PALO PINTO VA (0902-39-038)

Items: 54

County: PALO PINTO
Length: N/A
Highway: VA
District: FORT WORTH
Control Number: 0902-39-038
DBE Goal: N/A
Project: C 902-39-38
Guaranty: N/A
Time: 212 WORKING DAYS
Engineer's Estimate: $2,779,914.71
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,779,914.71
$2,574,902.00
Over/Under Est: -7.37% -$205,012.71
$2,700,523.00
Over/Under Est: -2.86% -$79,391.71
Amt Left: 4.88% $125,621.00
Over/Under Est: 8.49% $235,979.59
Amt Left: 17.13% $440,992.30
Delta: -11.68% -$315,371.30
$3,050,938.90
Over/Under Est: 9.75% $271,024.19
Amt Left: 18.49% $476,036.90
Delta: -1.16% -$35,044.60
$3,184,504.33
Over/Under Est: 14.55% $404,589.62
Amt Left: 23.67% $609,602.33
Delta: -4.38% -$133,565.43

Bid Items & Bid Tabulations

54 Total 0 of 54
PALO PINTO  |  VA  |  FORT WORTH  |  0902-39-038  |  08/06/2020  |  $2,779,914.71  |  C 902-39-38  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  212 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NEW WORLD CONTRACTING, LLC
SJ&J CONSTRUCTION, LLC
HIGHWAY 19 CONSTRUCTION LLC
ENCINO LANDSCAPE, INC.
JAGOE-PUBLIC COMPANY
PREPARING ROW
STA 2.000 $820.000 $32,500.000 $1,000.000 $10,000.000 $5,000.000 $11,000.000
REMOVING CONC (DRIVEWAYS)
SY 3,436.000 $17.000 $19.000 $20.000 $25.000 $20.000 $25.000
REMOVING CONC (MISC)
SY 6.000 $105.000 $37.000 $40.000 $50.000 $20.000 $215.290
REMOVING CONC (CURB OR CURB & GUTTER)
LF 260.000 $13.600 $19.000 $15.000 $10.000 $20.000 $3.240
REMOVING CONC (SIDEWALK OR RAMP)
SY 324.000 $70.600 $22.000 $15.000 $25.000 $20.000 $11.700
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 1,319.000 $10.000 $10.000 $25.000 $15.000 $20.000 $10.310
COMPOST MANUF TOPSOIL (4")
SY 324.000 $0.810 $14.000 $4.000 $5.000 $1.000 $76.240
BLOCK SODDING
SY 10,506.000 $5.750 $7.000 $5.000 $5.000 $3.000 $5.790
VEGETATIVE WATERING
MG 85.000 $20.750 $118.000 $20.000 $100.000 $9.990 $125.000
CL A CONC (MISC)
CY 3.000 $690.000 $500.000 $600.000 $1,000.000 $500.000 $1,250.000
RIPRAP (CONC)(4 IN)
CY 67.000 $650.000 $499.000 $600.000 $500.000 $500.000 $500.000
RAIL (HANDRAIL)(TY A)
LF 311.000 $130.000 $262.000 $150.000 $110.000 $250.000 $90.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 8.000 $17,000.000 $21,200.000 $1,200.000 $5,000.000 $14,999.000 $3,250.000
ADJUSTING MANHOLES
EA 8.000 $345.000 $3,116.000 $250.000 $1,000.000 $1,250.000 $1,446.180
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 3.000 $1,470.000 $997.000 $200.000 $200.000 $750.000 $1,064.510
MOBILIZATION
LS 1.000 $252,719.520 $250,000.000 $300,000.000 $270,000.000 $250,000.000 $310,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,550.000 $2,320.000 $8,000.000 $5,000.000 $7,999.000 $5,000.000
SANDBAGS FOR EROSION CONTROL
EA 600.000 $7.180 $8.000 $3.000 $1.000 $5.000 $6.840
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,000.000 $4.660 $5.000 $5.000 $1.000 $4.000 $7.370
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,000.000 $1.150 $2.000 $1.000 $1.000 $0.750 $1.320
CONC CURB (TY II)
LF 1,049.000 $25.000 $15.000 $20.000 $35.000 $20.000 $40.260
CONC CURB & GUTTER (TY II)
LF 3,471.000 $30.000 $38.000 $25.000 $35.000 $30.000 $45.000
CONC CURB (TY F1)
LF 141.000 $140.000 $18.000 $18.000 $180.000 $200.000 $155.000
CONC CURB (DOWEL) (TY II)
LF 395.000 $37.000 $25.000 $20.000 $45.000 $30.000 $40.000
DRIVEWAYS (CONC)
SY 5,012.000 $90.000 $80.000 $115.000 $100.000 $90.000 $125.000
CONC SIDEWALKS (4")
SY 9,166.000 $70.000 $70.000 $60.000 $75.000 $90.000 $75.000
CONC SIDEWALKS (6")
SY 51.000 $88.000 $80.000 $75.000 $80.000 $90.000 $80.000
CURB RAMPS (TY 1)
SY 1,401.000 $150.000 $80.000 $135.000 $180.000 $200.000 $170.000
CURB RAMPS (TY 2)
SY 126.000 $150.000 $80.000 $140.000 $180.000 $200.000 $171.000
CURB RAMPS (TY 3)
SY 618.000 $150.000 $80.000 $140.000 $180.000 $200.000 $173.000
CURB RAMPS (TY 6)
SY 167.000 $150.000 $80.000 $150.000 $180.000 $200.000 $175.000
CURB RAMPS (TY 7)
SY 840.000 $150.000 $80.000 $176.000 $180.000 $200.000 $220.000
CURB RAMPS (TY 10)
SY 39.000 $150.000 $80.000 $200.000 $180.000 $200.000 $210.000
CURB RAMPS (TY 21)
SY 44.000 $150.000 $80.000 $175.000 $180.000 $200.000 $235.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 3.000 $260.000 $359.000 $400.000 $500.000 $400.000 $247.400
CONDT (PVC) (SCH 40) (2") (BORE)
LF 450.000 $24.000 $32.000 $40.000 $50.000 $30.000 $52.640
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 113.000 $570.000 $580.000 $300.000 $500.000 $500.000 $325.040
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,517.000 $3.900 $3.000 $15.000 $4.000 $5.000 $3.680
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 691.000 $6.780 $6.000 $25.000 $6.000 $7.000 $6.320
PAVEMENT SEALER 12"
LF 2,517.000 $2.090 $1.000 $4.000 $1.000 $2.000 $1.050
PAVEMENT SEALER 24"
LF 691.000 $2.970 $1.000 $5.000 $2.000 $3.000 $2.110
ELIM EXT PAV MRK & MRKS (12")
LF 2,545.000 $0.980 $1.000 $6.000 $1.500 $2.000 $1.260
ELIM EXT PAV MRK & MRKS (24")
LF 701.000 $2.240 $2.000 $4.000 $2.200 $3.000 $2.320
PAV SURF PREP FOR MRK (12")
LF 2,517.000 $0.820 $1.000 $4.000 $0.200 $0.750 $0.210
PAV SURF PREP FOR MRK (24")
LF 691.000 $1.140 $1.000 $4.000 $0.200 $1.000 $0.210
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 500.000 $1.350 $4.000 $4.000 $20.000 $2.000 $5.260
PED POLE ASSEMBLY
EA 32.000 $2,978.000 $2,929.000 $2,500.000 $7,000.000 $1,800.000 $5,500.000
RELOCATE PED PUSH BUTTON POST ASSEM
EA 2.000 $945.000 $1,228.000 $1,000.000 $500.000 $999.000 $2,368.750
PED DETECT PUSH BUTTON (STANDARD)
EA 40.000 $919.000 $800.000 $1,000.000 $850.000 $699.000 $710.620
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 13.000 $163.000 $156.000 $250.000 $350.000 $99.000 $131.600
REMOVAL OF CONCRETE FOUNDATIONS
EA 4.000 $850.000 $2,500.000 $600.000 $1,000.000 $500.000 $1,263.330
REPLACE DOWN GUY AND ANCHOR W/GUARD
EA 6.000 $1,200.000 $561.000 $1,400.000 $1,500.000 $2,500.000 $289.510
RETROFIT DET WARN SURF(SURF APP OR CIP)
EA 6.000 $1,390.000 $500.000 $1,500.000 $350.000 $500.000 $915.920
GROUND BOX W/ APRON (ADJUST)
EA 1.000 $471.000 $935.000 $2,000.000 $1,000.000 $1,000.000 $1,263.330
Totals: $2,779,914.710 $2,574,902.000 $2,700,523.000 $3,015,894.300 $3,050,938.900 $3,184,504.330