SMITH IH 20 (0495-04-070)

Items: 37

County: SMITH
Length: N/A
Highway: IH 20
District: TYLER
Control Number: 0495-04-070
DBE Goal: N/A
Project: NH 2020(707)
Guaranty: N/A
Time: 66 WORKING DAYS
Engineer's Estimate: $2,434,558.56
Date: 04/09/2020 (6 years ago)
Contract Number: N/A
Type: TBPFC SURF, ACP SURF, PLANING, SHLDR TEXT, PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,434,558.56
$3,079,236.01
Over/Under Est: 26.48% $644,677.45
Over/Under Est: 30.9% $752,271.24
Amt Left: 3.49% $107,593.79

Bid Items & Bid Tabulations

37 Total 0 of 37
SMITH  |  IH 20  |  TYLER  |  0495-04-070  |  04/09/2020  |  $2,434,558.56  |  NH 2020(707)  |  TBPFC SURF, ACP SURF, PLANING, SHLDR...  |  66 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
EAST TEXAS BRIDGE, INC.
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 121.000 $35.000 $52.000 $50.000
BACKFILL (TY A)
STA 200.120 $255.000 $310.000 $400.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 7,224.000 $3.250 $4.350 $11.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 172.000 $145.000 $452.000 $250.000
TBPFC (MEMBRANE)
GAL 33,155.000 $3.000 $3.050 $4.000
TBPFC (ASPHALT)(PG 76-22)
TON 459.000 $115.000 $185.000 $185.000
TBPFC (AGGREGATE) (SAC-A)
TON 7,192.000 $170.000 $185.000 $185.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 6,222.000 $50.000 $65.000 $60.000
PLANE ASPH CONC PAV (2")
SY 10,495.000 $1.500 $5.000 $6.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 15,536.000 $3.150 $6.900 $6.000
RIPRAP (MOW STRIP)(4 IN)
CY 70.000 $600.000 $800.000 $500.000
MOBILIZATION
LS 1.000 $218,084.360 $288,572.000 $315,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $8,000.000 $23,000.000 $40,000.000
RUMBLE STRIPS (SHOULDER)
LF 45,708.000 $0.200 $0.160 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 1,300.000 $22.000 $21.000 $20.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,275.000 $1,150.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 790.000 $2.750 $2.200 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $235.000 $190.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,800.000 $2,700.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $275.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 52.000 $30.000 $34.600 $50.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 868.000 $1.250 $1.070 $2.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 3,141.000 $1.600 $1.070 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 8,690.000 $1.000 $0.800 $0.800
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 700.000 $3.250 $3.350 $3.300
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,140.000 $5.000 $3.000 $3.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 150.000 $0.500 $2.250 $2.200
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 6,980.000 $0.700 $0.700 $0.700
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 27,130.000 $0.600 $0.600 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 150.000 $0.500 $2.250 $2.200
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 27,130.000 $0.600 $0.600 $0.600
REFL PAV MRKR TY II-C-R
EA 1,007.000 $4.000 $4.450 $4.400
MEMBRANE UNDERSEAL
GAL 2,100.000 $3.500 $3.100 $5.000
SP MIXES SP-C SAC-A PG76-22
TON 1,115.000 $110.000 $196.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 130.000 $140.000 $90.000 $200.000
TMA (STATIONARY)
DAY 46.000 $205.000 $265.000 $300.000
TMA (MOBILE OPERATION)
DAY 12.000 $200.000 $265.000 $300.000
Totals: $2,434,558.560 $3,079,236.010 $3,186,829.800