Show Job Controls
Bid Cobra

POTTER IH 40 (0090-05-108)

Items: 63

County: POTTER
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0090-05-108
DBE Goal: 600.0%
Project: BR 2024(730)
Guaranty: N/A
Time: 200 WORKING DAYS
Engineer's Estimate: $8,578,401.70
Date: 02/01/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
CC SYSOMBATH
KENNETH PETR
DARRELL CALDWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$8,578,401.70
$9,782,900.98
Over/Under Est: 14.04% $1,204,499.28
Over/Under Est: 18.77% $1,609,911.05
Amt Left: 4.14% $405,411.77
Subcontractor Percentage Amount
ALAMO BROTHERS CONCRETE INC 7.25% $720,276.70
M & D FOUNDATION DRILLING INDUSTRIES, INC. 3.84% $381,498.28
DUSTROL, INC. 0.88% $87,426.69
LMSE TRUCKING, LLC 0.76% $75,504.87
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.63% $62,589.56
HJC FARMS, INC. 0.63% $62,589.56
TORO BRAVO CONSTRUCTION, LLC 0.62% $61,596.08
BARRICADES UNLIMITED 0.32% $31,791.52
SCOTT DERR PAINTING CO, LLC 0.28% $27,817.58
TORO BRAVO CONSTRUCTION, LLC 0.26% $25,830.61
TRP CONSTRUCTION GROUP, LLC 0.17% $16,889.25
PENHALL COMPANY 0.11% $10,928.34
Total: 15.75% $1,564,739.04

Bid Items & Bid Tabulations

63 Total 0 of 63
POTTER  |  IH 40  |  AMARILLO  |  0090-05-108  |  02/01/2024  |  $8,578,401.70  |  BR 2024(730)  |  BRIDGE REPL  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
COPPELL CONSTRUCTION CO., INC.
REMOVING CONC (RIPRAP)
SY 2,103.000 $30.000 $60.000 $30.000
REMOVING CONC (APPR SLAB)
SY 131.000 $50.000 $115.000 $100.000
EXCAVATION (ROADWAY)
CY 7,830.000 $7.000 $33.000 $32.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 21,887.000 $18.000 $33.000 $39.000
BACKFILL (TY A)
STA 53.000 $325.000 $1,000.000 $517.000
FURNISHING AND PLACING TOPSOIL (4")
SY 10,007.000 $4.000 $5.000 $12.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
AC 9.000 $1,000.000 $645.000 $1,400.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 10,164.000 $3.000 $5.000 $2.000
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
SY 7,484.000 $20.000 $50.000 $75.000
PRIME COAT (MC-30)
GAL 1,871.000 $6.000 $10.000 $8.750
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 4,299.000 $5.000 $7.000 $10.500
CEM STABIL BKFL
CY 148.000 $500.000 $500.000 $275.000
DRILL SHAFT (18 IN)
LF 188.000 $400.000 $250.000 $125.000
DRILL SHAFT (36 IN)
LF 460.000 $500.000 $335.000 $250.000
DRILL SHAFT (48 IN)
LF 1,292.000 $600.000 $440.000 $425.000
CL C CONC (ABUT)(HPC)
CY 56.800 $2,300.000 $2,150.000 $1,720.000
CL C CONC (CAP)(HPC)
CY 124.200 $2,300.000 $2,335.000 $1,300.000
CL C CONC (COLUMN)(HPC)
CY 146.700 $2,300.000 $2,335.000 $1,600.000
CL C CONC (RAIL FOUNDATION)
CY 50.000 $600.000 $596.000 $1,300.000
REINF CONC SLAB
SF 24,840.000 $48.000 $50.500 $37.500
APPROACH SLAB
CY 96.600 $2,000.000 $2,000.000 $1,050.000
PRESTR CONC GIRDER (TX34)
LF 3,219.490 $330.000 $352.000 $350.000
EPOXY WATERPROOF FINISH (TY X)
SF 1,324.000 $21.000 $21.000 $22.000
RIPRAP (CONC)(4 IN)
CY 606.000 $800.000 $656.000 $825.000
RIPRAP (MOW STRIP)(4 IN)
CY 56.000 $650.000 $580.000 $750.000
RAIL (TY SSTR)
LF 1,486.000 $90.000 $89.000 $185.000
HEADER TYPE EXPANSION JOINT
LF 190.000 $225.000 $250.000 $225.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $500,000.000 $310,000.000 $800,000.000
MOBILIZATION
LS 1.000 $825,000.000 $970,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $30,000.000 $50,000.000 $40,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $50.000 $75.000 $52.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $18.000 $25.000 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,100.000 $8.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,100.000 $2.000 $1.000 $1.500
CONSTRUCTING DETOURS
SY 16,266.000 $24.500 $33.000 $40.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 600.000 $30.000 $25.000 $24.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 600.000 $30.000 $25.000 $18.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 720.000 $175.000 $300.000 $321.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $25.000 $33.500 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $2,800.000 $3,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,000.000 $1,425.000 $2,100.000
REMOVE METAL BEAM GUARD FENCE
LF 1,850.000 $5.000 $2.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $500.000 $200.000 $520.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $500.000 $200.000 $520.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,100.000 $3,350.000 $4,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $200.000 $525.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,500.000 $1,500.000 $4,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $9,000.000 $15,000.000 $12,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $1,000.000 $1,750.000 $800.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $45.000 $40.000 $70.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 378.000 $2.000 $2.000 $6.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 34.000 $10.000 $25.000 $30.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 8.000 $50.000 $100.000 $125.000
REFL PAV MRKR TY II-A-A
EA 70.000 $6.000 $10.000 $11.000
PAV SURF PREP FOR MRK (6")
LF 2,160.000 $0.250 $1.000 $1.250
SP MIXES SP-D SAC-A PG70-28
TON 1,521.000 $150.000 $244.000 $270.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $1,100.000 $750.000 $785.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $18,000.000 $18,500.000 $40,000.000
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 4,746.000 $1.000 $1.000 $1.250
HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL)
LF 1,235.000 $1.000 $2.000 $2.500
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 5,302.000 $1.000 $1.000 $1.250
TMA (STATIONARY)
DAY 20.000 $400.000 $550.000 $525.000
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $95.000 $200.000
Totals: $8,578,401.700 $9,782,900.980 $10,188,312.750