MILAM US 190 (0185-03-033)

Items: 102

County: MILAM
Length: N/A
Highway: US 190
District: BRYAN
Control Number: 0185-03-033
DBE Goal: 600.0%
Project: STP 2B24(387)HES
Guaranty: N/A
Time: 190 WORKING DAYS
Engineer's Estimate: $2,941,639.13
Date: 08/02/2024 (1 year ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH TURN LANES
Mail/Deliver Bids To: N/A
JAMES KREAMER
RENE PEQUENO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,941,639.13
$3,193,316.70
Over/Under Est: 8.56% $251,677.57
Over/Under Est: 11.14% $327,704.87
Amt Left: 2.38% $76,027.30
Over/Under Est: 18.44% $542,582.69
Amt Left: 9.11% $290,905.12
Delta: -6.57% -$214,877.82
Over/Under Est: 20.29% $596,806.62
Amt Left: 10.81% $345,129.05
Delta: -1.56% -$54,223.93
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 8.68% $277,220.20
LARRY YOUNG PAVING, INC. 3.22% $102,839.75
TRAFFIC SIGNS & LINES, LLC 2.96% $94,535.92
CEN TEX HYDROSEED, INC. 2.28% $72,818.21
DUSTROL, INC. 0.46% $14,691.39
HIGHWAY 1 LLC 0.45% $14,372.02
CEN-TREE SOLUTIONS LLC 0.30% $9,581.34
PROFESSIONAL TRAFFIC CONTROL LLC 0.29% $9,261.97
Total: 18.64% $595,320.80

Bid Items & Bid Tabulations

102 Total 0 of 102
MILAM  |  US 190  |  BRYAN  |  0185-03-033  |  08/02/2024  |  $2,941,639.13  |  STP 2B24(387)HES  |  INTERS IMPRVS WITH TURN LANES  |  190 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
LARRY YOUNG PAVING, INC.
PREPARING ROW
STA 3.000 $4,000.000 $5,000.000 $6,000.000 $8,500.000 $4,200.000
REMOVING CONC (DRIVEWAYS)
SY 210.000 $20.000 $25.000 $30.000 $32.400 $18.000
REMOVING CONC (MISC)
SY 27.000 $30.000 $24.000 $50.000 $125.250 $18.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 234.000 $6.000 $31.000 $20.000 $40.200 $32.000
REMOVE STAB BASE & ASPH PAV (24")
SY 1,333.000 $15.000 $41.000 $25.000 $31.400 $44.000
SUBGRADE WIDENING (ORD COMP)
STA 64.670 $400.000 $920.000 $1,600.000 $755.000 $900.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 150.000 $18.000 $62.000 $50.000 $92.000 $69.000
BACKFILL (TY A OR B)
STA 64.670 $220.000 $900.000 $500.000 $275.000 $500.000
FURNISHING AND PLACING TOPSOIL (4")
SY 10,399.000 $2.000 $2.000 $2.000 $2.000 $1.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 10,399.000 $0.250 $0.700 $0.700 $0.750 $0.750
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 10,399.000 $0.250 $0.650 $0.700 $0.700 $0.750
VEGETATIVE WATERING
MG 104.000 $30.000 $15.000 $25.000 $1.000 $50.000
FL BS (CMP IN PLC)(TY A GR 1-2)(9")
SY 5,177.000 $26.000 $27.000 $27.000 $26.750 $38.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
SY 6,075.000 $45.000 $33.000 $33.000 $35.950 $35.000
LIME TRT (EXST MATL)(10")
SY 6,290.000 $8.250 $1.500 $6.000 $3.250 $6.750
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 94.000 $335.000 $100.000 $350.000 $345.000 $410.000
LIME TRT (SUBGRADE)(12")
SY 7,467.000 $3.500 $1.500 $6.000 $3.250 $8.750
CEMENT
TON 94.000 $250.000 $100.000 $275.000 $366.000 $300.000
CEMENT TREAT (SUBGRADE)(10")
SY 6,290.000 $4.700 $1.000 $6.000 $5.000 $5.250
CEMENT TREAT (SUBGRADE)(12")
SY 7,467.000 $2.000 $1.000 $6.000 $5.500 $4.250
PRIME COAT (MC-30 OR EC-30)
GAL 2,695.000 $4.000 $46.470 $7.000 $8.350 $5.500
ASPH (AC-20-5TR)
GAL 7,885.000 $5.250 $4.000 $5.000 $5.650 $7.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 166.000 $200.000 $295.000 $250.000 $251.500 $220.000
PLANE ASPH CONC PAV (2")
SY 302.000 $3.250 $25.000 $15.000 $21.200 $15.000
PLANE ASPH CONC PAV (4")
SY 333.000 $3.900 $28.000 $15.000 $23.500 $21.000
PLANE ASPH CONC PAV (2 1/2")
SY 14,902.000 $4.000 $3.500 $4.000 $1.750 $4.750
PLANE ASPH CONC PAV (3 1/2")
SY 2,224.000 $5.100 $7.000 $6.000 $7.850 $5.250
TRENCH EXCAVATION PROTECTION
LF 5.000 $17.000 $25.000 $50.000 $29.400 $8.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 32.000 $300.000 $290.000 $350.000 $383.000 $390.000
CL C CONC (CULV)
CY 4.800 $1,500.000 $3,700.000 $4,000.000 $4,118.000 $960.000
RIPRAP (CONC) (CL B) (4")
CY 3.400 $1,000.000 $1,300.000 $1,500.000 $1,412.000 $1,700.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 11.000 $1,538.380 $1,000.000 $1,275.000 $1,118.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 336.000 $80.000 $75.000 $80.000 $82.400 $94.000
RC PIPE (CL III)(24 IN)
LF 48.000 $115.000 $210.000 $200.000 $235.300 $120.000
WINGWALL (PW - 2) (HW=3 FT)
EA 2.000 $10,100.000 $6,500.000 $7,500.000 $7,059.000 $15,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $27,000.000 $39,000.000 $38,000.000 $42,354.000 $35,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $32,000.000 $54,000.000 $50,000.000 $58,825.000 $38,000.000
WINGWALL (SW - 0) (HW=3 FT)
EA 3.000 $9,000.000 $4,200.000 $5,000.000 $4,706.000 $11,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 24.000 $1,400.000 $1,300.000 $1,500.000 $1,411.800 $1,900.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 2.000 $1,700.000 $2,100.000 $2,000.000 $2,353.000 $2,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,800.000 $2,700.000 $2,500.000 $2,941.250 $2,200.000
REMOV STR (SET)
EA 5.000 $600.000 $1,300.000 $1,200.000 $1,411.800 $600.000
REMOV STR (WINGWALL)
EA 7.000 $1,900.000 $1,600.000 $2,000.000 $1,764.750 $1,200.000
REMOV STR (PIPE)
LF 24.000 $28.000 $50.000 $50.000 $58.830 $32.000
REMOV STR (PIPE)
EA 13.000 $1,000.000 $1,600.000 $1,500.000 $1,764.750 $900.000
REMOV STR (CURB)
EA 2.000 $1,000.000 $1,300.000 $1,500.000 $1,470.000 $1,100.000
MOBILIZATION
LS 1.000 $293,000.000 $250,000.000 $320,000.000 $348,446.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $5,000.000 $5,000.000 $5,000.000 $6,600.000 $8,300.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 560.000 $40.000 $40.000 $40.000 $42.350 $47.000
ROCK FILTER DAMS (REMOVE)
LF 560.000 $12.000 $11.000 $10.000 $11.750 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,365.000 $4.000 $4.000 $4.000 $7.900 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,365.000 $1.000 $1.000 $1.000 $1.200 $1.250
CONCRETE GUTTER (MODIFIED)
LF 691.000 $70.000 $50.000 $90.000 $100.000 $44.000
INTERSECTIONS (ACP)
SY 1,740.000 $60.000 $75.000 $50.000 $57.900 $72.000
DRIVEWAYS (CONC)
SY 192.000 $120.000 $165.000 $250.000 $294.000 $110.000
DRIVEWAYS (ACP)
SY 1,761.000 $70.000 $65.000 $45.000 $91.350 $75.000
RUMBLE STRIPS (SHOULDER)
LF 14,000.000 $0.200 $0.300 $0.750 $0.800 $0.500
RUMBLE STRIPS (CENTERLINE)
LF 14,000.000 $0.250 $0.300 $0.600 $0.650 $0.250
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 6.000 $350.000 $565.000 $300.000 $352.950 $680.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 1.000 $400.000 $640.000 $400.000 $382.350 $770.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 4.000 $5,000.000 $8,300.000 $7,500.000 $8,235.500 $7,500.000
CONDT (PVC) (SCH 40) (2")
LF 400.000 $15.000 $20.000 $20.000 $17.650 $20.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 433.000 $30.000 $25.000 $40.000 $41.200 $24.000
ELEC CONDR (NO.8) INSULATED
LF 2,544.000 $2.000 $4.000 $4.000 $4.100 $2.000
GROUND BOX TY D (162922)W/APRON
EA 6.000 $1,500.000 $1,865.000 $2,000.000 $1,885.000 $1,900.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $7,500.000 $9,800.000 $7,000.000 $7,650.000 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $725.000 $620.000 $775.000 $885.000 $740.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,000.000 $890.000 $800.000 $940.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,150.000 $965.000 $1,400.000 $1,411.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $600.000 $1,640.000 $1,500.000 $1,530.000 $2,000.000
REMOVE SM RD SN SUP&AM
EA 30.000 $125.000 $165.000 $100.000 $117.650 $200.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 8.000 $120.000 $140.000 $100.000 $117.650 $160.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,320.000 $0.600 $1.000 $0.700 $0.610 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 110.000 $0.350 $1.000 $0.550 $0.550 $0.750
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 17,838.000 $0.500 $1.000 $0.550 $0.530 $0.750
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 130.000 $5.000 $6.000 $6.000 $4.710 $7.750
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 10,246.000 $1.000 $1.500 $1.500 $0.950 $1.750
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 10,246.000 $1.000 $1.500 $1.500 $0.950 $1.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 490.000 $1.250 $1.000 $1.500 $1.000 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 559.000 $1.500 $1.000 $1.500 $1.000 $1.250
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,320.000 $1.000 $1.750 $2.000 $1.440 $2.250
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 320.000 $7.000 $13.000 $8.000 $5.290 $11.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 6.000 $150.000 $385.000 $260.000 $176.480 $330.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 6.000 $192.000 $475.000 $280.000 $190.590 $360.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 5.000 $35.000 $215.000 $50.000 $52.940 $62.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 13,772.000 $0.600 $1.250 $0.900 $1.140 $1.250
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 110.000 $2.000 $1.500 $0.900 $1.180 $1.250
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 17,838.000 $0.600 $1.250 $0.900 $1.140 $1.250
REFL PAV MRKR TY I-C
EA 116.000 $3.300 $11.000 $7.000 $5.000 $9.250
REFL PAV MRKR TY II-A-A
EA 883.000 $4.500 $9.000 $7.000 $4.710 $9.250
ELIM EXT PAV MRK & MRKS (4")
LF 3,126.000 $0.400 $2.000 $0.750 $0.450 $0.750
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $1,000.000 $850.000 $1,000.000 $588.250 $830.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $9,500.000 $7,700.000 $12,000.000 $12,355.000 $7,900.000
SP MIXES SP-B PG64-22
TON 1,872.000 $150.000 $140.000 $125.000 $136.950 $150.000
SP MIXES SP-C SAC-A PG70-22
TON 1,458.000 $150.000 $150.000 $135.000 $162.400 $170.000
STONE-MTRX-ASPH SMA-D PG76-22
TON 2,660.000 $130.000 $175.000 $175.000 $172.400 $190.000
BONDING COURSE
GAL 1,935.000 $5.000 $4.000 $5.000 $4.400 $5.500
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 2,994.000 $5.500 $4.000 $4.500 $9.140 $5.000
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 2,994.000 $2.000 $1.000 $1.000 $1.200 $1.250
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $7,000.000 $5,600.000 $12,000.000 $2,940.000 $9,000.000
TMA (STATIONARY)
DAY 186.000 $225.000 $275.000 $250.000 $615.000 $260.000
TMA (MOBILE OPERATION)
DAY 4.000 $300.000 $435.000 $500.000 $1,170.000 $1,000.000
Totals: $2,941,639.130 $3,193,316.700 $3,269,344.000 $3,484,221.820 $3,538,445.750