MONTGOMERY IH 45 (0675-08-120)

Items: 115

County: MONTGOMERY
Length: N/A
Highway: IH 45
District: HOUSTON
Control Number: 0675-08-120
DBE Goal: 0.0%
Project: CC 675-8-120
Guaranty: N/A
Time: 151 WORKING DAYS
Engineer's Estimate: $2,917,359.90
Date: 02/02/2024 (2 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$2,917,359.90
$3,167,865.70
Over/Under Est: 8.59% $250,505.80
$3,173,297.80
Over/Under Est: 8.77% $255,937.90
Amt Left: 0.17% $5,432.10
$3,275,000.00
Over/Under Est: 12.26% $357,640.10
Amt Left: 3.38% $107,134.30
Delta: -3.20% -$101,702.20
Over/Under Est: 17.99% $524,748.51
Amt Left: 8.66% $274,242.71
Delta: -5.10% -$167,108.41
$3,587,689.80
Over/Under Est: 22.98% $670,329.90
Amt Left: 13.25% $419,824.10
Delta: -4.23% -$145,581.39
Over/Under Est: 23.16% $675,588.52
Amt Left: 13.42% $425,082.72
Delta: -0.15% -$5,258.62
Over/Under Est: 29.19% $851,594.05
Amt Left: 18.97% $601,088.25
Delta: -4.90% -$176,005.53
Over/Under Est: 32.87% $958,979.75
Amt Left: 22.36% $708,473.95
Delta: -2.85% -$107,385.70
Over/Under Est: 47.6% $1,388,670.18
Amt Left: 35.93% $1,138,164.38
Delta: -11.08% -$429,690.43
Subcontractor Percentage Amount
DECO CONTRACTORS, INC. 9.88% $335,432.45
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC 6.24% $211,852.07
WILLOW CITY SIGN & RAIL, INC. 3.44% $116,790.24
BORTUNCO 2.79% $94,722.32
QUALITY TURF FARMS, L.C. 2.65% $89,969.23
STRUCTURAL INTEGRITY GROUP LLC 1.34% $45,493.87
B & D MAINTENANCE LLC 1.28% $43,456.84
HIGHWAY 1 LLC 1.28% $43,456.84
BATTEN DRILLING, INC. 1.24% $42,098.81
CEN TEX HYDROSEED, INC. 0.95% $32,253.12
TEXAS MATERIALS GROUP, INC. 0.60% $20,370.39
PRIMATE CONSTRUCTION, LP 0.56% $19,012.37
SHAW DRILLING, LLC 0.41% $13,919.77
TEXAS CURB CUT 0.40% $13,580.26
TEXOP CONSTRUCTION 0.26% $8,827.17
SUPERIOR TRAFFIC CONTROL, LLC 0.18% $6,111.12
CURB PLANET INC. 0.05% $1,697.53
SCOTT DERR PAINTING CO, LLC 0.03% $1,018.52
Total: 33.58% $1,140,062.92

Bid Items & Bid Tabulations

115 Total 0 of 115
MONTGOMERY  |  IH 45  |  HOUSTON  |  0675-08-120  |  02/02/2024  |  $2,917,359.90  |  CC 675-8-120  |  HWY IMPRV  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
MBN ENTERPRISES LLC
ICON GC, LLC
LARRY YOUNG PAVING, INC.
MC2 CIVIL, LLC
TEXAS MATERIALS GROUP, INC.
BRICE CONSTRUCTION AND DESIGN LLC
STERLING DELAWARE HOLDING COMPANY
HARPER BROTHERS CONSTRUCTION LLC
PREPARING ROW
STA 29.740 $1,500.000 $6,605.570 $2,000.000 $3,500.000 $974.510 $6,000.000 $600.000 $7,000.000 $6,736.000 $6,000.000
REMOVING CONC (PAV)
SY 4,082.000 $9.000 $7.440 $8.500 $15.000 $17.230 $14.000 $9.000 $22.210 $8.710 $10.000
REMOVING CONC (CURB)
LF 1,189.000 $8.000 $4.950 $5.500 $18.000 $9.200 $1.000 $7.000 $3.240 $2.000 $2.000
REMOVE CONC (RAIL)
LF 131.000 $20.000 $12.000 $35.000 $80.000 $109.210 $20.000 $31.000 $32.750 $73.000 $50.000
REMOVING CONCRETE(MOW STRIP)
LF 146.000 $12.000 $10.000 $15.000 $8.000 $11.900 $15.000 $13.000 $27.770 $10.000 $10.000
REMOVING STAB BASE AND ASPH PAV (7")
SY 4,124.000 $9.000 $3.450 $9.000 $4.500 $13.020 $7.000 $7.000 $9.770 $6.030 $5.000
EXCAVATION (ROADWAY)
CY 2,511.000 $15.000 $18.410 $7.000 $20.000 $31.690 $10.000 $33.000 $20.130 $13.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 335.000 $15.000 $12.160 $20.000 $34.000 $17.300 $60.000 $84.000 $98.230 $320.000 $15.000
BLOCK SODDING
SY 17,972.000 $4.500 $4.220 $8.000 $6.800 $5.970 $5.000 $6.500 $4.750 $4.750 $4.220
STRAW OR HAY MULCH
SY 3,773.000 $0.350 $0.950 $4.000 $0.400 $0.310 $0.300 $1.000 $0.250 $0.250 $0.950
BROADCAST SEED (TEMP) (WARM)
SY 179.000 $0.350 $0.320 $10.000 $0.250 $0.310 $0.300 $1.000 $0.250 $0.250 $0.320
DRILL SEED (TEMP)(WARM OR COOL)
SY 3,594.000 $0.350 $0.370 $3.000 $0.250 $0.380 $0.400 $0.350 $0.300 $0.300 $0.370
FERTILIZER
AC 4.500 $750.000 $1,703.780 $2,000.000 $1,300.000 $1,507.290 $1,000.000 $1,200.000 $800.000 $800.000 $1,703.780
VEGETATIVE WATERING
MG 539.100 $150.000 $22.290 $30.000 $0.010 $54.120 $20.000 $15.000 $40.310 $32.000 $35.000
LIME TRT (EXST MATL) (6")
SY 3,371.000 $5.000 $8.440 $7.000 $16.000 $12.050 $8.000 $17.000 $6.600 $20.000 $15.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 46.000 $325.000 $381.640 $350.000 $380.000 $409.480 $350.000 $370.000 $459.670 $347.000 $326.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 3,371.000 $15.000 $28.360 $38.000 $38.000 $29.650 $30.000 $30.000 $35.540 $35.000 $35.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 185.000 $120.000 $438.500 $210.000 $220.000 $167.550 $180.000 $400.000 $293.000 $175.000 $211.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 3,461.000 $85.000 $110.960 $110.000 $89.000 $117.200 $98.000 $124.000 $109.010 $154.000 $120.000
CEM STABIL BKFL
CY 751.000 $55.000 $51.100 $70.000 $0.010 $71.380 $55.000 $72.000 $71.820 $68.000 $50.000
CUT & RESTORING PAV
SY 112.000 $100.000 $133.250 $200.000 $120.000 $180.000 $150.000 $100.000 $161.290 $105.000 $10.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 85.000 $55.000 $51.690 $75.000 $0.010 $71.370 $55.000 $80.000 $71.820 $68.000 $50.000
TRENCH EXCAVATION PROTECTION
LF 1,759.000 $5.000 $9.660 $10.000 $0.010 $0.870 $1.000 $3.500 $1.400 $1.000 $5.000
TEMPORARY SPL SHORING
SF 538.000 $5.000 $0.610 $50.000 $1.000 $46.960 $10.000 $78.000 $34.880 $5.000 $1.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 7.000 $110.000 $175.000 $175.000 $200.000 $219.810 $125.000 $28.000 $115.000 $115.000 $115.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 15.000 $210.000 $219.000 $199.000 $250.000 $275.080 $230.000 $100.000 $219.000 $210.000 $210.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 196.000 $450.000 $340.640 $500.000 $350.000 $459.840 $450.000 $650.000 $390.000 $438.970 $850.250
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 60.000 $200.000 $190.000 $400.000 $210.000 $238.650 $175.000 $180.000 $190.000 $155.290 $190.000
CL C CONC (RAIL FOUNDATION)
CY 33.000 $800.000 $679.220 $450.000 $600.000 $682.130 $700.000 $700.000 $813.100 $985.000 $950.000
CL C CONC (SIGN COLUMN)
CY 50.000 $1,500.000 $2,439.760 $750.000 $3,000.000 $2,000.000 $3,000.000 $2,450.000 $3,239.180 $3,200.000 $2,000.000
CL C CONC (SIGN FOOTING)
CY 20.000 $1,200.000 $1,104.710 $450.000 $1,150.000 $1,000.000 $1,900.000 $1,300.000 $1,613.430 $2,200.000 $1,400.000
RIPRAP (CONC)(4 IN)
CY 29.000 $600.000 $475.770 $550.000 $460.000 $620.120 $500.000 $740.000 $1,044.460 $710.000 $600.000
RIPRAP (CONC)(5 IN)
CY 2.000 $540.000 $1,193.950 $550.000 $800.000 $826.830 $2,500.000 $1,100.000 $2,745.340 $910.000 $1,400.000
RIPRAP (MOW STRIP)(4 IN)
CY 11.000 $600.000 $945.760 $600.000 $550.000 $689.020 $1,000.000 $880.000 $1,060.560 $1,100.000 $850.000
RAIL (TY SSTR)
LF 231.000 $60.000 $112.550 $110.000 $135.000 $165.370 $140.000 $136.000 $122.870 $200.000 $130.000
RC PIPE (CL III)(24 IN)
LF 1,492.000 $100.000 $93.520 $120.000 $132.000 $92.760 $125.000 $98.000 $106.670 $110.000 $175.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $5,500.000 $7,263.210 $5,500.000 $3,500.000 $4,675.390 $7,800.000 $5,500.000 $5,604.040 $5,700.000 $6,000.000
INLET (COMPL)(TY AAD)
EA 7.000 $9,500.000 $11,898.450 $5,000.000 $8,100.000 $9,327.280 $12,500.000 $10,000.000 $12,467.280 $12,000.000 $8,000.000
MANH (COMPL)(TY A)
EA 2.000 $8,700.000 $8,901.570 $5,500.000 $9,200.000 $9,502.500 $9,900.000 $7,200.000 $9,780.940 $7,600.000 $10,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $2,104.790 $5,500.000 $1,700.000 $1,464.120 $2,000.000 $2,100.000 $5,643.980 $2,100.000 $4,000.000
JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV)
LF 77.000 $700.000 $1,578.720 $194.000 $275.000 $907.800 $450.000 $1,000.000 $1,593.230 $1,510.000 $2,000.000
ADJUSTING INLET (CAP)
EA 1.000 $1,100.000 $3,788.670 $300.000 $800.000 $1,250.000 $1,500.000 $2,900.000 $2,771.440 $1,500.000 $2,000.000
REMOV STR (INLET)
EA 2.000 $900.000 $740.870 $2,500.000 $1,000.000 $750.000 $1,000.000 $650.000 $2,100.670 $805.000 $500.000
MOBILIZATION
LS 1.000 $265,000.000 $201,766.240 $300,000.000 $296,394.140 $322,000.000 $300,000.000 $340,000.000 $375,000.000 $380,000.000 $310,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $7,000.000 $4,553.540 $1,500.000 $2,250.000 $2,684.860 $20,000.000 $9,200.000 $5,415.410 $15,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 395.000 $40.000 $46.310 $35.000 $145.000 $50.240 $42.000 $38.000 $40.000 $40.000 $46.310
ROCK FILTER DAMS (REMOVE)
LF 395.000 $15.000 $20.160 $10.000 $40.000 $25.120 $21.000 $10.000 $20.000 $20.000 $20.160
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 223.000 $35.000 $39.650 $40.000 $38.000 $50.240 $42.000 $35.000 $40.000 $40.000 $39.650
CONSTRUCTION EXITS (REMOVE)
SY 223.000 $10.000 $10.580 $10.000 $10.000 $25.120 $21.000 $15.000 $20.000 $20.000 $10.580
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 100.000 $5.000 $4.840 $12.000 $5.500 $6.590 $6.000 $5.000 $5.250 $5.250 $4.840
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 204.000 $7.000 $6.170 $16.000 $6.000 $9.420 $8.000 $6.000 $7.500 $7.500 $6.170
BIODEG EROSN CONT LOGS (REMOVE)
LF 304.000 $2.000 $1.050 $5.000 $1.650 $3.140 $3.000 $1.000 $2.500 $2.500 $1.050
CONSTRUCTING DETOURS
SY 1,088.000 $105.000 $213.500 $80.000 $100.000 $128.580 $154.000 $180.000 $135.480 $217.000 $175.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,120.000 $50.000 $33.610 $50.000 $73.000 $80.430 $50.000 $60.000 $69.450 $40.000 $50.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,680.000 $50.000 $47.460 $45.000 $89.000 $40.509 $50.000 $33.000 $64.390 $30.000 $30.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 60.000 $50.000 $51.300 $45.000 $89.000 $25.800 $50.000 $33.000 $64.410 $36.000 $30.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,290.000 $8.000 $7.380 $10.000 $11.000 $9.660 $13.000 $18.000 $9.460 $11.000 $6.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 800.000 $7.000 $16.930 $10.000 $11.000 $9.660 $8.000 $20.000 $13.490 $9.000 $6.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $7.000 $7.770 $10.000 $11.000 $9.600 $8.000 $20.000 $60.380 $19.000 $8.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,120.000 $10.000 $8.170 $15.000 $12.000 $19.250 $12.000 $21.000 $8.370 $18.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,680.000 $10.000 $9.800 $15.000 $12.000 $16.070 $12.000 $21.000 $8.790 $16.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 60.000 $10.000 $21.930 $15.000 $12.000 $16.050 $12.000 $21.000 $9.380 $17.000 $15.000
CONC CURB (DOWEL) (TY II)
LF 1,784.000 $12.000 $8.970 $15.000 $6.000 $9.440 $5.000 $23.000 $18.800 $15.000 $3.000
DRIVEWAYS (CONC)
SY 453.000 $100.000 $86.500 $78.000 $75.000 $81.990 $85.000 $115.000 $130.250 $86.000 $85.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,390.880 $3,500.000 $2,500.000 $2,700.570 $2,500.000 $2,600.000 $2,150.000 $2,390.880 $2,150.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,000.000 $1,115.680 $1,800.000 $1,200.000 $1,815.030 $1,500.000 $1,500.000 $1,445.000 $1,115.680 $1,445.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $300.000 $280.000 $380.000 $300.000 $314.020 $300.000 $250.000 $250.000 $280.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,112.000 $3,950.000 $3,200.000 $3,749.390 $3,500.000 $3,100.000 $2,985.000 $3,112.000 $2,985.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $350.000 $200.000 $275.000 $220.000 $251.220 $250.000 $200.000 $200.000 $200.000 $200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,500.000 $2,800.000 $3,800.000 $3,000.000 $217.640 $4,500.000 $4,600.000 $4,175.000 $2,800.000 $4,175.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,500.000 $1,500.000 $2,500.000 $1,650.000 $217.640 $1,300.000 $1,300.000 $1,200.000 $1,500.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 3.000 $25,000.000 $26,700.000 $32,000.000 $28,000.000 $33,378.050 $28,000.000 $27,000.000 $26,400.000 $26,700.000 $26,400.000
REMOVE RD IL ASM (TRANS-BASE)
EA 6.000 $750.000 $395.000 $150.000 $425.000 $496.150 $2,000.000 $100.000 $395.000 $1,104.440 $395.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 6.000 $4,500.000 $5,950.000 $7,000.000 $6,500.000 $7,473.650 $7,500.000 $6,100.000 $5,950.000 $6,374.560 $5,950.000
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 4,020.000 $12.000 $11.500 $15.000 $12.500 $14.440 $22.000 $18.000 $11.500 $20.580 $11.500
CONDT (PVC) (SCH 80) (2")
LF 3,105.000 $14.000 $8.500 $13.000 $9.500 $10.680 $11.000 $9.000 $8.500 $9.440 $8.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 725.000 $20.000 $18.000 $20.000 $20.000 $22.610 $20.000 $12.000 $18.000 $15.060 $18.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,020.000 $25.000 $22.000 $22.870 $24.000 $27.630 $18.000 $13.000 $22.000 $12.040 $22.000
ELEC CONDR (NO.4) BARE
LF 10,720.000 $2.500 $1.900 $2.600 $2.200 $2.390 $2.000 $2.100 $1.900 $1.620 $1.900
ELEC CONDR (NO.4) INSULATED
LF 21,440.000 $2.500 $2.250 $2.600 $2.500 $2.830 $2.200 $2.500 $2.250 $1.700 $2.250
GROUND BOX TY D (162922)W/APRON
EA 7.000 $1,200.000 $950.000 $1,500.000 $1,050.000 $1,193.270 $1,200.000 $1,000.000 $950.000 $1,082.330 $950.000
REMOVE GROUND BOX
EA 7.000 $200.000 $200.000 $175.000 $210.000 $251.220 $600.000 $136.000 $200.000 $543.460 $200.000
ALUMINUM SIGNS (TY G)
SF 99.000 $30.000 $42.000 $75.000 $45.000 $52.760 $60.000 $48.000 $55.000 $45.000 $55.000
ALUMINUM SIGNS (TY O)
SF 101.000 $30.000 $40.000 $78.250 $45.000 $50.240 $50.000 $48.000 $40.000 $40.920 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $660.000 $655.000 $1,500.000 $575.000 $565.230 $550.000 $460.000 $450.000 $535.710 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $750.000 $730.000 $1,200.000 $900.000 $948.340 $850.000 $760.000 $755.000 $865.000 $755.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,250.000 $905.000 $1,200.000 $1,100.000 $1,073.950 $950.000 $860.000 $855.000 $1,022.630 $855.000
REMOVE SM RD SN SUP&AM
EA 9.000 $130.000 $115.000 $500.000 $100.000 $94.210 $90.000 $110.000 $75.000 $85.000 $75.000
INSTALL LRSS (STRUCT STEEL)
LB 990.000 $6.000 $7.950 $13.750 $8.500 $9.990 $7.000 $8.000 $5.950 $5.930 $5.950
REMOVE LRSA
EA 2.000 $250.000 $225.000 $345.000 $250.000 $282.620 $1,500.000 $260.000 $1,250.000 $1,500.000 $1,250.000
RELOCATE LRSS (SIGN ONLY)
EA 2.000 $900.000 $775.000 $750.000 $800.000 $973.460 $1,500.000 $510.000 $1,250.000 $1,800.000 $1,250.000
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
EA 2.000 $25,000.000 $31,500.000 $32,000.000 $32,500.000 $39,566.400 $40,000.000 $29,000.000 $31,500.000 $35,887.470 $31,500.000
REMOVE OVERHD SIGN SUP
EA 1.000 $5,000.000 $2,436.000 $2,500.000 $2,600.000 $3,059.810 $13,000.000 $1,100.000 $2,436.000 $10,524.670 $2,436.000
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 98.000 $1.500 $2.000 $7.000 $2.200 $3.770 $3.000 $2.000 $3.000 $2.000 $3.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,739.000 $1.500 $1.000 $2.750 $1.100 $1.760 $1.500 $1.050 $1.400 $1.000 $1.400
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 3,274.000 $2.000 $0.800 $3.500 $1.000 $3.140 $2.500 $0.850 $2.500 $0.800 $2.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 6,369.000 $1.500 $0.600 $2.750 $0.750 $1.760 $1.500 $0.630 $1.400 $0.600 $1.400
REFL PAV MRKR TY II-C-R
EA 224.000 $7.000 $5.000 $14.000 $6.000 $7.540 $6.000 $5.200 $6.000 $5.000 $6.000
ELIM EXT PAV MRK & MRKS (6")
LF 5,501.000 $0.600 $0.450 $1.250 $0.500 $0.850 $0.700 $0.470 $0.680 $0.450 $0.680
ELIM EXT PAV MRK & MRKS (8")
LF 2,092.000 $1.000 $0.650 $1.500 $0.800 $0.880 $0.700 $0.700 $0.700 $0.650 $0.700
ELIM EXT PAV MRK & MRKS (12")
LF 565.000 $2.000 $1.100 $5.500 $1.200 $2.200 $2.000 $1.150 $1.750 $1.100 $1.750
ELIM EXT PAV MRK & MRKS (ARROW)
EA 3.000 $60.000 $38.000 $150.000 $40.000 $81.650 $75.000 $39.000 $65.000 $38.000 $65.000
PAV SURF PREP FOR MRK (6")
LF 7,847.000 $0.100 $0.050 $0.700 $0.060 $0.080 $0.100 $0.050 $0.060 $0.050 $0.060
PAV SURF PREP FOR MRK (8")
LF 1,275.000 $0.100 $0.080 $0.700 $0.100 $0.100 $0.100 $0.080 $0.080 $0.080 $0.080
PATCHING MILLED CONCRETE RUMBLE STRIPS
LF 2,685.000 $45.000 $20.430 $15.000 $14.000 $11.250 $50.000 $25.000 $13.280 $7.000 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 46.000 $140.000 $76.820 $75.000 $68.000 $53.380 $100.000 $200.000 $489.130 $40.000 $15,000.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 5,244.000 $1.500 $0.850 $2.700 $1.000 $1.570 $1.500 $0.870 $1.250 $0.850 $1.250
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 1,509.000 $1.500 $1.000 $2.800 $1.100 $1.570 $1.500 $1.050 $1.250 $1.000 $1.250
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 143.000 $1.500 $2.000 $6.500 $2.200 $3.200 $3.000 $2.100 $2.550 $2.000 $2.550
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 2,945.000 $2.500 $1.200 $3.750 $1.000 $2.640 $2.300 $1.200 $2.100 $1.200 $2.100
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 1,392.000 $1.500 $1.000 $2.750 $1.400 $1.570 $1.400 $1.000 $1.250 $1.000 $1.250
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 1,509.000 $1.500 $1.500 $2.750 $1.600 $1.570 $1.500 $1.600 $1.250 $1.500 $1.250
TMA (STATIONARY)
DAY 20.000 $275.000 $111.970 $500.000 $500.000 $219.810 $300.000 $470.000 $510.910 $150.000 $75.000
TMA (MOBILE OPERATION)
HR 56.000 $100.000 $111.970 $350.000 $1.000 $117.760 $80.000 $118.000 $221.620 $36.000 $450.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 3.000 $4,500.000 $4,435.000 $7,500.000 $4,650.000 $5,570.700 $6,500.000 $5,000.000 $4,435.000 $5,937.690 $4,435.000
Totals: $2,917,359.900 $3,167,865.711 $3,173,297.800 $3,275,000.001 $3,442,108.424 $3,587,689.800 $3,592,948.420 $3,768,953.951 $3,876,339.650 $4,306,030.080