/2020 (6 years ago)
Contract Number: N/A
Type: CONSTRUCT NEW ROADWAY LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$24,136,519.69
$20,961,181.90
Over/Under Est: -13.16% -$3,175,337.79
Over/Under Est: -11.13% -$2,686,728.49
Amt Left: 2.33% $488,609.30
Over/Under Est: -9.58% -$2,311,735.21
Amt Left: 4.12% $863,602.58
Delta: -1.75% -$374,993.28
$23,414,821.00
Over/Under Est: -2.99% -$721,698.69
Amt Left: 11.71% $2,453,639.10
Delta: -7.29% -$1,590,036.52
$23,895,154.48
Over/Under Est: -1% -$241,365.21
Amt Left: 14% $2,933,972.58
Delta: -2.05% -$480,333.48
Subcontractor Percentage Amount
SELECT MAINTENANCE, L.L.C. 4.64% $1,286,707.29
ATS DRILLING, INC. 3.96% $1,098,138.12
PANIOLO CONSTRUCTION SERVICES, LLC 3.70% $1,026,038.14
EROSION PREVENTION PRODUCTS 3.70% $1,026,038.14
PEACHTREE CONSTRUCTION, LTD. 3.01% $834,695.89
PINNACLE GRINDING AND GROOVING LLC 1.30% $360,499.89
SLATON BROTHERS, INC. 1.15% $318,903.75
LOLLAR CONSTRUCTION GROUP LLC 1.11% $307,811.44
KELLER NORTH AMERICA, INC. 0.99% $274,534.53
E.P. DRILLING, INC. 0.79% $219,073.01
TRAFFIC TECH SOLUTIONS, LLC 0.63% $174,703.79
LOLLAR CONSTRUCTION GROUP LLC 0.52% $144,199.96
BREDA COMPANY, INC. 0.48% $133,107.65
J N K ADVANCE TREE SERVICE 0.45% $124,788.42
ALLIANCE GEOTECHNICAL GROUP, INC. 0.35% $97,057.66
COWBOY TRUCKING 0.34% $94,284.59
S&S BRIDGE PAINTING 0.27% $74,873.05
STRIPING TECHNOLOGY, L.P. 0.24% $66,553.83
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.22% $61,007.67
KING GEORGE TRAFFIC SOLUTIONS LLC 0.12% $33,276.91
C. B. SERVICES, INC. 0.11% $30,503.84
PROTEX EROSION CONTROL, LLC 0.08% $22,184.61
BROCK CONSTRUCTION, LLC 0.08% $22,184.61
COLLIER SERVICES LLC 0.07% $19,411.53
A BROTHERS MILLING, LLC 0.06% $16,638.46
ACT SAW CUTTING & REMOVAL 0.06% $16,638.46
TX DOWN UNDER CONSTRUCTION, LLC 0.06% $16,638.46
FUTURE INFRASTRUCTURE, LLC 0.05% $13,865.38
FC WELDING 0.04% $11,092.30
COMEN ENTERPRISE LLC 0.03% $8,319.23
PENHALL COMPANY 0.03% $8,319.23
THELIN RECYCLING COMPANY, L.P. 0.03% $8,319.23
AAA DRILLING FOUNDATION COMPANY, INC. 0.03% $8,319.23
SOUTHEAST GRINDING AND GROOVING LLC 0.02% $5,546.15
ELITE STRIPING, LLC 0.02% $5,546.15
REPUBLIC COMPOSITE STUD WELDING 0.01% $2,773.08
Total: 28.75% $7,972,593.68

Bid Items & Bid Tabulations

186 Total 0 of 186
TARRANT  |  IH 20  |  FORT WORTH  |  0008-16-042  |  04/09/2020  |  $24,136,519.69  |  NH 1902(222)  |  CONSTRUCT NEW ROADWAY LANES  |  371 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
ZACHRY CONSTRUCTION CORPORATION
AUSTIN BRIDGE & ROAD SERVICES, LP
SEMA CONSTRUCTION, INC.
BRIDGES AND ROADS, LLC
PREPARING ROW
STA 4.930 $40,000.000 $140,000.000 $330,937.120 $133,700.000 $335,000.000 $54,182.700
REMOVING CONC (PAV)
SY 5,583.400 $18.000 $10.000 $5.000 $20.000 $11.000 $8.700
REMOVING CONC (RIPRAP)
SY 541.300 $10.000 $6.000 $10.000 $10.000 $14.500 $18.700
REMOVE CONC (RAIL)
LF 3,984.000 $15.000 $18.000 $7.000 $8.000 $6.250 $9.300
REMOVING CONC (FLUME)
SY 613.300 $25.000 $7.500 $5.500 $8.000 $8.250 $18.700
REMOVING STAB BASE & ASPH PAV (0-2")
SY 8,626.000 $2.500 $1.500 $2.600 $4.830 $3.100 $2.600
REMOVING UNTREATED BASE (4")
SY 115.000 $2.750 $4.930 $8.300 $6.010 $30.000 $2.600
EXCAVATION (ROADWAY)
CY 20,542.900 $10.000 $2.750 $12.000 $12.500 $6.800 $7.800
EXCAVATION (CHANNEL)
CY 2,896.300 $15.000 $9.000 $14.000 $20.000 $6.500 $10.000
EXCAVATION (SPECIAL)
CY 10,551.200 $16.000 $10.000 $12.000 $11.000 $22.000 $8.900
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 17,487.300 $8.750 $21.000 $8.000 $5.000 $4.750 $5.800
COMPOST MANUF TOPSOIL (4")
SY 29,301.400 $1.400 $0.840 $1.300 $2.500 $1.100 $2.200
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 29,301.400 $0.500 $0.230 $0.090 $0.160 $0.160 $0.400
VEGETATIVE WATERING
MG 1,025.500 $12.500 $20.000 $23.000 $28.200 $18.000 $21.600
PROOF ROLLING
HR 23.300 $200.000 $125.000 $110.000 $131.380 $125.000 $102.600
LIME (HYDRATED LIME (SLURRY))
TON 432.100 $170.000 $160.000 $161.000 $158.200 $150.000 $178.500
LIME TRT(MIX EXST MATL & NEW BASE)(18")
SY 4,938.500 $3.000 $4.760 $11.000 $8.820 $5.600 $10.300
LIME TRT (SUBGRADE)(8")
SY 14,815.500 $4.500 $4.000 $5.500 $4.140 $3.200 $5.600
CEMENT
TON 30.500 $160.000 $230.850 $140.000 $99.540 $130.000 $182.600
CEMENT TREAT (SUBGRADE) (8")
SY 2,194.900 $5.000 $4.000 $5.000 $9.460 $3.000 $5.600
PRIME COAT (MULTI OPTION)
GAL 3,955.100 $4.000 $4.750 $5.400 $4.250 $4.800 $3.500
ASPH (AC-10)
GAL 6,567.600 $5.000 $4.750 $5.750 $2.350 $5.900 $6.000
AGGR(TY-B GR-3 SAC-B)
CY 125.700 $110.000 $140.000 $400.000 $217.790 $350.000 $415.100
AGGR(TY-PB GR-4 SAC-B)
CY 103.900 $100.000 $100.000 $490.000 $257.630 $395.000 $518.900
TOM (ASPHALT) PG 76-22
TON 41.100 $138.000 $165.000 $165.000 $130.000 $172.000 $149.700
TOM-C (AGGREGATE) SAC-A
TON 645.400 $134.090 $155.000 $155.000 $130.000 $162.000 $149.700
PLANE ASPH CONC PAV(0" TO 2")
SY 1,563.100 $2.000 $7.000 $6.910 $5.990 $9.000 $6.800
CONC PVMT (CONT REINF - CRCP) (11")
SY 19,832.900 $98.000 $70.000 $55.000 $82.000 $68.000 $99.600
CEM STABIL BKFL
CY 501.000 $108.000 $85.000 $125.000 $105.000 $105.000 $106.200
CUT & RESTORE ASPH PAVING
SY 65.600 $140.000 $80.000 $145.000 $250.000 $145.000 $207.600
TRENCH EXCAVATION PROTECTION
LF 451.000 $7.500 $1.000 $12.000 $25.000 $12.000 $5.200
TEMPORARY SPL SHORING
SF 13,284.000 $22.000 $19.000 $21.000 $20.000 $25.000 $21.400
DRILL SHAFT (18 IN)
LF 50.000 $100.000 $74.570 $55.000 $39.920 $112.000 $71.900
DRILL SHAFT (36 IN)
LF 7,384.000 $210.000 $157.050 $250.000 $195.000 $180.000 $189.800
DRILL SHAFT (42 IN)
LF 650.000 $405.000 $240.000 $240.000 $194.270 $290.000 $271.800
DRILL SHAFT (48 IN)
LF 22.000 $350.000 $327.580 $450.000 $440.000 $420.000 $519.700
DRILL SHAFT (54 IN)
LF 399.000 $400.000 $380.000 $360.000 $450.000 $450.000 $445.900
DRILL SHAFT (60 IN)
LF 160.000 $400.000 $550.000 $475.000 $428.780 $685.000 $568.200
DRILL SHAFT (SIGN MTS) (12 IN)
LF 7.000 $125.000 $60.000 $60.000 $60.000 $105.000 $62.300
DRILL SHAFT (SIGN MTS) (48 IN)
LF 87.000 $500.000 $440.000 $440.000 $440.000 $350.000 $456.700
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 32.000 $682.000 $580.000 $580.000 $580.000 $690.000 $602.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 10.000 $182.000 $140.000 $140.000 $140.000 $220.000 $145.300
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 48.000 $181.760 $120.000 $120.000 $120.000 $250.000 $124.500
CL A CONC (MISC)
CY 900.800 $600.000 $230.000 $700.000 $0.010 $220.000 $424.900
CL C CONC (ABUT)(HPC)
CY 115.170 $1,200.000 $750.000 $760.000 $1,000.000 $700.000 $955.300
CL C CONC (CAP)(HPC)
CY 339.500 $1,100.000 $950.000 $790.000 $1,200.000 $720.000 $1,112.000
CL C CONC (COLUMN)(HPC)
CY 299.600 $920.000 $700.000 $900.000 $904.000 $620.000 $889.700
REINF CONC SLAB (HPC)
SF 36,344.000 $23.000 $17.000 $18.000 $26.720 $25.000 $28.100
APPROACH SLAB (HPC)
CY 140.500 $515.000 $480.000 $450.000 $422.220 $500.000 $605.500
RETAINING WALL (MSE)
SF 14,200.000 $45.000 $55.000 $50.000 $54.840 $50.000 $54.800
PRESTR CONC GIRDER (TX54)
LF 2,167.100 $130.000 $190.000 $150.000 $177.030 $150.000 $157.700
PRESTR CONC GIRDER (TX70)
LF 1,096.300 $145.000 $180.000 $155.000 $197.880 $165.000 $218.400
RIPRAP (CONC)(4 IN)
CY 280.700 $650.000 $420.000 $375.000 $346.110 $410.000 $353.900
RIPRAP (CONC)(5 IN)
CY 268.900 $560.000 $430.000 $380.000 $342.800 $410.000 $358.100
RIPRAP (CONC) (CL A )
CY 9.000 $571.000 $490.000 $715.000 $406.490 $590.000 $518.900
RIPRAP (STONE PROTECTION)(30 IN)
CY 557.300 $250.000 $160.000 $90.000 $106.580 $90.000 $207.600
RIPRAP (CONC)(FLUME)
CY 301.800 $500.000 $390.000 $470.000 $318.230 $700.000 $478.600
RIPRAP (MOW STRIP)(4 IN)
CY 257.400 $460.000 $430.000 $460.000 $304.870 $430.000 $378.800
ELASTOMERIC BEARING (E5)
EA 8.000 $1,600.000 $1,650.000 $2,000.000 $2,330.340 $2,400.000 $2,496.600
ELASTOMERIC BEARING (F5)
EA 4.000 $1,600.000 $2,000.000 $2,100.000 $2,330.340 $2,500.000 $2,487.200
SLIDING ELASTOMERIC BEARING (ES 3)
EA 4.000 $3,200.000 $2,150.000 $2,500.000 $3,500.000 $2,400.000 $2,097.000
STR STEEL (PLATE GIRDER)
LB 1,112,667.000 $2.000 $1.900 $1.640 $1.560 $1.650 $1.900
STR STEEL (MISCELLANEOUS BRIDGE)
LB 600.000 $13.000 $13.000 $4.550 $6.000 $11.000 $12.600
RAIL (TY SSTR)
LF 1,186.000 $45.000 $45.000 $40.000 $46.060 $49.000 $39.400
RAIL (TY SSTR)(HPC)
LF 406.400 $63.000 $56.000 $62.000 $59.690 $62.000 $50.900
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 3,570.500 $65.000 $45.000 $41.000 $47.690 $44.000 $41.000
RAIL (TY SSTR)(MOD)
LF 361.000 $42.000 $65.000 $175.000 $198.680 $165.000 $228.300
RAIL (TY SSTR) (W/DRAIN SLOTS) (MOD)
LF 5,263.000 $90.000 $152.690 $115.000 $117.800 $165.000 $138.000
ARMOR JOINT (SEALED)
LF 138.000 $128.000 $70.000 $173.000 $125.000 $70.000 $96.000
CONC BOX CULV (6 FT X 3 FT)
LF 192.000 $325.000 $340.000 $380.000 $479.550 $380.000 $706.000
RC PIPE (CL III)(18 IN)
LF 89.000 $60.000 $65.000 $105.000 $124.190 $76.000 $207.600
RC PIPE (CL III)(60 IN)
LF 211.000 $320.000 $275.000 $360.000 $450.000 $350.000 $493.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $3,550.000 $2,600.000 $7,000.000 $3,014.010 $5,600.000 $14,011.200
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 3.000 $12,000.000 $18,500.000 $13,000.000 $12,995.780 $16,000.000 $20,757.400
HEADWALL (CH - FW - 0) (DIA= 18 IN)
EA 1.000 $3,450.000 $3,500.000 $2,700.000 $2,000.000 $4,200.000 $2,594.700
HEADWALL (CH - FW - 30) (DIA= 60 IN)
EA 1.000 $11,000.000 $18,000.000 $6,190.000 $10,000.000 $14,000.000 $10,378.700
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $10,000.000 $11,000.000 $5,858.000 $10,000.000 $12,500.000 $10,378.700
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $800.000 $1,250.000 $3,180.000 $1,745.260 $900.000 $1,556.800
JACK BOR OR TUN PIPE(18 IN)(RC) (CL IV)
LF 95.000 $704.000 $425.000 $580.000 $893.000 $700.000 $674.600
REMOV STR (INLET)
EA 9.000 $710.000 $450.000 $550.000 $627.290 $750.000 $311.400
REMOV STR (WINGWALL)
EA 7.000 $1,120.000 $1,300.000 $700.000 $223.400 $850.000 $518.900
REMOV STR (PIPE)
LF 118.000 $30.000 $50.000 $10.000 $200.000 $25.000 $98.600
MOBILIZATION
LS 1.000 $2,000,000.000 $2,090,000.000 $1,475,025.000 $2,182,000.000 $1,716,000.000 $2,655,080.880
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $9,200.000 $34,000.000 $6,500.000 $27,700.000 $7,400.000 $7,755.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 112.000 $25.000 $19.740 $25.250 $19.740 $24.000 $20.500
ROCK FILTER DAMS (REMOVE)
LF 112.000 $7.000 $11.250 $8.000 $11.250 $10.000 $11.700
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,564.000 $2.000 $1.300 $1.750 $2.000 $1.750 $1.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,564.000 $0.750 $0.750 $0.500 $0.750 $0.450 $0.800
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 808.000 $2.000 $2.250 $2.750 $2.250 $3.250 $2.300
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 96.000 $4.000 $3.750 $5.250 $3.750 $9.500 $3.900
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,059.000 $1.440 $0.500 $0.850 $0.500 $0.850 $0.500
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 155.000 $3.800 $2.250 $2.750 $2.250 $5.250 $2.300
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 11,086.000 $62.000 $60.000 $69.690 $50.000 $65.000 $31.100
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 11,086.000 $4.000 $8.000 $4.220 $7.720 $8.000 $18.700
DRIVEWAYS (CONC)
SY 73.200 $95.000 $89.910 $80.220 $110.040 $125.000 $111.500
REMOVE METAL BEAM GUARD FENCE
LF 1,333.000 $3.500 $3.500 $3.500 $2.500 $3.100 $2.800
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $235.000 $275.000 $275.000 $575.000 $325.000 $255.100
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $212.000 $275.000 $275.000 $575.000 $325.000 $259.500
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $500.000 $471.370 $510.000 $750.000 $752.500
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $26,000.000 $12,500.000 $22,500.000 $22,500.000 $20,000.000 $21,624.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,500.000 $7,275.000 $6,471.090 $15,000.000 $6,800.000 $8,090.200
WIRE FENCE (TY C)
LF 33.000 $150.000 $50.000 $138.000 $138.000 $145.000 $81.900
GATE (TY 1)
EA 1.000 $1,200.000 $1,500.000 $1,445.000 $1,445.000 $1,500.000 $450.100
PIPE UNDERDRAINS (TY 8) (6")
LF 1,302.000 $35.000 $0.010 $16.000 $0.010 $24.000 $25.900
RELOCATE RD IL ASM (SHOE-BASE)
EA 1.000 $1,400.000 $1,300.000 $1,300.000 $1,300.000 $1,200.000 $1,349.200
HI MST IL POLE (150 FT)( 80 MPH)
EA 1.000 $31,810.000 $31,000.000 $31,000.000 $31,000.000 $37,000.000 $32,173.900
CONDT (PVC) (SCH 40) (2")
LF 276.000 $9.000 $7.000 $7.000 $7.000 $10.500 $7.300
CONDT (PVC) (SCH 40) (3")
LF 8,341.000 $11.000 $9.000 $9.000 $9.000 $11.500 $9.300
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,337.000 $30.000 $25.000 $25.000 $25.000 $28.000 $25.900
CONDT (RM) (2")
LF 4.000 $37.000 $60.000 $60.000 $60.000 $58.000 $62.300
CONDT (RM) (3")
LF 1,612.000 $53.000 $50.000 $50.000 $50.000 $73.000 $51.900
ELEC CONDR (NO.8) BARE
LF 225.000 $1.100 $1.000 $1.000 $1.000 $1.350 $1.000
ELEC CONDR (NO.8) INSULATED
LF 3,974.000 $1.390 $1.100 $1.100 $1.100 $1.350 $1.100
ELEC CONDR (NO.4) BARE
LF 2,325.000 $1.730 $2.000 $2.000 $2.000 $2.000 $2.100
ELEC CONDR (NO.4) INSULATED
LF 6,096.000 $2.000 $2.000 $2.000 $2.000 $2.000 $2.100
ELEC CONDR (NO.1/0) BARE
LF 2,061.000 $3.110 $2.000 $2.000 $2.000 $2.500 $2.100
ELEC CONDR (NO.1/0) INSULATED
LF 4,122.000 $3.150 $3.000 $3.000 $3.000 $2.700 $3.100
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,250.000 $1,150.000 $1,150.000 $1,150.000 $950.000 $1,193.500
REMOVE GROUND BOX
EA 2.000 $500.000 $200.000 $200.000 $200.000 $190.000 $207.600
REMOVE ELECTRICAL SERVICES
EA 1.000 $503.200 $500.000 $500.000 $500.000 $560.000 $518.900
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 2.000 $4,400.000 $6,000.000 $6,000.000 $6,000.000 $4,500.000 $6,227.200
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
EA 6.000 $4,600.000 $6,500.000 $6,500.000 $6,500.000 $4,800.000 $6,746.100
ALUMINUM SIGNS (TY A)
SF 6.300 $18.000 $21.000 $21.000 $21.000 $34.000 $21.800
ALUMINUM SIGNS (TY G)
SF 51.400 $20.000 $23.000 $23.000 $23.000 $29.000 $23.900
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 18.800 $35.000 $21.000 $21.000 $21.000 $26.000 $21.800
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 752.900 $42.000 $22.000 $22.000 $22.000 $28.000 $22.800
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $440.000 $440.000 $440.000 $590.000 $456.700
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $585.000 $590.000 $590.000 $590.000 $780.000 $612.300
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $950.000 $780.000 $780.000 $780.000 $1,400.000 $809.500
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 5.000 $2,300.000 $1,600.000 $1,600.000 $1,600.000 $2,800.000 $1,660.600
REMOVE SM RD SN SUP&AM
EA 20.000 $182.000 $50.000 $50.000 $50.000 $200.000 $51.900
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 1.000 $70.000 $50.000 $50.000 $50.000 $100.000 $51.900
INSTALL LRSS (STRUCT STEEL)
LB 179.800 $5.000 $6.000 $6.000 $6.000 $7.000 $6.200
INS OH SN SUP(30 FT CANT)
EA 2.000 $25,000.000 $60,000.000 $60,000.000 $60,000.000 $51,000.000 $62,272.100
INS OH SN SUP(35 FT BAL TEE)
EA 1.000 $24,620.000 $21,000.000 $21,000.000 $21,000.000 $37,000.000 $21,795.200
SIGN WALKWAY (48 IN) WITH HNDRL
LF 12.170 $162.000 $300.000 $300.000 $300.000 $175.000 $311.400
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,000.000 $1.000 $1.000 $1.000 $1.000 $1.050 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 9,432.000 $1.000 $1.000 $1.000 $1.000 $1.050 $0.300
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,209.000 $1.500 $1.350 $1.500 $1.500 $1.550 $0.900
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,000.000 $1.000 $0.850 $1.500 $1.500 $1.550 $0.900
REFL PAV MRK TY II (W) 4" (BRK)
LF 6,009.000 $0.380 $0.150 $0.300 $0.300 $0.320 $0.200
REFL PAV MRK TY II (W) 4" (SLD)
LF 11,347.000 $0.320 $0.150 $0.300 $0.300 $0.320 $0.200
REFL PAV MRK TY II (W) 8" (SLD)
LF 2,454.000 $0.550 $0.350 $0.500 $0.500 $0.550 $0.500
REFL PAV MRK TY II (W) 12" (SLD)
LF 1,221.000 $2.200 $1.900 $2.000 $2.000 $2.100 $1.400
REFL PAV MRK TY II (W) (ARROW)
EA 7.000 $62.000 $55.000 $75.000 $75.000 $78.000 $54.900
REFL PAV MRK TY II (W) (WORD)
EA 4.000 $69.000 $85.000 $100.000 $100.000 $104.000 $57.500
REFL PAV MRK TY II (Y) 4" (SLD)
LF 12,001.000 $0.320 $0.150 $0.300 $0.300 $0.320 $0.200
REFL PAV MRK TY II (W)12"(DOT)
LF 2,122.000 $3.520 $1.900 $2.000 $2.000 $2.100 $5.600
REFL PAV MRKR TY I-C
EA 355.000 $5.000 $4.000 $3.600 $3.600 $3.700 $3.400
REFL PAV MRKR TY I-R
EA 168.000 $6.000 $4.000 $3.600 $3.600 $3.700 $4.400
REFL PAV MRKR TY II-C-R
EA 480.000 $5.000 $4.000 $3.600 $3.600 $3.700 $3.400
ELIM EXT PAV MRK & MRKS (4")
LF 27,706.500 $0.200 $0.400 $0.300 $0.300 $0.320 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 1,259.000 $0.460 $0.500 $0.500 $0.500 $0.550 $0.800
PAV SURF PREP FOR MRK (RPM)
EA 168.000 $0.250 $0.250 $1.000 $1.000 $1.050 $0.800
BRIDGE JOINT REPAIR (ARMOR)
LF 597.000 $250.000 $50.000 $235.000 $145.720 $245.000 $248.300
NEXT GEN CONC SURF GRIND OF CONC PAV
SY 60,818.400 $5.000 $5.500 $6.000 $6.850 $9.500 $6.200
D-GR HMA TY-B PG64-22
TON 6,822.600 $76.000 $75.500 $75.500 $80.000 $78.000 $92.300
TACK COAT
GAL 12,458.600 $8.000 $4.750 $4.750 $0.010 $4.900 $3.500
NOISE WALL
SF 79,151.300 $53.000 $30.000 $25.500 $27.570 $43.000 $42.100
INTRLCK ART CONC BLK W/PERCUSSION DRV
SF 66,900.000 $20.000 $8.000 $18.000 $19.000 $17.000 $15.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $40,000.000 $17,000.000 $19,485.000 $14,000.000 $11,771.200
FO CBL (72 SMF)
LF 37,982.000 $1.750 $3.600 $3.600 $3.600 $1.500 $6.200
FO SPLICE ENCLOSURE (TYPE 1)
EA 9.000 $1,700.000 $1,500.000 $1,500.000 $1,500.000 $2,000.000 $1,556.800
FO SPLICE ENCLOSURE (TYPE 2)
EA 2.000 $1,700.000 $1,500.000 $1,500.000 $1,500.000 $2,750.000 $1,556.800
FIBER OPTIC FUSION SPLICE
EA 444.000 $36.000 $47.000 $47.000 $47.000 $72.000 $48.800
REMOVE FIBER OPTIC CABLE
LF 7,212.000 $1.000 $0.500 $0.500 $0.500 $1.800 $0.500
CCTV FIELD EQUIPMENT (DIGITAL)
EA 5.000 $8,500.000 $4,400.000 $4,400.000 $4,400.000 $10,600.000 $4,566.600
CCTV MOUNT (POLE)
EA 1.000 $655.000 $500.000 $500.000 $500.000 $620.000 $518.900
ITS MULTI-DUCT CND (PVC-40)
LF 7,502.000 $15.300 $17.000 $15.000 $17.000 $23.000 $17.600
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 1,960.000 $23.000 $33.000 $30.000 $33.000 $40.000 $34.200
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $13,170.000 $15,000.000 $15,000.000 $15,000.000 $22,600.000 $15,568.000
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
EA 4.000 $3,800.000 $2,400.000 $2,400.000 $2,400.000 $7,500.000 $2,490.900
ITS POLE (30 FT)(90 MPH)
EA 2.000 $6,500.000 $5,000.000 $5,000.000 $5,000.000 $6,900.000 $5,189.300
ITS POLE (60 FT)(90 MPH)
EA 1.000 $13,050.000 $11,000.000 $11,000.000 $11,000.000 $15,500.000 $11,416.600
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 2.000 $6,300.000 $6,200.000 $6,200.000 $6,200.000 $6,100.000 $6,434.800
ITS POLE MNT CAB (TY 3)(CONF 2)
EA 1.000 $5,935.000 $6,300.000 $6,300.000 $6,300.000 $7,400.000 $6,538.600
TMA (MOBILE OPERATION)
DAY 4.000 $250.000 $2,000.000 $1,500.000 $672.630 $300.000 $266.600
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 14.000 $2,725.000 $1,900.000 $1,900.000 $1,900.000 $3,500.000 $1,972.000
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 8.000 $5,000.000 $3,100.000 $3,100.000 $3,100.000 $4,700.000 $3,217.400
HIGH MAST ASSEMBLY FOR ITS
EA 1.000 $72,000.000 $22,000.000 $22,000.000 $22,000.000 $47,000.000 $22,833.100
ITS RVSD (DATA COLLECT & WWA) SYS
EA 2.000 $7,500.000 $8,500.000 $8,500.000 $8,500.000 $16,000.000 $8,821.900
ITS RVSD (DC ONLY) (RELOCATE)
EA 2.000 $2,500.000 $1,500.000 $1,500.000 $1,500.000 $4,000.000 $1,556.800
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
EA 1.000 $4,500.000 $12,000.000 $12,000.000 $12,000.000 $18,500.000 $12,454.400
INST WRONG WAY DRIVER SYSTEM EQUIPMENT
EA 4.000 $4,200.000 $5,500.000 $5,500.000 $5,500.000 $7,500.000 $5,708.300
REMOVE EXIST WATER PIPE (8")
LF 743.000 $12.920 $20.000 $12.930 $30.000 $10.500 $10.400
CASING (STEEL) (30 IN) (OPEN TRENCH)
LF 32.000 $250.000 $375.000 $1,000.000 $147.810 $245.000 $311.400
Totals: $24,136,519.691 $20,961,181.925 $21,449,791.213 $21,824,784.580 $23,414,821.014 $23,895,154.490