Show Job Controls
Bid Cobra

REEVES FM 2448 (2528-01-006)

Items: 104

County: REEVES
Length: 0.0000 MILES
Highway: FM 2448
District: ODESSA
Control Number: 2528-01-006
DBE Goal: 0.0%
Project: C 2528-1-6
Guaranty: $100,000.00
Time: 239 WORKING DAYS
Engineer's Estimate: $7,922,603.47
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263211
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00199843
Project Description: WIDEN AND OVERLAY FM 2448 BETWEEN SH 17 AND IH 10.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
REEVES FM 2448 (2528-01-006)
Project Name: N/A
Project: C 2528-1-6
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: SH 17
Limits To: IH 10
Project Description: WIDEN AND OVERLAY FM 2448 BETWEEN SH 17 AND IH 10.
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

104 Total 0 of 104
4 Added
9 Removed
19 Changed
REEVES  |  FM 2448  |  ODESSA  |  2528-01-006  |  1:00 PM AUGUST 06, 2026  |  $7,922,603.47  |  C 2528-1-6  |  REHAB EXIST ROADWAY  |  239 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Qty Changed
SUBGR WIDEN (OC)
STA 313.300
Qty Changed
EMBANK (FNL)(OC)(TY B)
CY 3,500.000
Added
BACKFILL (TY B)
STA 313.300
BLADING
HR 70.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 42,575.000
PROOF ROLLING
HR 70.000
Qty Changed
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 70,866.000
Qty Changed
PRIME COAT (MC-30)
GAL 14,177.000
Qty Changed
ASPH (AC-20-5TR)
GAL 53,857.000
Qty Changed
AGGR (TY-PB, GR-4)(SAC-A)
CY 1,182.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 2,569.000
Qty Changed
TACK COAT
GAL 12,366.000
Qty Changed
TOM-C PG76-22 SAC-A
TON 8,967.000
Qty Changed
CEM STABIL BKFL
CY 1,030.000
DRILL SHAFT (36 IN)
LF 410.000
Qty Changed
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 176.000
CL C CONC (ABUT)(HPC)
CY 54.600
CL C CONC (CAP)(HPC)
CY 42.400
CL C CONC (COLUMN)
CY 11.500
REINF CONC SLAB (HPC)
SF 8,050.000
APPROACH SLAB (HPC)
CY 91.500
PRESTR CONC GIRDER (TX28)
LF 1,040.900
RIPRAP (CONC)(5 IN)
CY 105.700
RIPRAP (MOW STRIP)(4 IN)
CY 36.000
RAIL (TY SSTR)(HPC)
LF 398.000
ARMOR JOINT (SEALED)
LF 87.000
Qty Changed
CONC BOX CULV (3 FT X 2 FT)
LF 144.000
CONC BOX CULV (4 FT X 2 FT)
LF 308.000
Added
RC PIPE (CL IV)(24 IN)
LF 1,940.000
Added
RC PIPE (CL IV)(36 IN)
LF 248.000
SET (TY I)(S= 3 FT)(HW= 2 FT)(6:1)(C)
EA 6.000
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1)(C)
EA 10.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000
Qty Changed
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 8.000
Qty Changed
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 64.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 8.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 4.000
CLEAN EXIST CULVERTS
EA 7.000
REMOV STR (BOX CULVERT)
EA 2.000
REMOV STR (SET)
EA 9.000
REMOV STR (WINGWALL)
EA 18.000
REMOV STR (HEADWALL)
EA 54.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 172.000
TMA (MOBILE OPERATION)
DAY 43.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 54.000
ROCK FILTER DAMS (REMOVE)
LF 54.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,752.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,752.000
INTERSECTIONS (ACP)
SY 721.000
DRIVEWAYS (CONC)
SY 227.000
DRIVEWAYS (ACP)
SY 2,301.000
Qty Changed
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 61,796.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 12,510.000
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
Added
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 22.000
Qty Changed
CONDT (PVC) (SCH 40) (2")
LF 4,186.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 439.000
Qty Changed
ELEC CONDR (NO.8) BARE
LF 4,760.000
Qty Changed
ELEC CONDR (NO.8) INSULATED
LF 9,520.000
GROUND BOX TY A (122311)W/APRON
EA 5.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 28.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000
REMOVE SM RD SN SUP&AM
EA 52.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
EA 12.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 54.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 125,727.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 125,727.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,000.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 75.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,389.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 62,660.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 7,372.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 6,167.000
PREFAB PM TY C (W)(24")(SLD)
LF 48.000
PREFAB PM TY C (W)(ARROW)
EA 6.000
PREFAB PM TY C (W)(WORD)
EA 5.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 8.000
REFL PAV MRKR TY I-C
EA 126.000
REFL PAV MRKR TY II-A-A
EA 460.000
Qty Changed
BONDING COURSE
GAL 30,908.000
2A Qty Changed
THERMOPLASTIC PIPE (PP) (24")
LF 20.000
3A
THERMOPLASTIC PIPE (PP) (30")
LF 20.000
Removed EXCAV (ROADWAY) CY 6,465.000
Removed SET (TY II) (18 IN) (RCP) (6: 1) (C) EA 22.000
Removed IN RD IL (TY SA) 40T-12 (250W EQ) LED EA 18.000
1 Removed RC PIPE (CL III)(18 IN) LF 724.000
1A Removed THERMOPLASTIC PIPE (PP) (18") LF 724.000
2 Removed RC PIPE (CL III)(24 IN) LF 1,184.000
3 Removed RC PIPE (CL III)(30 IN) LF 20.000
4 Removed RC PIPE (CL III)(36 IN) LF 216.000
4A Removed THERMOPLASTIC PIPE (PP) (36") LF 216.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $25,000.00
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $100,000.00