PREPARING ROW
|
STA
|
60.000
|
$1,000.000
|
$2,500.000
|
$2,800.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
891.000
|
$12.000
|
$25.000
|
$12.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
6,684.000
|
$12.000
|
$10.000
|
$12.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
893.000
|
$32.000
|
$30.000
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
114.760
|
$300.000
|
$250.000
|
$300.000
|
|
|
BLOCK SODDING
|
SY
|
16,532.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
8,269.000
|
$0.250
|
$0.100
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
8,269.000
|
$0.250
|
$0.100
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
107.200
|
$50.000
|
$100.000
|
$12.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
115.000
|
$9.500
|
$10.000
|
$45.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,982.000
|
$36.000
|
$45.000
|
$40.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
52.000
|
$450.000
|
$500.000
|
$475.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
94.000
|
$150.000
|
$180.000
|
$130.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
640.000
|
$450.000
|
$450.000
|
$500.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
35.000
|
$450.000
|
$576.000
|
$500.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
10.000
|
$500.000
|
$950.000
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
163.000
|
$850.000
|
$850.000
|
$500.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
24.000
|
$1,000.000
|
$838.000
|
$500.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
12.000
|
$1,000.000
|
$890.000
|
$600.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
28.000
|
$1,200.000
|
$900.000
|
$600.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
23.000
|
$1,000.000
|
$950.000
|
$700.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
|
LF
|
25.000
|
$1,250.000
|
$1,000.000
|
$800.000
|
|
|
CONC BOX CULV (9 FT X 6 FT)(EXTEND)
|
LF
|
4.000
|
$1,400.000
|
$1,500.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
138.000
|
$65.000
|
$80.000
|
$65.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
158.000
|
$110.000
|
$97.000
|
$80.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
196.000
|
$125.000
|
$166.000
|
$125.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
27.000
|
$150.000
|
$186.000
|
$200.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
103.000
|
$225.000
|
$211.000
|
$300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
4.000
|
$10,500.000
|
$9,000.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$7,500.000
|
$5,500.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$9,500.000
|
$7,000.000
|
$15,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$8,500.000
|
$7,200.000
|
$5,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
3.000
|
$9,500.000
|
$8,000.000
|
$5,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$12,500.000
|
$9,000.000
|
$7,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
18.000
|
$13,000.000
|
$14,000.000
|
$11,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
6.000
|
$14,000.000
|
$15,400.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$900.000
|
$668.000
|
$600.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$750.000
|
$678.000
|
$625.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
15.000
|
$1,300.000
|
$1,121.000
|
$950.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$2,000.000
|
$2,039.000
|
$1,700.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,900.000
|
$2,300.000
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
9.000
|
$5,000.000
|
$2,500.000
|
$2,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$5,500.000
|
$3,968.000
|
$4,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,750.000
|
$3,938.000
|
$3,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$750.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
25.000
|
$1,300.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
20.000
|
$1,200.000
|
$500.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
142.000
|
$15.000
|
$50.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$234,917.920
|
$260,000.000
|
$280,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$5,000.000
|
$5,000.000
|
$16,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
720.000
|
$35.000
|
$35.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
720.000
|
$8.000
|
$5.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,784.000
|
$2.000
|
$2.150
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,784.000
|
$0.800
|
$0.500
|
$1.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
7,829.000
|
$23.000
|
$17.000
|
$23.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
24.000
|
$2,000.000
|
$1,350.000
|
$1,800.000
|
|
|
SHORT RADIUS
|
LF
|
163.000
|
$65.000
|
$37.000
|
$55.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$1,100.000
|
$900.000
|
$1,300.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
446.000
|
$65.000
|
$55.000
|
$77.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,671.000
|
$2.000
|
$2.500
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$200.000
|
$100.000
|
$250.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
24.000
|
$275.000
|
$100.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
45.000
|
$2,750.000
|
$2,275.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
22.000
|
$250.000
|
$100.000
|
$220.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
36.000
|
$15.000
|
$14.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
90.000
|
$75.000
|
$45.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
124.000
|
$25.000
|
$45.000
|
$30.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
20.000
|
$150.000
|
$100.000
|
$200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
632.000
|
$175.000
|
$200.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$75.000
|
$50.000
|
$30.000
|
|
Totals: |
$2,659,097.120
|
$2,627,582.900
|
$2,925,159.400
|