Show Job Controls
Bid Cobra

NUECES SH 286 (0326-01-069)

Items: 60

County: NUECES
Length: N/A
Highway: SH 286
District: CORPUS CHRISTI
Control Number: 0326-01-069
DBE Goal: 0.0%
Project: F 2024(735)
Guaranty: N/A
Time: 94 WORKING DAYS
Engineer's Estimate: $5,393,935.85
Date: 02/01/2024 (2 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
ERNEST LONGORIA
FIDENCIO LOPEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$5,393,935.85
$6,335,414.60
Over/Under Est: 17.45% $941,478.75
Subcontractor Percentage Amount
DEPENDABLE FENCE 6.43% $395,539.19
HIGHWAY BARRICADES AND SERVICES, LLC 3.24% $199,307.46
K. L. DURHAM CONSTRUCTION, L.L.C. 3.01% $185,159.09
JB PINNACLE GROUP, LLC 0.19% $11,687.78
EPIC ENERGY SERVICES LLC 0.10% $6,151.46
Total: 12.97% $797,844.98

Bid Items & Bid Tabulations

60 Total 0 of 60
NUECES  |  SH 286  |  CORPUS CHRISTI  |  0326-01-069  |  02/01/2024  |  $5,393,935.85  |  F 2024(735)  |  RESURF ROADWAY  |  94 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
REMOVING CONC (FOUNDATIONS)
CY 11.000 $300.000 $456.000
REMOVE CONC (RAIL)
LF 100.000 $50.000 $94.000
ASPH (MULTI OPTION)
GAL 36,582.000 $3.600 $3.500
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 949.000 $120.000 $215.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 9,074.000 $63.000 $60.000
PLANE ASPH CONC PAV (3")
SY 104,515.000 $3.150 $1.960
CL C CONC (RAIL FOUNDATION)
CY 14.000 $750.000 $1,590.000
CLEANING AND SEALING EXISTING JOINTS
LF 2,652.000 $60.000 $56.000
RAIL (TY SSTR)
LF 88.000 $105.000 $436.000
MOBILIZATION
LS 1.000 $61,339.420 $112,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $11,000.000 $30,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 365.000 $6.000 $6.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 365.000 $2.000 $1.400
PTB (MOVE)(STEEL)
LF 40.000 $23.000 $161.000
PTB (STKPL)(STEEL)
LF 120.000 $25.000 $67.000
PTB (DES SOURCE)(STEEL)
LF 120.000 $23.000 $73.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,400.000 $1,390.000
CRASH CUSH ATTEN (REMOVE)
EA 15.000 $1,400.000 $555.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 12.000 $27,000.000 $30,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 2.000 $46,000.000 $44,700.000
CRASH CUSH ATTEN (INSTL) (S) (TL3)
EA 1.000 $5,500.000 $8,320.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 1,124.000 $10.000 $19.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 666.000 $15.000 $20.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,746.000 $1.500 $3.300
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 243.000 $1.300 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 15,155.000 $1.150 $0.850
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,739.000 $4.300 $1.350
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,600.000 $8.500 $10.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 2,141.000 $0.250 $0.350
REFL PAV MRK TY II (W) 6" (SLD)
LF 10,891.000 $0.210 $0.350
REFL PAV MRK TY II (W) 8" (SLD)
LF 6,254.000 $0.450 $0.500
REFL PAV MRK TY II (W) 12" (SLD)
LF 552.000 $4.000 $0.700
REFL PAV MRK TY II (Y) 6" (SLD)
LF 10,581.000 $0.200 $0.350
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,458.000 $0.800 $0.650
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 28,113.000 $0.780 $0.650
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 27,892.000 $0.790 $0.650
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 1,779.000 $3.000 $2.200
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 2,141.000 $15.250 $12.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 2,927.000 $7.500 $4.450
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $250.000 $167.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $325.000 $361.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 6.000 $550.000 $499.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 1.000 $225.000 $111.000
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $300.000 $277.000
REFL PAV MRKR TY II-C-R
EA 1,056.000 $5.000 $5.550
ELIM EXT PAV MRK & MRKS (6")
LF 23,613.000 $1.000 $0.550
ELIM EXT PAV MRK & MRKS (8")
LF 6,254.000 $1.000 $0.650
ELIM EXT PAV MRK & MRKS (12")
LF 584.000 $1.000 $0.950
PAV SURF PREP FOR MRK (6")
LF 23,613.000 $0.300 $0.050
PAV SURF PREP FOR MRK (8")
LF 6,254.000 $0.500 $0.050
PAV SURF PREP FOR MRK (12")
LF 584.000 $1.000 $0.100
DRAIN INLET CLEANING
EA 4.000 $650.000 $1,150.000
CONCRETE RAIL REPAIR (MISC)
LF 7.000 $175.000 $1,200.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 480.000 $52.000 $56.000
D-GR HMA TY-B SAC-B PG70-22
TON 14,371.000 $150.000 $180.000
TBWC (MEMBRANE)
GAL 22,718.000 $3.800 $4.850
TBWC PG76-22 SAC-A TY C
TON 5,679.000 $164.000 $212.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 110.000 $50.000 $79.000
TMA (STATIONARY)
DAY 206.000 $125.000 $398.000
REMOVE & REPLACE DELINEATOR/OBJ. MARKER
EA 73.000 $22.000 $64.000
Totals: $5,393,935.850 $6,335,414.600