MCLENNAN SL 2 (0209-01-073)

Items: 53

County: MCLENNAN
Length: N/A
Highway: SL 2
District: WACO
Control Number: 0209-01-073
DBE Goal: N/A
Project: C 209-1-73
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $2,043,512.10
Date: 12/01/2021 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$2,043,512.10
$2,132,685.60
Over/Under Est: 4.36% $89,173.50
Over/Under Est: 11.07% $226,152.30
Amt Left: 6.42% $136,978.80
$2,419,573.46
Over/Under Est: 18.4% $376,061.36
Amt Left: 13.45% $286,887.86
Delta: -6.60% -$149,909.06
$2,447,657.60
Over/Under Est: 19.78% $404,145.50
Amt Left: 14.77% $314,972.00
Delta: -1.16% -$28,084.14
$2,697,737.00
Over/Under Est: 32.01% $654,224.90
Amt Left: 26.49% $565,051.40
Delta: -10.22% -$250,079.40
Over/Under Est: 41.05% $838,933.90
Amt Left: 35.16% $749,760.40
Delta: -6.85% -$184,709.00

Bid Items & Bid Tabulations

53 Total 0 of 53
MCLENNAN  |  SL 2  |  WACO  |  0209-01-073  |  12/01/2021  |  $2,043,512.10  |  C 209-1-73  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CROSS PLUS CONSTRUCTION, LLC
B & MS CONSTRUCTION, INC.
ALTUS CONSTRUCTION LLC
TI-ZACK CONCRETE, INC.
FNH CONSTRUCTION, LLC
HIGHWAY 19 CONSTRUCTION LLC
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 9.000 $600.000 $800.000 $750.000 $2,169.930 $1,000.000 $2,000.000 $1,000.000
REMOVING CONC (FOUNDATIONS)
SY 3.700 $30.000 $200.000 $175.000 $723.310 $200.000 $1,000.000 $100.000
REMOVING CONC (SIDEWALKS)
SY 2,294.000 $10.000 $20.000 $25.000 $6.660 $15.000 $20.000 $25.000
REMOVING CONC (DRIVEWAYS)
SY 2,121.000 $22.000 $20.000 $25.000 $9.130 $25.000 $20.000 $25.000
REMOVING CONC (MISC)
SY 2.000 $25.000 $95.000 $28.000 $723.310 $125.000 $500.000 $100.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,403.000 $14.000 $15.000 $19.000 $6.060 $10.000 $20.000 $10.000
REMOV STAB BASE AND ASPH PAV (0"-12")
SY 237.000 $7.000 $98.000 $46.000 $9.530 $30.000 $20.000 $15.000
FURNISHING AND PLACING TOPSOIL (4")
SY 3,028.000 $1.000 $3.000 $9.500 $1.120 $5.000 $10.000 $5.000
BLOCK SODDING
SY 3,028.000 $4.000 $5.000 $7.000 $4.520 $3.000 $8.000 $6.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 400.000 $0.160 $1.000 $2.500 $0.230 $3.000 $4.000 $1.000
VEGETATIVE WATERING
MG 77.600 $16.000 $26.000 $50.000 $43.400 $1.000 $35.000 $50.000
D-GR HMA(SQ) TY-D PG70-22
TON 500.000 $86.000 $198.000 $172.000 $262.620 $250.000 $200.000 $700.000
RIPRAP (CONC)(4 IN)
CY 85.100 $435.000 $450.000 $414.000 $470.290 $750.000 $550.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 22.700 $450.000 $500.000 $500.000 $470.290 $750.000 $650.000 $600.000
RAIL (HANDRAIL)(TY A)
LF 20.000 $145.000 $200.000 $225.000 $347.370 $200.000 $185.000 $250.000
RC PIPE (CL III)(18 IN)
LF 9.000 $70.000 $125.000 $178.000 $578.650 $250.000 $95.000 $100.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,010.000 $2,500.000 $1,350.000 $4,318.170 $1,500.000 $2,500.000 $1,000.000
ADJUSTING MANHOLES & INLETS
EA 3.000 $950.000 $600.000 $850.000 $1,808.280 $250.000 $2,500.000 $3,500.000
ADJUSTING MANHOLES (SANITARY)
EA 5.000 $1,100.000 $652.000 $850.000 $1,808.280 $300.000 $2,500.000 $1,000.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 2.000 $250.000 $1,200.000 $460.000 $2,169.930 $375.000 $750.000 $350.000
ADJUSTING MANHOLES (WATER METER)
EA 8.000 $670.000 $1,200.000 $800.000 $774.910 $95.000 $750.000 $350.000
REMOVE STR (BOLLARD)
EA 1.000 $250.000 $259.000 $80.000 $2,893.240 $750.000 $250.000 $100.000
MOBILIZATION
LS 1.000 $200,000.000 $200,000.000 $75,000.000 $238,692.550 $265,000.000 $250,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,000.000 $8,500.000 $5,400.000 $21,699.320 $1,000.000 $8,500.000 $10,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,960.000 $3.700 $3.000 $4.000 $2.790 $0.100 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,960.000 $1.200 $1.000 $1.750 $0.930 $0.100 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,490.000 $4.000 $15.000 $7.000 $3.660 $0.100 $18.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,490.000 $2.000 $2.000 $3.500 $1.450 $0.100 $9.000 $1.000
CONC CURB & GUTTER (TY II)
LF 3,318.000 $19.000 $25.000 $28.000 $27.520 $35.000 $45.000 $40.000
DRIVEWAYS (CONC)
SY 2,726.000 $70.000 $74.000 $68.000 $95.010 $100.000 $85.000 $110.000
DRIVEWAYS (CONC) (HES)
SY 250.000 $90.000 $74.000 $145.000 $190.020 $125.000 $125.000 $150.000
CONC SIDEWALKS (4")
SY 8,004.000 $55.000 $59.000 $65.000 $63.660 $100.000 $58.000 $75.000
CURB RAMPS (TY 1)
EA 73.000 $1,750.000 $1,298.000 $3,165.000 $1,660.180 $1,950.000 $2,500.000 $1,500.000
CURB RAMPS (TY 2)
EA 8.000 $2,120.000 $1,500.000 $3,500.000 $2,134.290 $1,950.000 $2,500.000 $2,500.000
CURB RAMPS (TY 3)
EA 51.000 $2,240.000 $1,500.000 $2,250.000 $2,045.440 $1,950.000 $2,500.000 $1,800.000
CURB RAMPS (TY 5)
EA 9.000 $2,660.000 $1,500.000 $2,500.000 $3,687.720 $1,950.000 $2,500.000 $3,000.000
CURB RAMPS (TY 7)
EA 52.000 $1,725.000 $1,500.000 $2,700.000 $1,758.730 $1,950.000 $2,500.000 $1,800.000
CURB RAMPS (TY 10)
EA 7.000 $1,725.000 $1,500.000 $3,200.000 $2,278.590 $1,950.000 $2,500.000 $1,800.000
CURB RAMPS (TY 21)
EA 2.000 $2,560.000 $1,500.000 $3,200.000 $3,577.870 $2,000.000 $2,500.000 $4,500.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 750.000 $187.000 $99.000 $145.000 $95.490 $145.000 $85.000 $300.000
MTL W-BEAM GD FEN (STEEL POST)
LF 256.000 $25.000 $36.000 $50.000 $50.130 $30.000 $40.000 $75.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,000.000 $3,500.000 $2,950.000 $6,219.080 $3,000.000 $3,200.000 $3,500.000
RELOCATE EXISTING MAILBOX
EA 1.000 $530.000 $100.000 $690.000 $723.310 $400.000 $850.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 54.000 $683.000 $350.000 $405.000 $800.410 $275.000 $850.000 $850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 24.000 $673.000 $152.000 $375.000 $646.050 $275.000 $850.000 $350.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,679.000 $9.000 $12.000 $9.500 $10.130 $7.500 $20.000 $7.000
ELIM EXT PAV MRK & MRKS (24")
LF 947.000 $9.000 $12.000 $7.000 $7.230 $5.500 $20.000 $5.000
RELOCATE OF PEDESTRIAN PUSH BUTTON
EA 6.000 $500.000 $299.000 $295.000 $478.250 $500.000 $12,500.000 $1,500.000
FIXED BOLLARD
EA 2.000 $1,000.000 $1,500.000 $550.000 $1,562.350 $275.000 $1,500.000 $800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $10,300.000 $1,200.000 $4,500.000 $7,233.110 $275.000 $12,000.000 $10,000.000
GROUND BOX (ADJUST)
EA 22.000 $700.000 $200.000 $750.000 $723.310 $500.000 $250.000 $1,100.000
TMA (STATIONARY)
DAY 160.000 $170.000 $500.000 $220.000 $289.320 $1.000 $250.000 $250.000
TMA (MOBILE OPERATION)
HR 120.000 $70.000 $900.000 $90.000 $108.500 $1.000 $85.000 $50.000
Totals: $2,043,512.100 $2,132,685.600 $2,269,664.400 $2,419,573.479 $2,447,657.600 $2,697,737.000 $2,882,446.000