Show Job Controls
Bid Cobra

SMITH VA (0910-00-127)

Items: 67

County: SMITH
Length: N/A
Highway: VA
District: TYLER
Control Number: 0910-00-127
DBE Goal: N/A
Project: STP 2B20(022)
Guaranty: N/A
Time: 300 WORKING DAYS
Engineer's Estimate: $4,112,570.00
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: SIDEWALKS & ADA PED RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$4,112,570.00
$3,512,938.50
Over/Under Est: -14.58% -$599,631.50
$3,691,854.95
Over/Under Est: -10.23% -$420,715.05
Amt Left: 5.09% $178,916.45
Over/Under Est: -9.1% -$374,417.58
Amt Left: 6.41% $225,213.92
Delta: -1.25% -$46,297.47
$3,935,314.55
Over/Under Est: -4.31% -$177,255.45
Amt Left: 12.02% $422,376.05
Delta: -5.27% -$197,162.13
Over/Under Est: -3.89% -$159,981.70
Amt Left: 12.52% $439,649.80
Delta: -0.44% -$17,273.75
$3,994,810.50
Over/Under Est: -2.86% -$117,759.50
Amt Left: 13.72% $481,872.00
Delta: -1.07% -$42,222.20
Over/Under Est: 2.05% $84,361.10
Amt Left: 19.47% $683,992.60
Delta: -5.06% -$202,120.60
$4,627,834.00
Over/Under Est: 12.53% $515,264.00
Amt Left: 31.74% $1,114,895.50
Delta: -10.27% -$430,902.90

Bid Items & Bid Tabulations

67 Total 0 of 67
SMITH  |  VA  |  TYLER  |  0910-00-127  |  07/08/2020  |  $4,112,570.00  |  STP 2B20(022)  |  SIDEWALKS & ADA PED RAMPS  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
TI-ZACK CONCRETE, INC.
SOUTH TEXAS ILLUMINATION, LLC
REYNOLDS & KAY, LTD.
CROSS PLUS CONSTRUCTION, LLC
ENCINO LANDSCAPE, INC.
EAST TEXAS BRIDGE, INC.
FNH CONSTRUCTION, LLC
REMOVING CONC (DRIVEWAYS)
SY 4,366.700 $20.000 $20.000 $24.000 $19.690 $10.000 $15.000 $15.000 $20.000 $20.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 5,814.000 $13.000 $5.000 $8.000 $10.010 $5.000 $10.000 $15.000 $5.000 $15.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 321.300 $15.000 $25.000 $18.000 $18.000 $10.000 $15.000 $15.000 $20.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,080.000 $25.000 $30.000 $42.000 $15.170 $21.000 $35.000 $20.000 $25.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 31,875.000 $1.500 $1.000 $3.500 $1.700 $1.650 $3.000 $1.000 $2.000 $8.000
BLOCK SODDING
SY 31,875.000 $6.000 $5.000 $3.500 $8.850 $4.000 $4.000 $2.500 $4.500 $5.000
VEGETATIVE WATERING
MG 350.700 $15.000 $100.000 $25.000 $94.130 $10.000 $20.000 $5.000 $20.000 $30.000
FLEX PAVEMENT STRUCTURE REPAIR (5"-10")
SY 600.000 $100.000 $55.000 $85.000 $111.170 $104.000 $200.000 $100.000 $200.000 $100.000
FLOWABLE BACKFILL
CY 6.000 $350.000 $200.000 $265.000 $341.250 $385.000 $300.000 $200.000 $500.000 $350.000
DRILL SHAFT (24 IN)
LF 42.000 $250.000 $200.000 $165.000 $118.690 $228.000 $253.000 $200.000 $240.000 $285.000
CL A CONC (MISC)
CY 5.200 $450.000 $1,000.000 $550.000 $878.250 $750.000 $800.000 $500.000 $1,500.000 $1,500.000
CL A CONC (MEDIAN)
CY 14.000 $500.000 $1,000.000 $550.000 $956.250 $750.000 $800.000 $300.000 $1,000.000 $1,500.000
RETAINING WALL (CAST - IN - PLACE)
SF 1,730.000 $85.000 $50.000 $40.000 $99.750 $43.000 $78.000 $100.000 $90.000 $85.000
RIPRAP (CONC)(4 IN)
CY 5.200 $600.000 $500.000 $550.000 $551.250 $800.000 $700.000 $500.000 $700.000 $550.000
RAIL (HANDRAIL)(TY A)
LF 20.000 $125.000 $180.000 $165.000 $118.440 $125.000 $300.000 $320.000 $150.000 $185.000
RAIL (HANDRAIL)(TY E)
LF 322.000 $150.000 $110.000 $95.000 $96.390 $148.000 $400.000 $320.000 $160.000 $185.000
RAIL (TY PR11)
LF 165.000 $150.000 $110.000 $95.000 $190.450 $170.000 $500.000 $320.000 $180.000 $185.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 40.000 $750.000 $550.000 $1,000.000 $798.000 $635.000 $1,000.000 $750.000 $1,000.000 $1,000.000
RC PIPE (CL III)(42 IN)
LF 8.000 $250.000 $200.000 $310.000 $393.750 $345.000 $199.000 $300.000 $200.000 $450.000
RC PIPE (CL III)(60 IN)
LF 32.000 $300.000 $320.000 $420.000 $535.500 $418.000 $256.000 $400.000 $400.000 $850.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $20,000.000 $26,000.000 $43,000.000 $27,772.500 $21,000.000 $10,000.000 $20,000.000 $25,000.000 $50,000.000
MOBILIZATION
LS 1.000 $400,000.000 $400,000.000 $165,000.000 $200,122.500 $565,000.000 $400,000.000 $350,000.000 $400,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $5,000.000 $3,500.000 $1,500.000 $7,799.250 $2,500.000 $5,000.000 $7,500.000 $8,000.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,000.000 $4.000 $1.000 $0.010 $2.510 $3.100 $2.000 $3.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,000.000 $2.000 $1.000 $0.010 $1.130 $1.000 $1.000 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 890.000 $5.000 $1.000 $0.010 $5.010 $4.100 $15.000 $5.000 $7.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 890.000 $3.000 $1.000 $0.010 $1.130 $1.000 $3.000 $1.000 $1.000 $9.000
CONC CURB (TY II)
LF 189.000 $30.000 $25.000 $35.000 $24.200 $16.000 $25.000 $20.000 $25.000 $35.000
CONC CURB & GUTTER (TY II)
LF 1,755.000 $35.000 $35.000 $40.000 $43.700 $28.000 $25.000 $25.000 $40.000 $35.000
DRIVEWAYS (ACP)
SY 1,975.900 $45.000 $55.000 $45.000 $61.730 $56.000 $68.000 $60.000 $55.000 $45.000
DRIVEWAYS (CONC) (HES)
SY 8,226.100 $110.000 $85.000 $85.000 $93.040 $99.000 $85.000 $90.000 $100.000 $95.000
CONC SIDEWALKS (4")
SY 18,386.000 $65.000 $62.000 $85.000 $49.790 $64.500 $54.000 $70.500 $65.000 $55.000
CURB RAMPS (TY 1)
EA 4.000 $1,800.000 $1,800.000 $1,300.000 $1,989.750 $2,400.000 $1,900.000 $1,500.000 $2,000.000 $3,000.000
CURB RAMPS (TY 2)
EA 1.000 $2,000.000 $2,500.000 $1,300.000 $2,193.750 $2,400.000 $3,000.000 $2,000.000 $2,000.000 $3,000.000
CURB RAMPS (TY 7)
EA 51.000 $2,000.000 $1,100.000 $1,300.000 $2,823.750 $2,400.000 $2,200.000 $1,500.000 $2,000.000 $2,500.000
CURB RAMPS (TY 10)
EA 35.000 $2,000.000 $1,100.000 $1,300.000 $2,865.750 $2,400.000 $2,600.000 $1,500.000 $2,000.000 $2,500.000
CURB RAMPS (TY 21)
EA 3.000 $3,500.000 $3,600.000 $1,300.000 $3,765.000 $3,000.000 $4,000.000 $2,200.000 $4,000.000 $3,000.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 66.600 $200.000 $350.000 $175.000 $266.100 $660.000 $96.000 $200.000 $400.000 $400.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 47.000 $300.000 $300.000 $250.000 $306.380 $325.000 $400.000 $400.000 $350.000 $850.000
CONDT (PVC) (SCH 80) (2")
LF 200.000 $11.000 $12.000 $10.000 $9.460 $13.000 $10.500 $10.000 $14.000 $15.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 410.000 $20.000 $28.000 $28.000 $16.460 $31.000 $5.000 $30.000 $30.000 $40.000
ELEC CONDR (NO.8) BARE
LF 610.000 $1.500 $2.550 $2.000 $1.980 $2.750 $3.000 $2.000 $3.000 $3.000
GROUND BOX TY A (122311)W/APRON
EA 5.000 $1,000.000 $850.000 $1,000.000 $758.250 $950.000 $1,500.000 $955.000 $1,000.000 $1,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 102.000 $700.000 $350.000 $200.000 $172.500 $470.000 $450.000 $435.000 $500.000 $650.000
RELOCATE SM RD SN SUP&AM TY S80
EA 7.000 $700.000 $500.000 $200.000 $172.500 $575.000 $450.000 $440.000 $600.000 $650.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,434.000 $4.000 $3.500 $4.000 $2.100 $3.800 $3.000 $4.000 $3.800 $8.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,972.000 $8.000 $5.500 $6.000 $6.050 $6.000 $7.000 $6.000 $6.000 $20.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 14.000 $50.000 $50.000 $55.000 $38.170 $55.000 $56.000 $75.000 $55.000 $250.000
REFL PAV MRK TY II (W) 12" (SLD)
LF 3,434.000 $2.000 $2.000 $2.000 $0.500 $2.250 $1.000 $3.000 $2.200 $6.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 1,972.000 $4.000 $2.500 $2.500 $0.540 $2.700 $1.000 $3.500 $3.000 $20.000
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 14.000 $25.000 $30.000 $33.000 $10.550 $33.000 $12.000 $25.000 $33.000 $250.000
ELIM EXT PAV MRK & MRKS (8")
LF 70.000 $1.800 $1.000 $1.000 $1.070 $1.100 $1.000 $1.000 $1.100 $2.000
ELIM EXT PAV MRK & MRKS (24")
LF 1,056.000 $4.000 $2.000 $2.200 $1.610 $2.250 $2.000 $4.000 $2.200 $6.000
PAV SURF PREP FOR MRK (12")
LF 3,434.000 $1.500 $0.500 $0.500 $0.510 $0.550 $2.000 $2.000 $0.550 $6.000
PAV SURF PREP FOR MRK (24")
LF 1,972.000 $2.500 $1.000 $1.000 $0.550 $1.100 $2.000 $2.000 $1.100 $6.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 14.000 $8.000 $25.000 $30.000 $11.550 $27.000 $16.000 $30.000 $30.000 $250.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $10,000.000 $7,500.000 $8,500.000 $3,093.750 $8,600.000 $40,000.000 $45,000.000 $9,000.000 $30,000.000
PED SIG SEC (LED)(2 INDICATIONS)
EA 8.000 $400.000 $500.000 $550.000 $452.630 $550.000 $700.000 $600.000 $550.000 $2,000.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $600.000 $400.000 $450.000 $443.030 $450.000 $900.000 $650.000 $440.000 $2,850.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,715.000 $1.300 $2.000 $2.200 $1.820 $2.250 $5.000 $2.500 $2.200 $3.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,755.000 $1.900 $2.500 $2.750 $1.820 $2.750 $5.000 $3.000 $3.000 $3.000
PED POLE ASSEMBLY
EA 7.000 $2,000.000 $2,500.000 $2,500.000 $982.050 $2,500.000 $3,500.000 $2,400.000 $3,000.000 $2,850.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $800.000 $800.000 $800.000 $665.030 $900.000 $1,200.000 $800.000 $900.000 $1,850.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,200.000 $3,500.000 $3,500.000 $2,942.630 $3,500.000 $5,000.000 $3,500.000 $4,000.000 $8,500.000
WHEEL STOPS
EA 32.000 $200.000 $150.000 $165.000 $226.500 $325.000 $195.000 $200.000 $400.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $5,000.000 $2,500.000 $2,100.000 $8,800.000 $500.000 $9,999.000 $20,000.000 $16,500.000
TMA (STATIONARY)
DAY 200.000 $200.000 $100.000 $30.000 $472.500 $145.000 $500.000 $250.000 $300.000 $250.000
Totals: $4,112,570.000 $3,512,938.500 $3,691,854.950 $3,738,152.435 $3,935,314.550 $3,952,588.300 $3,994,810.500 $4,196,931.100 $4,627,834.000