MOORE FM 281 (1727-02-024)

Items: 84

County: MOORE
Length: N/A
Highway: FM 281
District: AMARILLO
Control Number: 1727-02-024
DBE Goal: 0.0%
Project: C 1727-2-24
Guaranty: N/A
Time: 299 WORKING DAYS
Engineer's Estimate: $39,780,977.59
Date: 02/02/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
ZACHARY MAYER
BRANDON BILBREY
KENNETH PETR
DARRELL CALDWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$39,780,977.59
$41,097,397.10
Over/Under Est: 3.31% $1,316,419.51
Over/Under Est: 33.66% $13,391,017.89
Amt Left: 29.38% $12,074,598.38
$53,788,762.80
Over/Under Est: 35.21% $14,007,785.21
Amt Left: 30.88% $12,691,365.70
Delta: -1.16% -$616,767.32
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 0.80% $327,565.00
HJC FARMS, INC. 0.44% $180,160.75
BARRICADES UNLIMITED 0.13% $53,229.31
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.11% $45,040.19
SURFACE PREPARATION TECHNOLOGIES, LLC 0.07% $28,661.94
Total: 1.55% $634,657.19

Bid Items & Bid Tabulations

84 Total 0 of 84
MOORE  |  FM 281  |  AMARILLO  |  1727-02-024  |  02/02/2024  |  $39,780,977.59  |  C 1727-2-24  |  REHAB EXIST ROADWAY  |  299 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
RK HALL, LLC
REMOVING CONC (DRIVEWAYS)
SY 678.000 $23.000 $35.000 $100.000 $136.020
REMOVING STAB BASE AND ASPH PAV (10")
SY 141,451.000 $5.000 $9.200 $9.310 $5.710
EXCAVATION (ROADWAY)
CY 86,677.000 $14.000 $16.500 $21.220 $23.410
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 31,837.000 $19.000 $20.500 $16.470 $32.990
BACKFILL (TY B)
STA 69.000 $300.000 $183.000 $250.000 $1,463.560
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 297,176.000 $0.290 $0.200 $0.210 $0.190
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 250,360.000 $20.000 $15.500 $17.030 $12.510
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 2,957.000 $300.000 $415.000 $521.820 $520.130
LIME TRT (EXST MATL)(8")
SY 250,360.000 $4.150 $4.950 $5.590 $3.910
PRIME COAT (MC-30)
GAL 61,294.000 $4.800 $5.650 $6.360 $6.580
EMULS ASPH (EROSN CONT)(MULTI)
GAL 28,963.000 $4.090 $5.350 $5.600 $4.320
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 2,500.000 $10.000 $51.350 $45.000 $38.220
PLANE ASPH CONC PAV(0" TO 2")
SY 2,430.000 $4.560 $10.750 $12.370 $8.270
CEM STABIL BKFL
CY 211.000 $240.000 $413.000 $357.290 $356.950
CUT & RESTORING PAV
SY 2,589.000 $159.000 $93.450 $145.000 $71.390
TRENCH EXCAVATION PROTECTION
LF 207.000 $5.000 $25.000 $19.490 $19.470
RIPRAP (CONC)(4 IN)
CY 6.000 $800.000 $1,315.000 $974.430 $973.500
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $800.000 $1,060.000 $1,299.240 $1,005.950
CMP (GAL STL 48 IN)
LF 72.000 $600.000 $220.000 $324.810 $324.500
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 93.000 $1,100.000 $1,155.000 $1,624.040 $1,622.500
RC PIPE (CL III)(24 IN)
LF 2,475.000 $145.000 $123.500 $168.900 $168.740
RC PIPE (CL III)(48 IN)
LF 240.000 $300.000 $320.000 $487.210 $486.750
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $16,000.000 $36,150.000 $37,677.830 $37,642.000
SET (TY I) (48 IN) (4: 1) (C)
EA 3.000 $9,180.000 $22,550.000 $12,992.360 $12,980.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 6.000 $14,300.000 $19,765.000 $16,890.060 $16,874.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $3,600.000 $3,920.000 $2,598.470 $2,596.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 88.000 $2,080.000 $3,675.000 $2,923.280 $2,920.500
CLEAN EXIST CULVERTS
EA 4.000 $2,200.000 $4,225.000 $6,496.180 $4,543.000
REMOV STR (SET)
EA 24.000 $2,150.000 $910.000 $649.620 $649.000
REMOV STR (PIPE)
LF 1,022.000 $60.000 $68.000 $15.590 $15.580
REMOV STR (BOX CULVERT)
LF 78.000 $162.000 $115.000 $129.920 $129.800
MOBILIZATION
LS 1.000 $3,038,000.000 $4,100,000.000 $6,633,626.830 $4,884,061.400
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $30,000.000 $36,100.000 $106,863.280 $41,662.380
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 279.000 $30.000 $58.000 $310.570 $282.070
CONSTRUCTION EXITS (REMOVE)
SY 279.000 $14.650 $20.000 $18.310 $16.570
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,545.000 $3.950 $8.500 $12.240 $11.120
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,545.000 $2.760 $3.000 $1.750 $1.590
CONSTRUCTING DETOURS
SY 96,312.000 $72.000 $86.150 $110.000 $92.550
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 24.000 $50.000 $195.000 $600.000 $198.580
DRIVEWAYS (CONC)
SY 726.000 $125.000 $195.000 $368.830 $208.340
DRIVEWAYS (ACP)
SY 4,050.000 $63.000 $46.500 $125.000 $88.490
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 96,380.000 $0.200 $0.250 $0.210 $0.060
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 48,300.000 $0.210 $0.250 $0.210 $0.060
MTL W-BEAM GD FEN (STEEL POST)
LF 1,050.000 $33.290 $35.000 $42.550 $38.650
REMOVE METAL BEAM GUARD FENCE
LF 775.000 $3.220 $3.200 $3.900 $3.540
MTL BM GD FEN (REMOVE & REINSTALL)
LF 275.000 $46.000 $18.000 $22.090 $20.060
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,660.000 $3,540.000 $4,352.440 $3,953.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $500.000 $2,115.000 $2,598.470 $2,360.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $322.000 $317.000 $389.770 $354.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $300.000 $425.000 $389.770 $472.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $712.000 $845.000 $909.460 $944.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $775.000 $950.000 $1,169.310 $1,062.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 10.000 $8,785.000 $1,200.000 $1,429.160 $1,268.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $990.000 $1,135.000 $1,429.160 $1,268.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 4.000 $1,000.000 $1,190.000 $1,429.160 $1,327.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,000.000 $1,295.000 $1,948.850 $1,445.500
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $917.000 $1,460.000 $1,948.850 $1,628.400
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,430.000 $1,785.000 $1,948.850 $1,994.200
REMOVE SM RD SN SUP&AM
EA 43.000 $405.000 $115.000 $103.940 $129.800
REMOVE DELIN & OBJECT MARKER ASSMS
EA 46.000 $5.000 $16.000 $24.000 $17.700
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND(BI)
EA 22.000 $70.000 $160.000 $129.920 $177.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 12.000 $132.000 $160.000 $129.920 $177.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 296,190.000 $0.340 $0.260 $0.320 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 300,090.000 $0.340 $0.260 $0.320 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 416.000 $1.740 $1.700 $2.600 $3.460
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,834.000 $1.740 $1.750 $2.600 $3.460
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 255.000 $4.250 $1.050 $1.300 $1.180
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 430.000 $3.200 $1.400 $1.690 $1.530
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 170.000 $1.070 $0.800 $0.970 $0.890
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 106,834.000 $1.120 $0.700 $0.820 $0.740
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 12,430.000 $1.000 $0.700 $0.870 $0.790
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 20,580.000 $1.200 $0.700 $0.840 $0.770
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 629.000 $16.000 $12.700 $15.590 $14.160
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $250.000 $238.000 $292.330 $265.500
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $300.000 $345.000 $422.250 $383.500
PREFAB PAV MRK TY C (W) (RR XING)
EA 5.000 $690.000 $685.000 $844.500 $767.000
REFL PAV MRKR TY I-C
EA 32.000 $4.000 $10.600 $12.990 $11.800
REFL PAV MRKR TY II-A-A
EA 1,067.000 $4.000 $5.300 $6.500 $5.900
ELIM EXT PAV MRK & MRKS (4")
LF 129,687.000 $0.450 $0.600 $0.710 $0.650
SP MIXES SP-D SAC-A PG70-28
TON 54,239.000 $141.000 $146.000 $160.000 $174.520
TACK COAT
GAL 33,611.000 $5.500 $7.650 $7.830 $7.820
EMULSIFIED ASPHALT BASE (PT MX) 6"
SY 245,084.000 $36.000 $28.300 $41.440 $66.880
TMA (STATIONARY)
DAY 10.000 $430.000 $525.000 $1,000.000 $515.990
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $100.000 $250.000 $117.540
Totals: $39,780,977.590 $41,097,397.100 $53,171,995.480 $53,788,762.800