Show Job Controls
Bid Cobra

PARKER DENNIS RD (0902-38-134)

Items: 50

County: PARKER
Length: 0.0000 MILES
Highway: DENNIS RD
District: FORT WORTH
Control Number: 0902-38-134
DBE Goal: 0.0%
Project: BR 2021(736)
Guaranty: $36,000.00
Time: 127 WORKING DAYS
Engineer's Estimate: $1,806,940.80
Date: 1:00 PM AUGUST 05, 2026 (in 5 weeks)
Contract Number: 8263034
Type: BRIDGE REPLACEMENT
Project ID: A00065091
Contract Type: Federal
Project Description: RECONSTRUCTION OF BRIDGE & APPROACHES.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
PARKER DENNIS RD (0902-38-134)
Project Name: N/A
Project: BR 2021(736)
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: DENNIS ROAD AT PATRICK CREEK
Limits To: .
Project Description: RECONSTRUCTION OF BRIDGE & APPROACHES.
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

50 Total 0 of 50
PARKER  |  DENNIS RD  |  FORT WORTH  |  0902-38-134  |  1:00 PM AUGUST 05, 2026  |  $1,806,940.80  |  BR 2021(736)  |  BRIDGE REPL  |  127 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 7.300
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 1,160.000
EXCAV (ROADWAY)
CY 2,076.000
EMBANK (FNL)(OC)(TY C)
CY 607.000
BACKFILL (TY A OR B)
STA 6.500
BLOCK SODDING
SY 2,137.000
VEGETATIVE WATERING
TGL 75.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 1,256.000
PRIME COAT(MC-30 OR AE-P)
GAL 376.000
SP MIXES SP-C SAC-A PG70-28
TON 250.000
TACK COAT
GAL 251.000
CEM STABIL BKFL
CY 178.000
DRILL SHAFT (36 IN)
LF 469.000
CL C CONC (ABUT)(HPC)
CY 50.200
CL C CONC (CAP)(HPC)
CY 37.400
CL C CONC (COLUMN)(HPC)
CY 30.100
REINF CONC SLAB (HPC)
SF 6,300.000
APPROACH SLAB (HPC)
CY 82.000
PRESTR CONC GIRDER (TX28)
LF 742.420
RIPRAP (MOW STRIP)(4 IN)
CY 44.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 902.000
RAIL (TY T223)(HPC)
LF 348.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 85.000
REMOV STR (BOX CULVERT)
EA 2.000
REMOV STR (HEADWALL)
EA 4.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 164.000
ROCK FILTER DAMS (REMOVE)
LF 164.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,094.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,094.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
WIRE FENCE (TY C)
LF 321.000
WIRE FENCE (TY D)
LF 321.000
ALUMINUM SIGNS (TY A)
SF 1.330
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000
REMOVE SM RD SN SUP&AM
EA 12.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 2.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000
INSTL OM ASSM (OM-2Z)(WFLX)GNDHH
EA 4.000
RE PM TY II (W) 6" (SLD)
LF 402.000
RE PM TY II (Y) 6" (SLD)
LF 402.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 1,050.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 1,050.000
REFL PAV MRKR TY II-A-A
EA 14.000
PAV SURF PREP FOR MRK (6")
LF 804.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $15,000.00