Show Job Controls
Bid Cobra

SMITH US 69 (0191-01-092)

Items: 46

County: SMITH
Length: N/A
Highway: US 69
District: TYLER
Control Number: 0191-01-092
DBE Goal: N/A
Project: NH 2020(705)
Guaranty: N/A
Time: 43 WORKING DAYS
Engineer's Estimate: $2,825,314.91
Date: 04/08/2020 (6 years ago)
Contract Number: N/A
Type: REPAIR AND RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,825,314.91
Over/Under Est: -27.07% -$764,715.11
Over/Under Est: -25.75% -$727,407.41
Amt Left: 1.81% $37,307.70
Over/Under Est: -25.34% -$715,844.53
Amt Left: 2.37% $48,870.58
Delta: -0.55% -$11,562.88

Bid Items & Bid Tabulations

46 Total 0 of 46
SMITH  |  US 69  |  TYLER  |  0191-01-092  |  04/08/2020  |  $2,825,314.91  |  NH 2020(705)  |  REPAIR AND RESURF ROADWAY  |  43 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
EAST TEXAS BRIDGE, INC.
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (DRIVEWAYS)
SY 200.000 $13.000 $82.000 $25.000 $54.000
REMOVING CONC (CURB)
LF 50.000 $2.250 $69.000 $10.000 $13.000
REMOVING CONC (CURB AND GUTTER)
LF 512.000 $10.000 $27.000 $10.000 $20.000
FURNISHING AND PLACING TOPSOIL (3")
SY 761.000 $1.250 $16.500 $10.000 $2.150
BLOCK SODDING
SY 761.000 $3.000 $7.250 $10.000 $9.000
VEGETATIVE WATERING
MG 8.000 $10.000 $375.000 $30.000 $60.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 500.000 $48.000 $76.000 $60.000 $97.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 2,500.000 $42.000 $30.000 $25.000 $39.000
PLANE ASPH CONC PAV (2")
SY 73,101.000 $2.000 $1.500 $2.500 $3.180
RAIL (TY C223)
LF 134.000 $130.000 $279.000 $200.000 $210.000
ADJUSTING MANHOLES & INLETS
EA 2.000 $405.000 $2,550.000 $1,000.000 $2,900.000
MOBILIZATION
LS 1.000 $1,400,000.000 $300,000.000 $200,000.000 $206,422.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $7,500.000 $3,000.000 $60,000.000 $32,000.000
CONC CURB (TY II)
LF 50.000 $13.000 $21.000 $30.000 $25.000
CONC CURB & GUTTER (TY II)
LF 512.000 $25.000 $58.000 $60.000 $65.000
DRIVEWAYS (CONC) (HES)
SY 676.000 $102.000 $94.000 $95.000 $120.000
CONC SIDEWALKS (4")
SY 28.000 $65.000 $94.000 $60.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,818.000 $0.350 $0.500 $0.830 $0.770
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,970.000 $0.550 $0.500 $0.830 $0.770
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 1,748.000 $1.620 $2.600 $3.000 $2.650
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 845.000 $2.400 $3.500 $4.000 $3.650
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 4,062.000 $0.200 $0.500 $0.830 $0.770
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 19,478.000 $0.200 $0.500 $0.830 $0.770
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 66.000 $3.000 $3.700 $4.000 $3.700
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 2,141.000 $1.050 $1.700 $2.000 $1.040
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 2,760.000 $0.900 $1.500 $2.000 $1.040
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 130.000 $0.800 $1.000 $1.100 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,650.000 $0.950 $1.000 $1.100 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,668.000 $2.650 $3.700 $4.000 $3.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 809.000 $4.250 $5.750 $6.000 $5.750
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 66.000 $5.800 $5.750 $6.000 $5.750
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,718.000 $0.450 $0.650 $0.720 $0.700
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,062.000 $0.350 $0.650 $0.720 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 19,478.000 $0.400 $0.650 $0.720 $0.700
PREFAB PAV MRK TY C (W) (ARROW)
EA 15.000 $200.000 $200.000 $220.000 $220.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 4.000 $350.000 $305.000 $330.000 $320.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 1.000 $325.000 $400.000 $440.000 $420.000
PREFAB PAV MRK TY C (W) (WORD)
EA 15.000 $250.000 $250.000 $300.000 $265.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 6.000 $25.000 $45.000 $50.000 $48.000
REFL PAV MRKR TY I-C
EA 116.000 $3.250 $3.400 $4.000 $3.550
REFL PAV MRKR TY II-A-A
EA 721.000 $2.800 $3.400 $4.000 $3.550
MEMBRANE UNDERSEAL
GAL 14,620.000 $3.000 $3.600 $3.000 $2.650
SP MIXES SP-C SAC-A PG70-22
TON 8,041.000 $112.000 $148.000 $139.000 $137.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 86.000 $130.000 $79.000 $200.000 $83.500
TMA (STATIONARY)
DAY 43.000 $135.000 $220.000 $300.000 $245.000
TMA (MOBILE OPERATION)
DAY 12.000 $120.000 $1.000 $300.000 $245.000
Totals: $2,825,314.910 $2,060,599.800 $2,097,907.500 $2,109,470.380