Show Job Controls
Bid Cobra

OLDHAM IH 40 (0090-02-053)

Items: 55

County: OLDHAM
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0090-02-053
DBE Goal: N/A
Project: STP 2020(777)HES
Guaranty: N/A
Time: 233 WORKING DAYS
Engineer's Estimate: $4,469,165.00
Date: 04/08/2020 (6 years ago)
Contract Number: N/A
Type: IMPROVE GUARDRAIL TO DESIGN STANDARDS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$4,469,165.00
$3,945,747.00
Over/Under Est: -11.71% -$523,418.00
$4,241,650.36
Over/Under Est: -5.09% -$227,514.64
Amt Left: 7.5% $295,903.36

Bid Items & Bid Tabulations

55 Total 0 of 55
OLDHAM  |  IH 40  |  AMARILLO  |  0090-02-053  |  04/08/2020  |  $4,469,165.00  |  STP 2020(777)HES  |  IMPROVE GUARDRAIL TO DESIGN STANDARD...  |  233 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HJC FARMS, INC.
3LW CIVIL LLC
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 27.000 $1,400.000 $1,100.000 $1,346.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 1.000 $1,700.000 $1,700.000 $1,954.000
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 1.000 $3,000.000 $4,000.000 $3,560.000
REMOVING CONC (RIPRAP)
SY 40.000 $25.000 $8.500 $58.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 778.000 $50.000 $20.000 $35.000
BROADCAST SEED (TEMP) (COOL)
SY 842.000 $5.000 $2.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 842.000 $10.000 $3.000 $3.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 152.000 $300.000 $195.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 4.000 $415.000 $782.000 $2,000.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 171.000 $80.000 $45.000 $90.000
RETROFIT RAIL (TY SSTR)
LF 1,442.000 $245.000 $178.500 $200.000
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
LF 20.000 $1,000.000 $1,100.000 $950.000
WINGWALL (SW - 0) (HW=8 FT)
EA 2.000 $19,000.000 $15,000.000 $20,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $3,000.000 $1,850.000 $1,600.000
REMOV STR (HEADWALL)
EA 6.000 $1,100.000 $1,125.000 $2,500.000
REMOV STR (BOX CULVERT)
LF 4.000 $100.000 $126.500 $800.000
MOBILIZATION
LS 1.000 $380,000.000 $310,000.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $15,000.000 $2,500.000 $28,142.850
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 150.000 $5.000 $5.000 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $2.000 $1.000 $1.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 1,140.000 $10.000 $15.000 $25.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 1,140.000 $16.000 $20.000 $25.000
PORT CTB (STKPL)(SAFETY SH)
LF 1,140.000 $14.000 $20.000 $25.000
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 40.000 $180.000 $207.000 $165.000
PERM CTB (SGL SLOPE) (TY 3) (54 )
LF 180.000 $250.000 $310.000 $350.000
MTL W-BEAM GD FEN (STEEL POST)
LF 33,775.000 $26.000 $24.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 24.000 $2,100.000 $2,050.000 $1,900.000
MTL BEAM GD FEN TRANS (T101)
EA 16.000 $1,400.000 $1,500.000 $1,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 47.000 $1,200.000 $1,500.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 9.000 $800.000 $1,500.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 26,125.000 $4.000 $2.500 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 61.000 $250.000 $250.000 $150.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $300.000 $250.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 18.000 $300.000 $250.000 $275.000
RM MTL BM GD FEN TRANS (T101)
EA 13.000 $350.000 $250.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 82.000 $3,000.000 $3,000.000 $3,841.580
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 6.000 $1,300.000 $2,500.000 $750.000
GUARDRAIL END TREATMENT (REMOVE)
EA 53.000 $350.000 $300.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,685.000 $2,500.000 $2,100.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,949.000 $1,000.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 18.000 $27,000.000 $35,000.000 $29,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $9,943.000 $9,000.000 $10,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 21.000 $25.000 $17.000 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 37.000 $17.000 $17.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 334.000 $30.000 $35.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 89.000 $30.000 $35.000 $20.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 7,500.000 $1.000 $1.500 $1.380
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,500.000 $1.000 $1.500 $1.380
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 30,430.000 $0.600 $1.000 $0.820
ELIM EXT PAV MRK & MRKS (4")
LF 31,310.000 $1.000 $0.750 $0.540
ELIM EXT PAV MRK & MRKS (8")
LF 114,110.000 $1.500 $1.500 $0.540
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $2,000.000 $15,000.000
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 114,110.000 $7.000 $6.000 $6.000
TMA (STATIONARY)
DAY 340.000 $300.000 $150.000 $100.000
TMA (MOBILE OPERATION)
HR 320.000 $80.000 $100.000 $50.000
Totals: $4,469,165.000 $3,945,747.000 $4,241,650.360