Show Job Controls
Bid Cobra

PARKER IH 20 (0314-07-070)

Items: 167

County: PARKER
Length: 0.0000 MILES
Highway: IH 20
District: FORT WORTH
Control Number: 0314-07-070
DBE Goal: 0.0%
Project: STP 2026(892)MM
Guaranty: $100,000.00
Time: 425 WORKING DAYS
Engineer's Estimate: $18,156,436.74
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263205
Type: CONSTRUCT RAMPS
Project ID: A00062075
Contract Type: Federal
Project Description: CONSTRUCT NEW RAMPS AND AUXILIARY LANES AT BETHEL ROAD
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
PARKER IH 20 (0314-07-070)
Project Name: N/A
Project: STP 2026(892)MM
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: FM 1884
Limits To: SH 171
Project Description: CONSTRUCT NEW RAMPS AND AUXILIARY LANES AT BETHEL ROAD
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

167 Total 0 of 167
PARKER  |  IH 20  |  FORT WORTH  |  0314-07-070  |  1:00 PM AUGUST 06, 2026  |  $18,156,436.74  |  STP 2026(892)MM  |  CONSTRUCT RAMPS  |  425 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 61.200
REMOV CONC (PAV)
SY 3,973.000
REMOV CONC (MOWSTRIP)
SY 2,254.000
REMOV CONC (RIPRAP)
SY 2,745.000
REMOV CONC (CURB & GUTTER)
LF 1,251.000
REMOV CONC (FLUME)
SY 1,366.000
RMV (4") TRT/UNTRT BASE & ASPH PAV
SY 4,559.000
EXCAV (ROADWAY)
CY 7,727.000
EMBANK (FNL)(DC)(TY B)
CY 8,293.000
EMBANK (FNL)(DC)(TY D)
CY 7,727.000
BACKFILL (TY A OR B)
STA 98.200
COMPOST MANUF TOPSOIL (4")
SY 13,335.000
BLOCK SODDING
SY 13,335.000
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 15,426.000
HYDRO MULCH SEED (TEMP_WARM)
SY 9,659.000
HYDRO MULCH SEED (TEMP_COOL)
SY 9,659.000
VEGETATIVE WATERING
TGL 1,006.000
LIME (COM OR QK)(SLURRY)
TON 140.000
LIME TRT (EXIST MATL)(8")
SY 8,331.000
CEMENT
TON 116.000
CEMENT TRT (EXIST MATL)(8")
SY 8,331.000
SALV, HAUL & STKPL RCL APH PV (2"-6")
SY 3,973.000
PRIME COAT(MC-30 OR AE-P)
GAL 3,194.000
D-GR HMA TY-B PG64-22
TON 3,428.000
D-GR HMA TY-D SAC-A PG70-28
TON 427.200
TACK COAT
GAL 4,060.400
PLANE & TEXT ASPH CONC PAV(0" TO 3")
SY 3,706.000
CONC PVMT (CRCP) (13")
SY 14,589.000
CUT & RESTORE ASPH PAVING
SY 40.000
CEM STABIL BKFL
CY 115.600
TRENCH EXCAVATION PROTECTION
LF 854.000
TEMPORARY SPL SHORING
SF 30,444.000
SOIL NAIL ANCHORS
LF 17,153.000
DRILL SHAFT (36 IN)
LF 676.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 38.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 62.500
DRILL SHAFT (SIGN MTS) (42 IN)
LF 16.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 16.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 17.000
CL B CONC (FLUME)
CY 328.800
CL C CONC (ABUT)(HPC)(EXTEND)
CY 34.600
CL C CONC (CAP)(HPC)
CY 20.000
CL C CONC (COLUMN)(HPC)
CY 39.500
CL C CONC (COLLAR)
EA 2.000
REINF CONC SLAB (HPC)
SF 4,854.000
APPROACH SLAB (EXTEND) (HPC)
CY 22.000
RETAINING WALL (MSE)
SF 49,918.000
RETAINING WALL (SOIL NAIL) (FASCIA)
SF 10,397.000
PRESTR CONC GIRDER (TX28)
LF 653.900
OPAQUE SEALER FINISH
SF 1,490.000
RIPRAP (CONC) (CL B) (4 IN)
CY 165.500
RIPRAP (CONC)(FLUME)
CY 159.000
RIPRAP (MOW STRIP)(4 IN)
CY 195.900
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 2.400
RAIL (TY SSTR)
LF 5,828.000
RAIL (TY SSTR)(HPC)
LF 378.000
RETROFIT RAIL (TY SSTR)
LF 378.000
ARMOR JOINT
LF 58.800
SEALED EXPANSION JNT(4 IN)(SEJ-S (O))
LF 58.800
RC PIPE (CL III)(18 IN)
LF 521.000
RC PIPE (CL III)(24 IN)
LF 240.000
RC PIPE (CL III)(30 IN)
LF 8.000
RC PIPE (CL III)(42 IN)
LF 10.000
RC PIPE (CL IV)(42 IN)
LF 8.000
RC PIPE (CL V)(18 IN)
LF 203.000
INLET (COMPL)(AD)(3FT X 3FT)(FTW)
EA 5.000
INLET (COMPL)(RWF)(FTW)
EA 5.000
MANH (COMPL)(TY SD)(4'X 3'-3'X 3')(FTW)
EA 2.000
JUNCT BOX (COMPL)(JB)(5FT X 3FT)(FTW)
EA 1.000
HEADWALL (CH - FW - 0) (DIA= 18 IN)
EA 1.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000
REMOV STR (INLET)
EA 1.000
REMOV STR (SET)
EA 1.000
REMOV STR (PIPE)
LF 45.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000
TMA (STATIONARY)
DAY 805.000
TMA (MOBILE OPERATION)
DAY 64.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 270.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 70.000
ROCK FILTER DAMS (REMOVE)
LF 340.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 777.000
CONSTRUCTION EXITS (REMOVE)
SY 777.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,328.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,328.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 500.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000
CONSTRUCTING DETOURS
SY 4,218.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 6,150.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,960.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 5,160.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 2,940.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 60.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 6,150.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,960.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000
CONC CURB (MONO) (TY II)
LF 411.000
CONC CURB & GUTTER (TY II)
LF 10.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 6,671.000
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
LF 6,671.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,500.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000
REMOVE METAL BEAM GUARD FENCE
LF 2,866.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000
CABLE BARRIER SYSTEM (INSTALL)(TL-3)
LF 2,688.000
CABLE BARRIER TERM SEC (INSTL)(TL-3)
EA 2.000
CABLE BARRIER (REMOVE)
LF 2,620.000
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000
PIPE UNDERDRAINS (TY 6) (6")
LF 5,548.000
ALUMINUM SIGNS (TY A)
SF 9.000
ALUMINUM SIGNS (TY G)
SF 341.000
ALUMINUM SIGNS (TY O)
SF 1,080.250
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 170.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 3.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000
REMOVE SM RD SN SUP&AM
EA 9.000
INSTALL LRSS (STRUCT STEEL)
LB 1,594.500
REMOVE LRSA
EA 4.000
REMOVE LRSA (FOUNDATION ONLY)(24 IN)
EA 1.000
INS OH SN SUP(25 FT CANT)
EA 1.000
INS OH SN SUP(30 FT CANT)
EA 1.000
INS OH SN SUP(40 FT CANT)
EA 1.000
INS OH SN SUP(80 FT BRDG)
EA 1.000
REMOVE OVERHD SIGN SUP
EA 1.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 1.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 26.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 19.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 16.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
EA 4.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 3,334.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 15,730.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 2,244.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 15,130.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,443.000
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 639.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,907.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 6.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 8,995.000
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 1,974.000
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 10,267.000
PAVEMENT SLER 6"
LF 13,643.000
PAVEMENT SLER 8"
LF 2,427.000
PAVEMENT SLER 12"
LF 2,304.000
PAVEMENT SLER (NUMBER)
EA 3.000
REFL PAV MRKR TY II-C-R
EA 411.000
ELIM EXT PM & MRKS (6")
LF 53,814.000
ELIM EXT PM & MRKS (8")
LF 2,408.000
ELIM EXT PM & MRKS (12")
LF 663.000
ELIM EXT PM & MRKS (EXIT GORE)
EA 1.000
PAV SURF PREP FOR MRK (6")
LF 7,593.000
PAV SURF PREP FOR MRK (8")
LF 1,016.000
PAV SURF PREP FOR MRK (12")
LF 242.000
PAV SURF PREP FOR MRK (NUMBER)
EA 3.000
PAV SURF PREP FOR MRK (RPM)
EA 411.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $150,000.00
Total: $220,000.00