PREPARING ROW
|
STA
|
358.000
|
$42,000.000
|
$85,997.500
|
|
|
PREPARING ROW(OPT1)
|
STA
|
15.000
|
$4,000.000
|
$3,250.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
88,810.000
|
$14.000
|
$11.210
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
444.000
|
$15.750
|
$35.230
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
157.000
|
$20.000
|
$50.410
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
738.000
|
$9.400
|
$10.320
|
|
|
REMOVING CONC (CTB)
|
LF
|
30.000
|
$28.000
|
$46.750
|
|
|
REMOVE CONC (RAIL)
|
LF
|
496.000
|
$28.000
|
$26.620
|
|
|
REMOVING CONC (FLUME)
|
SY
|
151.000
|
$15.750
|
$94.050
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
34,995.000
|
$10.000
|
$7.790
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
161,189.000
|
$12.000
|
$18.610
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
158,456.000
|
$14.000
|
$38.720
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
85,584.000
|
$20.200
|
$37.050
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
96,077.000
|
$18.000
|
$28.650
|
|
|
ROAD GRADER WORK (ORD COMP)
|
SY
|
13,306.000
|
$3.000
|
$4.870
|
|
|
GENERAL USE COMPOST (1")
|
SY
|
4,668.000
|
$2.000
|
$2.920
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
384,013.000
|
$1.750
|
$4.420
|
|
|
EROSION CONTROL COMPOST (4")
|
SY
|
4,668.000
|
$6.000
|
$6.120
|
|
|
COMPOST MANUF TOPSOIL (18" AVG)
|
SY
|
4,668.000
|
$6.000
|
$14.370
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
AC
|
40.000
|
$2,230.000
|
$2,500.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
40.000
|
$610.000
|
$750.000
|
|
|
VEGETATIVE WATERING
|
MG
|
6,495.000
|
$35.000
|
$42.950
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
35,823.000
|
$2.000
|
$1.950
|
|
|
PLANT MATERIAL (45-GAL)
|
EA
|
147.000
|
$500.000
|
$1,400.000
|
|
|
PLANT BED PREP (TYPE I)
|
SY
|
4,668.000
|
$9.000
|
$5.000
|
|
|
PLANT MAINTENANCE
|
MO
|
12.000
|
$8,000.000
|
$1,500.000
|
|
|
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
|
SY
|
67,351.000
|
$40.000
|
$58.880
|
|
|
LIME (QUICKLIME (DRY))
|
TON
|
4,464.000
|
$330.000
|
$420.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
444,940.000
|
$8.000
|
$9.590
|
|
|
PRIME COAT (MC-30)
|
GAL
|
111,255.000
|
$5.500
|
$6.750
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
54,836.000
|
$35.000
|
$54.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,180.000
|
$5.000
|
$13.020
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
50,455.000
|
$5.000
|
$9.670
|
|
|
PLANE CONC PAV(0" TO 2")
|
SY
|
451.000
|
$5.000
|
$45.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
1,349.000
|
$5.000
|
$28.310
|
|
|
PLANE ASPH CONC PAV (0" TO 3 1/2")
|
SY
|
34,281.000
|
$3.000
|
$7.400
|
|
|
PLANE ASPH CONC PAV (3 1/2")
|
SY
|
13,422.000
|
$3.000
|
$8.930
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
416,184.000
|
$122.000
|
$126.230
|
|
|
CEM STABIL BKFL
|
CY
|
539.000
|
$245.000
|
$550.000
|
|
|
CUT & RESTORING PAV
|
SY
|
7,798.000
|
$200.000
|
$135.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
1,089.000
|
$300.000
|
$410.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
18.000
|
$200.000
|
$325.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
55.000
|
$245.000
|
$550.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
786.000
|
$290.000
|
$550.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
38,239.000
|
$5.330
|
$3.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
48,081.000
|
$20.000
|
$19.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
550.000
|
$340.000
|
$850.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
32.000
|
$403.000
|
$1,050.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
550.000
|
$510.000
|
$395.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
20.000
|
$619.000
|
$1,250.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
77.000
|
$138.000
|
$205.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
299.000
|
$220.000
|
$467.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
80.000
|
$250.000
|
$655.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
376.000
|
$357.000
|
$785.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
82.000
|
$403.000
|
$807.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
125.000
|
$570.000
|
$1,250.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
223.000
|
$640.000
|
$825.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
2,562.000
|
$715.000
|
$975.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
61.300
|
$1,790.000
|
$3,755.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
101.200
|
$1,764.000
|
$3,544.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
153.300
|
$1,723.000
|
$3,501.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
725.000
|
$652.000
|
$2,011.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
20,976.000
|
$44.500
|
$44.770
|
|
|
APPROACH SLAB (HPC)
|
CY
|
73.800
|
$934.000
|
$2,050.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
7,023.000
|
$90.000
|
$155.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,957.580
|
$304.000
|
$899.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
169,784.000
|
$0.950
|
$1.750
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
4,949.000
|
$9.000
|
$15.100
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
3.000
|
$178.000
|
$1,424.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
74.000
|
$239.000
|
$1,350.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,778.110
|
$750.000
|
$643.920
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
3,582.000
|
$750.000
|
$793.760
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
1,365.000
|
$300.000
|
$479.360
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
507.000
|
$750.000
|
$627.780
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
166.000
|
$41.000
|
$132.560
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
228.000
|
$13.700
|
$91.200
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
228.000
|
$85.700
|
$207.860
|
|
|
RAIL (TY SSTR)
|
LF
|
15,884.000
|
$79.000
|
$117.000
|
|
|
RAIL (TY T80SS)
|
LF
|
1,675.000
|
$96.000
|
$135.000
|
|
|
RAIL (TY T80SS) (MOD)
|
LF
|
80.000
|
$125.000
|
$305.000
|
|
|
RAIL (TY PR11)
|
LF
|
537.000
|
$160.000
|
$103.400
|
|
|
RAIL (TY T80PP)
|
LF
|
16,290.000
|
$198.000
|
$138.000
|
|
|
RAIL (TY T80PP-TS)
|
LF
|
616.000
|
$400.000
|
$425.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
153.000
|
$199.000
|
$274.600
|
|
|
WATERPROOFING (TY 10)
|
SY
|
82.000
|
$165.000
|
$15.100
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
1,406.000
|
$240.000
|
$227.750
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
1,474.000
|
$350.000
|
$493.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
2,418.000
|
$400.000
|
$528.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
322.000
|
$475.000
|
$591.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
384.000
|
$525.000
|
$651.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
2,931.000
|
$475.000
|
$675.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,933.000
|
$525.000
|
$698.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
5,652.000
|
$575.000
|
$809.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
2,592.000
|
$720.000
|
$885.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
1,187.000
|
$740.000
|
$888.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
2,280.000
|
$720.000
|
$869.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
2,317.000
|
$770.000
|
$997.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
5,408.000
|
$800.000
|
$1,197.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
215.000
|
$650.000
|
$825.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
994.000
|
$140.000
|
$165.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8,753.000
|
$155.000
|
$188.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,698.000
|
$175.000
|
$199.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
8,253.000
|
$210.000
|
$226.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,554.000
|
$260.000
|
$291.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
839.000
|
$300.000
|
$429.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
14.000
|
$8,300.000
|
$6,714.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
1.000
|
$7,350.000
|
$8,242.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
5.000
|
$10,000.000
|
$7,657.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
1.000
|
$12,500.000
|
$9,317.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
3.000
|
$9,000.000
|
$10,899.000
|
|
|
INLET (COMPL)(PMBD)(4FT)
|
EA
|
10.000
|
$7,700.000
|
$12,325.000
|
|
|
INLET (COMPL)(POD)(SFG)(3FTX3FT)
|
EA
|
11.000
|
$7,700.000
|
$10,850.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$8,300.000
|
$14,888.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
29.000
|
$8,700.000
|
$9,629.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
68.000
|
$8,000.000
|
$11,490.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$9,500.000
|
$11,689.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX5FT)
|
EA
|
93.000
|
$8,000.000
|
$12,725.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX5FT)
|
EA
|
2.000
|
$9,500.000
|
$14,318.000
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX3FT)
|
EA
|
1.000
|
$14,000.000
|
$20,531.000
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX5FT)
|
EA
|
3.000
|
$15,000.000
|
$22,400.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$9,600.000
|
$13,560.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
55.000
|
$9,000.000
|
$9,899.000
|
|
|
INLET (COMPL)(TY MSE2)
|
EA
|
10.000
|
$11,200.000
|
$16,882.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
2.000
|
$75,000.000
|
$186,429.680
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$20,990.000
|
$47,948.520
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
4.000
|
$35,145.000
|
$54,604.950
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$44,000.000
|
$55,537.660
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
1.000
|
$15,290.000
|
$56,916.990
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (C)
|
EA
|
1.000
|
$8,500.000
|
$11,136.130
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
1.000
|
$9,000.000
|
$17,843.090
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$10,300.000
|
$19,683.240
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
4.000
|
$12,960.000
|
$13,315.500
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(4:1) (C)
|
EA
|
1.000
|
$8,500.000
|
$13,182.830
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
1.000
|
$9,350.000
|
$14,822.090
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$13,840.000
|
$15,908.640
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$11,000.000
|
$15,463.170
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
10.000
|
$12,000.000
|
$13,858.550
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
$15,550.000
|
$26,344.720
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (P)
|
EA
|
2.000
|
$22,000.000
|
$26,362.740
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
$25,000.000
|
$31,821.350
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,520.000
|
$2,772.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$2,365.000
|
$2,872.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
5.000
|
$1,740.000
|
$2,879.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,270.000
|
$3,127.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
13.000
|
$2,700.000
|
$3,129.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,800.000
|
$5,090.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$5,712.000
|
$5,829.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$6,397.000
|
$6,182.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$7,650.000
|
$8,868.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$6,900.000
|
$11,925.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (P)
|
EA
|
7.000
|
$8,000.000
|
$14,621.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$8,333.000
|
$16,818.000
|
|
|
SET (TY II) (60 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$17,500.000
|
$23,675.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
8.000
|
$1,625.000
|
$12,500.000
|
|
|
MILLING CONCRETE SLAB (1 IN)
|
SY
|
588.000
|
$15.000
|
$27.870
|
|
|
MILLING CONCRETE SLAB (1/4IN)
|
SY
|
2,436.000
|
$15.000
|
$21.790
|
|
|
REMOV STR (INLET)
|
EA
|
12.000
|
$1,200.000
|
$4,500.000
|
|
|
REMOV STR (SET)
|
EA
|
44.000
|
$501.000
|
$4,250.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
24.000
|
$1,565.000
|
$12,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
13.000
|
$1,450.000
|
$4,900.000
|
|
|
REMOV STR (PIPE)
|
LF
|
6,479.000
|
$33.000
|
$39.500
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
32.000
|
$128.000
|
$495.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$192,800.000
|
$375,000.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
11.000
|
$2,500.000
|
$2,900.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
4,848.000
|
$4.400
|
$7.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$20,000,000.000
|
$31,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
55.000
|
$45,000.000
|
$96,425.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
152.000
|
$125.000
|
$85.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
152.000
|
$13.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
3,120.000
|
$45.000
|
$32.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
3,120.000
|
$10.000
|
$25.000
|
|
|
BLADING WORK (EROSION & SEDMT CONT)
|
HR
|
1,913.000
|
$175.000
|
$65.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
6,186.000
|
$7.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
9,679.000
|
$11.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
15,865.000
|
$1.600
|
$1.500
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
111,665.000
|
$150.000
|
$136.880
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
23,451.000
|
$150.000
|
$140.730
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
67,500.000
|
$72.000
|
$107.220
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
22,540.000
|
$11.800
|
$14.660
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
720.000
|
$13.900
|
$61.540
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
336,840.000
|
$11.000
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
13,300.000
|
$11.000
|
$20.690
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
620.000
|
$11.000
|
$20.690
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
67,500.000
|
$20.000
|
$7.230
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
22,540.000
|
$13.400
|
$6.370
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
720.000
|
$14.600
|
$56.660
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
23,528.000
|
$162.000
|
$149.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) SPECIAL
|
LF
|
40.000
|
$255.000
|
$475.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) SPECIAL
|
LF
|
106.500
|
$165.000
|
$535.000
|
|
|
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
|
LF
|
140.000
|
$395.000
|
$405.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
403.000
|
$100.000
|
$92.260
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,136.000
|
$25.500
|
$52.550
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,976.000
|
$92.000
|
$118.250
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,600.000
|
$37.000
|
$38.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
41.000
|
$2,415.000
|
$3,099.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
11.000
|
$1,565.000
|
$2,270.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,500.000
|
$3.000
|
$3.750
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$322.000
|
$525.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
15.000
|
$334.000
|
$525.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$352.000
|
$825.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
1,800.000
|
$18.000
|
$18.750
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
4.000
|
$6,000.000
|
$3,100.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
33,440.000
|
$4.700
|
$5.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
18.000
|
$613.000
|
$560.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
52.000
|
$3,600.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$319.000
|
$740.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
48.000
|
$3,500.000
|
$5,544.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
38.000
|
$2,000.000
|
$3,750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
7.000
|
$27,500.000
|
$46,800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$34,000.000
|
$52,420.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
31.000
|
$13,500.000
|
$20,988.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
40.000
|
$1,238.000
|
$3,200.000
|
|
|
HI MST IL POLE (150 FT)(100 MPH)
|
EA
|
60.000
|
$61,000.000
|
$63,700.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
585.000
|
$22.000
|
$22.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
250.000
|
$34.000
|
$38.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
270.000
|
$50.000
|
$30.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
450.000
|
$72.000
|
$42.500
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
36,390.000
|
$29.000
|
$21.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
8,840.000
|
$42.000
|
$33.500
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
39,830.000
|
$1.040
|
$1.870
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
30,350.000
|
$2.000
|
$2.330
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
81,662.000
|
$2.100
|
$2.550
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
12,095.000
|
$2.400
|
$2.650
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
35,670.000
|
$3.000
|
$2.970
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
4,805.000
|
$4.000
|
$3.250
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
10,145.000
|
$5.000
|
$3.650
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
220.000
|
$1,875.000
|
$1,463.000
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$365.000
|
$4,500.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$500.000
|
$12,500.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
10.000
|
$9,000.000
|
$9,350.000
|
|
|
ELC SRV TY D 120/240 060(NS)AL(N)SP(O)
|
EA
|
4.000
|
$9,000.000
|
$7,725.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
2,173.000
|
$39.000
|
$36.500
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
4,346.890
|
$39.000
|
$39.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$900.000
|
$3,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$1,200.000
|
$3,250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
227.000
|
$1,150.000
|
$1,155.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$1,500.000
|
$3,044.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
6.000
|
$1,700.000
|
$2,250.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
26.000
|
$1,700.000
|
$1,672.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
22.000
|
$1,850.000
|
$1,809.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
8.000
|
$620.000
|
$945.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
12.000
|
$4,600.000
|
$2,927.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
6.000
|
$4,000.000
|
$3,126.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
130.000
|
$200.000
|
$300.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
10,898.100
|
$10.000
|
$19.250
|
|
|
REMOVE LRSA
|
EA
|
24.000
|
$2,500.000
|
$3,500.000
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
4.000
|
$46,000.000
|
$41,250.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
5.000
|
$49,500.000
|
$46,500.000
|
|
|
INS OH SN SUP(35 FT BAL TEE)
|
EA
|
1.000
|
$64,000.000
|
$48,750.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$54,000.000
|
$49,200.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
6.000
|
$59,000.000
|
$54,250.000
|
|
|
INS OH SN SUP(60 FT BRDG)
|
EA
|
1.000
|
$63,000.000
|
$61,000.000
|
|
|
INS OH SN SUP(75 FT BRDG)
|
EA
|
2.000
|
$73,000.000
|
$74,450.000
|
|
|
INS OH SN SUP(85 FT BRDG)
|
EA
|
2.000
|
$90,000.000
|
$87,450.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$7,900.000
|
$12,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
130.000
|
$20.000
|
$33.560
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
221.000
|
$43.000
|
$32.020
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
240.000
|
$41.000
|
$14.040
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
55.000
|
$40.000
|
$32.610
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
23.000
|
$41.000
|
$56.900
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
71.000
|
$150.000
|
$129.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
14.000
|
$150.000
|
$229.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
79.000
|
$150.000
|
$129.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
89.000
|
$150.000
|
$129.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
38,738.000
|
$0.700
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
331.000
|
$1.290
|
$0.970
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
235,692.000
|
$0.700
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
|
EA
|
62.000
|
$35.000
|
$1.010
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
183,945.000
|
$0.700
|
$0.170
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
48,329.000
|
$2.000
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
572.000
|
$2.000
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
253,322.000
|
$1.400
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
|
EA
|
64.000
|
$35.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
232,695.000
|
$1.400
|
$0.500
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
2,211.000
|
$3.000
|
$1.090
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,653.000
|
$3.200
|
$1.910
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
10,198.000
|
$5.300
|
$2.720
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
826.000
|
$11.000
|
$7.060
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
3.000
|
$200.000
|
$257.630
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
5.000
|
$300.000
|
$349.550
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
30.000
|
$286.000
|
$262.680
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
10.000
|
$300.000
|
$255.610
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
20.000
|
$2,000.000
|
$1,971.540
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
19.000
|
$2,700.000
|
$2,224.300
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
84.000
|
$53.000
|
$35.390
|
|
|
PAVEMENT SEALER 6"
|
LF
|
206,798.000
|
$0.350
|
$0.110
|
|
|
PAVEMENT SEALER 12"
|
LF
|
10,952.000
|
$1.500
|
$0.120
|
|
|
PAVEMENT SEALER 24"
|
LF
|
409.000
|
$3.000
|
$1.960
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$50.000
|
$386.950
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
10.000
|
$50.000
|
$406.270
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
5.000
|
$50.000
|
$331.440
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
20.000
|
$580.000
|
$189.320
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
19.000
|
$705.000
|
$183.990
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
84.000
|
$53.000
|
$92.570
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
30.000
|
$45.000
|
$191.020
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
126,338.000
|
$0.780
|
$0.810
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
127,191.000
|
$0.780
|
$0.810
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
2,638.000
|
$3.000
|
$2.920
|
|
PLOWABLE REFL PAV MRKR TY II-C-R
|
EA
|
3,706.000
|
$108.000
|
$25.280
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
96.000
|
$7.000
|
$4.900
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
233,052.000
|
$0.600
|
$0.120
|
|
|
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
|
EA
|
61.000
|
$25.000
|
$1.290
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
12,635.000
|
$33.000
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
206,798.000
|
$0.100
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
10,952.000
|
$0.200
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
409.000
|
$1.000
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
1.000
|
$25.000
|
$15.170
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
5.000
|
$25.000
|
$40.440
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
30.000
|
$25.000
|
$12.130
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
10.000
|
$25.000
|
$12.130
|
|
|
PAV SURF PREP FOR MRK (ENTR GORE)
|
EA
|
20.000
|
$300.000
|
$25.280
|
|
|
PAV SURF PREP FOR MRK (EXIT GORE)
|
EA
|
19.000
|
$300.000
|
$25.280
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
84.000
|
$25.000
|
$5.060
|
|
|
CRACK CLEANING AND SEALING (JCP)
|
LF
|
1,268.000
|
$18.600
|
$30.810
|
|
|
FULL - WIDTH MOWING
|
CYC
|
15.000
|
$8,000.000
|
$5,500.000
|
|
|
CLEAN/SWEEP AREA 1
|
CYC
|
40.000
|
$5,000.000
|
$3,500.000
|
|
|
ANTI - GRAFFITI COATING(PERMNENT-TY II)
|
SF
|
4,941.000
|
$0.700
|
$3.440
|
|
|
DRAIN INLET CLEANING
|
EA
|
4.000
|
$750.000
|
$3,500.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
103,934.000
|
$142.000
|
$255.270
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
1,206.900
|
$180.000
|
$325.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
50,978.000
|
$156.000
|
$305.470
|
|
|
TACK COAT
|
GAL
|
56,817.000
|
$7.000
|
$14.040
|
|
|
POLYESTER POLYMER CONC OVERLAY (1")
|
SY
|
3,023.000
|
$105.000
|
$164.380
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$1,300.000
|
$1,500.000
|
|
|
PATCHING MILLED CONCRETE RUMBLE STRIPS
|
LF
|
9,986.000
|
$33.000
|
$11.250
|
|
|
FILLING MILLED ASPHALT RUMBLE STRIPS
|
LF
|
9,635.000
|
$33.000
|
$13.250
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$19,000.000
|
$32,015.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
43,205.000
|
$3.300
|
$5.760
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
38,515.000
|
$4.750
|
$6.830
|
|
|
FIBER OPTIC SPLICE ENCLOSURE
|
EA
|
1.000
|
$1,500.000
|
$2,574.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
9.000
|
$1,500.000
|
$1,245.000
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
51.000
|
$250.000
|
$226.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
1.000
|
$2,400.000
|
$7,264.000
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 1)
|
EA
|
2.000
|
$20,500.000
|
$14,258.000
|
|
|
ITS GRND MNT CAB (TY 5) (CONF 2)
|
EA
|
1.000
|
$23,000.000
|
$17,454.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
4.000
|
$19,000.000
|
$7,942.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
4.000
|
$1,800.000
|
$1,500.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
31,090.000
|
$28.000
|
$37.500
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
5,240.000
|
$48.000
|
$63.000
|
|
|
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
|
LF
|
49,782.000
|
$18.000
|
$14.410
|
|
|
CONDUIT (PREPARE)
|
LF
|
2,635.000
|
$3.000
|
$3.240
|
|
|
GROUND BOX (PREPARE)
|
EA
|
10.000
|
$920.000
|
$1,000.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
2.000
|
$29,000.000
|
$17,568.000
|
|
|
ITS POLE (50 FT)(90 MPH)
|
EA
|
2.000
|
$19,500.000
|
$19,750.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
2.000
|
$9,000.000
|
$8,500.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
6.000
|
$175.000
|
$750.000
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
60.000
|
$34,000.000
|
$37,850.000
|
|
|
REMOVE EXISTING CABLES (FIBER)
|
LF
|
2,635.000
|
$0.500
|
$2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
67.000
|
$292.000
|
$1,210.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
480.000
|
$90.000
|
$128.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
|
EA
|
75.000
|
$4,500.000
|
$5,426.000
|
|
|
TEMP Q-DETECT SYS
|
EA
|
3.000
|
$100,000.000
|
$225,000.000
|
|
|
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
|
EA
|
1.000
|
$11,000.000
|
$32,000.000
|
|
|
REMOVE HIGH MAST LIGHTING ASSEMBLY
|
EA
|
3.000
|
$8,250.000
|
$28,955.000
|
|
Totals: |
$235,609,131.260
|
$312,507,980.854
|