Show Job Controls
Bid Cobra

REEVES IH 10 (0441-09-054)

Items: 65

County: REEVES
Length: 0.0000 MILES
Highway: IH 10
District: ODESSA
Control Number: 0441-09-054
DBE Goal: 0.0%
Project: F 2025(313)
Guaranty: $100,000.00
Time: 160 WORKING DAYS
Engineer's Estimate: $17,312,839.88
Date: 1:00 PM AUGUST 05, 2026 (in 5 weeks)
Contract Number: 8263009
Type: HIGHWAY IMPROVEMENT
Project ID: A00187841
Contract Type: Federal
Project Description: ROADWAY REHABILITATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
REEVES IH 10 (0441-09-054)
Project Name: N/A
Project: F 2025(313)
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: 1.2 MI E OF FM 3078
Limits To: 1.6 MI W OF FM 2903
Project Description: ROADWAY REHABILITATION
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

65 Total 0 of 65
2 Changed
REEVES  |  IH 10  |  ODESSA  |  0441-09-054  |  1:00 PM AUGUST 05, 2026  |  $17,312,839.88  |  F 2025(313)  |  HWY IMPRV  |  160 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 490,454.000
BLADING
HR 80.000
PROOF ROLLING
HR 60.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 490,454.000
Qty Changed
PRIME COAT (AE-P)
GAL 98,092.000
ASPH (AC-20-5TR)
GAL 186,372.000
AGGR (TY-PB, GR-4)(SAC-A)
CY 4,086.000
SP MIXES SP-B SAC-B PG70-22
TON 42,592.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 24.000
MOBILIZATION
LS 1.000
Qty Changed
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000
TMA (STATIONARY)
DAY 160.000
TMA (MOBILE OPERATION)
DAY 22.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 5,640.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5,640.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 232,320.000
MTL W-BEAM GD FEN (STEEL POST)
LF 10,498.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 44.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 42.000
MTL BM GD FEN TRANS (NON - SYM)
EA 44.000
CONNECTOR PLATE FOR THRIE BEAM
EA 44.000
REMOVE METAL BEAM GUARD FENCE
LF 8,248.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 24.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 44.000
GUARDRAIL END TREATMENT (INSTALL)
EA 42.000
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000
CONDT (PVC) (SCH 40) (2")
LF 300.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 200.000
ELEC CONDR (NO.14) INSULATED
LF 1,000.000
GROUND BOX TY A (122311)W/APRON
EA 4.000
ALUMINUM SIGNS (TY G)
SF 157.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 22.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 9.000
REMOVE SM RD SN SUP&AM
EA 40.000
INSTALL LRSS (STRUCT STEEL)
LB 1,180.000
REMOVE LRSA
EA 2.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 88.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 48.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 103.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 48.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 40.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 103.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 12.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 191.000
INSTL OM ASSM (OM-3L)(TWT)GNDHH
EA 12.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 29,060.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 116,216.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 116,216.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 36,784.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 29,060.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 116,216.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 116,216.000
REFL PAV MRKR TY II-C-R
EA 1,452.000
ELIM EXT PM & MRKS (6")
LF 261,492.000
ELIM EXT PM & MRKRS (PLOWABLE RPMS)
EA 1,452.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000
INSTALL OF FOUNDATION (PEDESTAL POLE)
LF 1.000
INSTALL RADAR VEHICLE DETECTION SYSTEM
EA 2.000
BONDING COURSE
GAL 49,074.000
AUTO PORT SMART TRAFFIC MONITORING SYS
DAY 160.000
1
STONE-MTRX-ASPH SMAR-F SAC-A
TON 40,462.000
1A
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 40,462.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $75,000.00
Total: $100,000.00