|
|
|
PREPARING ROW
|
STA
|
495.300
|
$1,500.000
|
$1,700.000
|
$1,450.000
|
$1,557.000
|
$2,500.000
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
58.800
|
$25.000
|
$25.000
|
$25.000
|
$40.000
|
$100.000
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
495.300
|
$162.000
|
$260.000
|
$250.000
|
$230.000
|
$200.000
|
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
322.300
|
$30.000
|
$25.000
|
$50.000
|
$15.000
|
$50.000
|
|
|
|
BACKFILL (TY B)
|
STA
|
495.300
|
$194.000
|
$260.000
|
$200.000
|
$250.000
|
$250.000
|
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
495.300
|
$177.060
|
$260.000
|
$250.000
|
$240.000
|
$200.000
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
227,241.000
|
$0.090
|
$0.150
|
$0.120
|
$0.120
|
$0.150
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
227,241.000
|
$0.090
|
$0.150
|
$0.120
|
$0.120
|
$0.150
|
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
454,481.000
|
$0.240
|
$0.400
|
$0.270
|
$0.270
|
$0.450
|
|
|
|
VEGETATIVE WATERING
|
MG
|
2,727.000
|
$9.000
|
$3.760
|
$10.000
|
$0.010
|
$25.000
|
|
|
|
FL BS (RDWY DEL) (TY A GR 4)
|
TON
|
83,105.620
|
$40.000
|
$40.720
|
$39.000
|
$39.000
|
$45.000
|
|
|
|
REWORK BS MATL (TY C)(7")(ORD COMP)
|
SY
|
117,831.000
|
$1.750
|
$2.060
|
$2.000
|
$2.600
|
$5.000
|
|
|
|
CEMENT
|
TON
|
1,722.000
|
$250.000
|
$245.000
|
$250.000
|
$280.000
|
$275.000
|
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(11")
|
SY
|
154,606.000
|
$5.250
|
$2.150
|
$2.390
|
$3.300
|
$6.000
|
|
|
|
ASPH (AC-20XP)
|
GAL
|
126,776.000
|
$5.000
|
$4.940
|
$4.600
|
$6.120
|
$6.000
|
|
|
|
ASPH (RC-250)
|
GAL
|
43,290.000
|
$7.000
|
$5.360
|
$5.050
|
$6.500
|
$7.000
|
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
1,288.000
|
$159.000
|
$192.990
|
$250.000
|
$190.000
|
$225.000
|
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
1,473.000
|
$182.000
|
$140.250
|
$172.000
|
$160.000
|
$175.000
|
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
1,104.000
|
$160.000
|
$133.280
|
$187.000
|
$150.000
|
$175.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
798.000
|
$65.000
|
$10.000
|
$55.000
|
$65.000
|
$50.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
5.600
|
$500.000
|
$650.000
|
$650.000
|
$775.000
|
$500.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
218.100
|
$172.000
|
$269.000
|
$160.000
|
$150.000
|
$300.000
|
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
16.000
|
$780.000
|
$1,000.000
|
$750.000
|
$800.000
|
$3,000.000
|
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
74.000
|
$55.000
|
$55.000
|
$45.000
|
$50.000
|
$60.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
40.000
|
$75.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
118.000
|
$85.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
12.000
|
$90.000
|
$125.000
|
$128.000
|
$145.000
|
$100.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
106.000
|
$95.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
28.000
|
$100.000
|
$300.000
|
$248.000
|
$225.000
|
$250.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$7,500.000
|
$7,000.000
|
$4,500.000
|
$5,000.000
|
$10,000.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
5.000
|
$8,000.000
|
$10,000.000
|
$5,100.000
|
$6,775.000
|
$20,000.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$15,000.000
|
$12,000.000
|
$9,000.000
|
$9,500.000
|
$20,000.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 66 IN)
|
EA
|
2.000
|
$22,000.000
|
$20,000.000
|
$12,000.000
|
$12,000.000
|
$20,000.000
|
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$12,000.000
|
$15,000.000
|
$15,000.000
|
$12,500.000
|
$15,000.000
|
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$15,000.000
|
$16,000.000
|
$16,000.000
|
$13,500.000
|
$18,000.000
|
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
88.000
|
$700.000
|
$625.000
|
$524.000
|
$650.000
|
$500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,500.000
|
$650.000
|
$524.000
|
$800.000
|
$500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
86.000
|
$762.000
|
$850.000
|
$686.000
|
$950.000
|
$750.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
25.000
|
$2,000.000
|
$1,000.000
|
$767.000
|
$975.000
|
$1,000.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,300.000
|
$1,500.000
|
$1,300.000
|
$1,275.000
|
$1,000.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,100.000
|
$1,600.000
|
$1,377.000
|
$1,600.000
|
$3,000.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,520.000
|
$2,000.000
|
$1,900.000
|
$1,750.000
|
$3,000.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
13.000
|
$3,000.000
|
$3,000.000
|
$2,904.000
|
$1,970.000
|
$3,000.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,000.000
|
$7,000.000
|
$5,873.000
|
$6,750.000
|
$8,000.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
157.000
|
$2,000.000
|
$450.000
|
$1,000.000
|
$900.000
|
$500.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$1,000.000
|
$750.000
|
$3,000.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
550.000
|
$28.000
|
$10.000
|
$50.000
|
$6.000
|
$20.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$944,755.530
|
$638,803.000
|
$1,000,000.000
|
$654,000.000
|
$1,000,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$6,000.000
|
$8,000.000
|
$1,636.000
|
$5,432.000
|
$5,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,455.000
|
$36.250
|
$50.000
|
$35.000
|
$34.000
|
$75.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,455.000
|
$8.740
|
$15.000
|
$10.000
|
$10.000
|
$20.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
444.000
|
$5.700
|
$20.000
|
$15.000
|
$15.000
|
$50.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$2.370
|
$15.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,505.000
|
$2.800
|
$5.000
|
$5.000
|
$4.000
|
$5.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,505.000
|
$1.000
|
$2.000
|
$1.500
|
$1.000
|
$2.000
|
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$4,000.000
|
$4,000.000
|
$7,500.000
|
$8,000.000
|
$25,000.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,155.620
|
$56.400
|
$61.610
|
$75.000
|
$87.000
|
$80.000
|
|
|
|
TURNOUTS (ACP)
|
SY
|
1,424.000
|
$83.000
|
$71.100
|
$85.000
|
$89.000
|
$100.000
|
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,201.660
|
$30.000
|
$31.880
|
$30.000
|
$42.000
|
$50.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
66.000
|
$347.000
|
$262.000
|
$240.000
|
$215.000
|
$500.000
|
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
5.000
|
$520.000
|
$292.000
|
$300.000
|
$325.000
|
$500.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$520.000
|
$592.000
|
$600.000
|
$900.000
|
$1,000.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
75.000
|
$800.000
|
$534.000
|
$650.000
|
$680.000
|
$750.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$801.000
|
$619.000
|
$1,000.000
|
$770.000
|
$800.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$850.000
|
$994.000
|
$1,000.000
|
$1,290.000
|
$1,000.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$900.000
|
$1,182.000
|
$1,250.000
|
$1,010.000
|
$1,000.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
5.000
|
$1,200.000
|
$1,424.000
|
$1,500.000
|
$1,670.000
|
$1,500.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
76.000
|
$89.000
|
$76.000
|
$100.000
|
$76.000
|
$100.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
50.000
|
$59.000
|
$69.000
|
$80.000
|
$50.000
|
$75.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
42.000
|
$27.540
|
$25.000
|
$50.000
|
$50.000
|
$30.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
98,915.000
|
$0.150
|
$0.400
|
$0.400
|
$0.400
|
$0.650
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
8,263.000
|
$0.250
|
$0.470
|
$0.470
|
$0.470
|
$1.100
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
54,148.000
|
$0.150
|
$0.400
|
$0.450
|
$0.400
|
$0.650
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,278.000
|
$6.000
|
$5.000
|
$5.000
|
$5.000
|
$5.500
|
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
800.000
|
$3.000
|
$2.000
|
$2.000
|
$2.000
|
$3.000
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
22.000
|
$20.000
|
$10.000
|
$30.000
|
$15.000
|
$15.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
6,000.000
|
$2.000
|
$1.500
|
$1.500
|
$1.500
|
$3.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
15,588.000
|
$2.000
|
$2.250
|
$1.000
|
$0.750
|
$4.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
88.000
|
$24.600
|
$10.000
|
$10.000
|
$10.000
|
$8.000
|
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
98,915.000
|
$0.650
|
$1.200
|
$1.200
|
$1.200
|
$1.200
|
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
8,263.000
|
$0.650
|
$1.400
|
$1.400
|
$1.400
|
$1.550
|
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
54,148.000
|
$0.650
|
$1.200
|
$1.200
|
$1.200
|
$1.250
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,126.000
|
$3.200
|
$5.000
|
$5.000
|
$5.000
|
$6.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
6,800.000
|
$1.000
|
$0.600
|
$0.600
|
$0.600
|
$1.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
154.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$6.000
|
|
|
|
THERMO PIPE(18")(PP)(TY S)(TY II)
|
LF
|
72.000
|
$75.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
THERMO PIPE(24")(PP)(TY S)(TY II)
|
LF
|
72.000
|
$85.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
THERMO PIPE(36")(PP)(TY S)(TY II)
|
LF
|
64.000
|
$95.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$15,000.000
|
$20,000.000
|
$20,000.000
|
$10,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
439.000
|
$200.000
|
$150.000
|
$150.000
|
$180.000
|
$200.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
116.000
|
$32.000
|
$150.000
|
$100.000
|
$75.000
|
$250.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
112.000
|
$75.000
|
$60.000
|
$48.000
|
$60.000
|
$100.000
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
190.000
|
$85.000
|
$85.000
|
$65.000
|
$85.000
|
$200.000
|
|
3
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
170.000
|
$95.000
|
$175.000
|
$178.000
|
$175.000
|
$500.000
|
|
Totals: |
$10,433,450.796
|
$9,798,191.235
|
$9,828,455.140
|
$10,052,884.550
|
$12,750,037.150
|