RED RIVER US 271 (0221-02-026)

Items: 37

County: RED RIVER
Length: N/A
Highway: US 271
District: PARIS
Control Number: 0221-02-026
DBE Goal: N/A
Project: STP 2018(610)HES
Guaranty: N/A
Time: 93 WORKING DAYS
Engineer's Estimate: $944,080.00
Date: 03/07/2018 (8 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (11)
E
Engineer's Estimate
$944,080.00
$841,028.20
Over/Under Est: -10.92% -$103,051.80
$864,156.50
Over/Under Est: -8.47% -$79,923.50
Amt Left: 2.75% $23,128.30
$882,719.04
Over/Under Est: -6.5% -$61,360.96
Amt Left: 4.96% $41,690.84
Delta: -2.15% -$18,562.54
Over/Under Est: -5.1% -$48,189.20
Amt Left: 6.52% $54,862.60
Delta: -1.49% -$13,171.76
Over/Under Est: 1.61% $15,165.00
Amt Left: 14.06% $118,216.80
Delta: -7.07% -$63,354.20
Over/Under Est: 12.11% $114,286.40
Amt Left: 25.84% $217,338.20
Delta: -10.33% -$99,121.40
Over/Under Est: 23.8% $224,655.35
Amt Left: 38.97% $327,707.15
Delta: -10.43% -$110,368.95
$1,177,733.00
Over/Under Est: 24.75% $233,653.00
Amt Left: 40.03% $336,704.80
Delta: -0.77% -$8,997.65
Over/Under Est: 29.15% $275,244.40
Amt Left: 44.98% $378,296.20
Delta: -3.53% -$41,591.40
Over/Under Est: 32.39% $305,803.00
Amt Left: 48.61% $408,854.80
Delta: -2.51% -$30,558.60
Over/Under Est: 32.61% $307,834.56
Amt Left: 48.86% $410,886.36
Delta: -0.16% -$2,031.56

Bid Items & Bid Tabulations

37 Total 0 of 37
RED RIVER  |  US 271  |  PARIS  |  0221-02-026  |  03/07/2018  |  $944,080.00  |  STP 2018(610)HES  |  HAZARD ELIM & SAFETY  |  93 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
CDM HOLDINGS, LLC
H. V. CAVER, INC.
EAST TEXAS BRIDGE, INC.
HARTBEAT CONSTRUCTION
LONGVIEW BRIDGE AND ROAD, LTD.
SOUTH TEXAS ILLUMINATION, LLC
FNH CONSTRUCTION, LLC
HARRISON, WALKER AND HARPER, LP
CHAMPION INFRASTRUCTURE, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EXCAVATION (CHANNEL)
CY 63.000 $12.000 $10.000 $49.000 $20.000 $20.000 $25.000 $27.000 $25.250 $20.000 $3.600 $40.000 $60.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 94.000 $16.850 $30.000 $72.000 $35.000 $30.000 $32.000 $40.000 $39.000 $35.000 $19.300 $65.000 $100.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 17,886.000 $0.350 $0.200 $0.250 $0.310 $0.300 $0.500 $0.400 $1.100 $0.500 $1.800 $0.500 $0.460
VEGETATIVE WATERING
MG 307.000 $10.000 $10.000 $32.500 $25.000 $15.000 $40.000 $25.000 $13.500 $50.000 $240.000 $120.000 $1.000
CUT & RESTORING PAV
SY 327.000 $150.000 $180.000 $80.000 $140.000 $55.000 $167.000 $63.000 $160.000 $85.000 $116.200 $170.000 $240.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 35.000 $175.000 $200.000 $157.500 $140.000 $200.000 $165.000 $210.000 $184.000 $155.000 $129.000 $180.000 $280.000
RIPRAP (MOW STRIP)(4 IN)
CY 108.000 $390.000 $400.000 $500.000 $415.000 $420.000 $400.000 $380.000 $300.000 $550.000 $864.000 $430.000 $600.000
RETROFIT RAIL (TY T131RC)
LF 540.000 $145.000 $145.000 $145.000 $147.000 $160.000 $180.000 $225.000 $178.000 $165.000 $173.000 $205.000 $200.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 24.000 $625.000 $300.000 $800.000 $375.000 $600.000 $400.000 $840.000 $635.000 $550.000 $1,020.000 $570.000 $2,000.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 36.000 $600.000 $500.000 $800.000 $475.000 $600.000 $590.000 $890.000 $658.000 $650.000 $1,026.000 $590.000 $2,200.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 44.000 $700.000 $500.000 $800.000 $600.000 $600.000 $620.000 $920.000 $702.000 $750.000 $1,127.000 $650.000 $2,600.000
RC PIPE (CL III)(18 IN)
LF 1,022.000 $55.000 $32.000 $47.500 $34.540 $45.000 $50.000 $60.000 $66.000 $65.000 $62.100 $75.000 $60.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $6,500.000 $5,000.000 $9,500.000 $8,500.000 $4,500.000 $8,750.000 $17,700.000 $9,585.000 $9,500.000 $20,564.000 $9,200.000 $6,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $12,000.000 $7,000.000 $11,750.000 $16,000.000 $9,000.000 $10,000.000 $21,900.000 $17,745.000 $12,500.000 $23,199.000 $16,500.000 $10,000.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 9.000 $5,000.000 $5,500.000 $3,850.000 $4,500.000 $4,000.000 $3,750.000 $4,000.000 $6,625.000 $8,500.000 $9,235.000 $6,200.000 $1,800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 200.000 $600.000 $576.000 $590.000 $575.000 $550.000 $630.000 $750.000 $915.000 $800.000 $711.000 $850.000 $800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $800.000 $676.000 $825.000 $756.000 $700.000 $650.000 $940.000 $1,630.000 $1,850.000 $1,329.000 $1,400.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 30.000 $1,050.000 $1,075.000 $975.000 $845.000 $1,000.000 $970.000 $1,150.000 $1,560.000 $2,200.000 $1,503.000 $1,600.000 $1,200.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 16.000 $1,400.000 $2,050.000 $1,750.000 $2,100.000 $2,500.000 $3,200.000 $1,860.000 $2,870.000 $3,000.000 $2,889.000 $2,800.000 $1,800.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 2.000 $6,500.000 $9,000.000 $7,000.000 $7,500.000 $8,000.000 $11,050.000 $7,210.000 $3,850.000 $5,000.000 $6,732.000 $3,500.000 $8,000.000
REMOV STR (PIPE)
EA 44.000 $450.000 $200.000 $272.500 $200.000 $375.000 $275.000 $380.000 $460.000 $250.000 $394.000 $410.000 $400.000
MOBILIZATION
LS 1.000 $90,000.000 $100,000.000 $75,000.000 $100,000.000 $85,000.000 $64,000.000 $100,000.000 $111,000.000 $100,000.000 $60,348.000 $120,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,500.000 $2,000.000 $4,500.000 $2,500.000 $10,000.000 $8,000.000 $2,800.000 $2,791.000 $8,500.000 $1,543.000 $6,500.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 160.000 $25.000 $25.000 $25.000 $34.500 $27.000 $35.000 $30.000 $42.000 $30.000 $38.300 $45.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $8.500 $16.000 $8.000 $9.500 $3.000 $25.000 $11.000 $12.000 $15.000 $14.300 $20.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,190.000 $2.250 $2.500 $2.500 $1.750 $4.000 $4.000 $3.500 $1.850 $4.000 $2.300 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,190.000 $0.750 $1.000 $1.000 $0.500 $0.500 $2.000 $1.500 $0.600 $2.000 $0.800 $2.000 $1.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,200.000 $25.000 $23.000 $23.000 $23.000 $25.000 $28.000 $22.000 $26.500 $30.000 $28.000 $34.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 24.000 $1,650.000 $1,485.000 $1,485.000 $2,735.000 $1,800.000 $1,550.000 $1,600.000 $2,460.000 $1,500.000 $1,776.000 $2,300.000 $1,400.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $24.000 $25.000 $25.000 $25.000 $30.000 $32.000 $28.000 $27.650 $35.000 $30.000 $40.000 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 2,450.000 $5.500 $2.000 $2.000 $2.000 $3.000 $2.500 $2.500 $3.650 $3.000 $2.400 $8.000 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 28.000 $2,100.000 $1,300.000 $1,300.000 $1,300.000 $1,500.000 $1,625.000 $2,500.000 $3,300.000 $2,500.000 $1,554.000 $2,600.000 $2,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $250.000 $200.000 $200.000 $200.000 $220.000 $200.000 $200.000 $360.000 $1,500.000 $239.000 $300.000 $160.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 40.000 $65.000 $45.000 $45.000 $45.000 $50.000 $57.000 $45.000 $162.000 $100.000 $53.800 $60.000 $60.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 20.000 $55.000 $45.000 $45.000 $45.000 $50.000 $57.000 $46.000 $162.000 $100.000 $53.800 $80.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 40.000 $30.000 $20.000 $29.000 $20.000 $30.000 $30.000 $35.000 $48.000 $100.000 $23.900 $60.000 $60.000
TMA (STATIONARY)
DAY 90.000 $300.000 $175.000 $100.000 $200.000 $200.000 $100.000 $215.000 $120.000 $150.000 $201.000 $110.000 $100.000
Totals: $944,080.000 $841,028.200 $864,156.500 $882,719.040 $895,890.800 $959,245.000 $1,058,366.400 $1,168,735.350 $1,177,733.000 $1,219,324.400 $1,249,883.000 $1,251,914.560