MCLENNAN US 84 (0162-01-099)

Items: 57

County: MCLENNAN
Length: 0.0000 MILES
Highway: US 84
District: WACO
Control Number: 0162-01-099
DBE Goal: 0.0%
Project: C 162-1-99
Guaranty: $100,000.00
Time: 195 WORKING DAYS
Engineer's Estimate: $19,749,993.52
Date: 09/06/2024 (1 year ago)
Contract Number: 9243211
Type: RESURFACE ROADWAY
Project ID: A00134062
Project Description: PAVEMENT REPAIR AND OVERLAY
Mail/Deliver Bids To: N/A
CLAYTON ZACHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$19,749,993.52
$10,569,490.05
Over/Under Est: -46.48% -$9,180,503.47
Over/Under Est: -38.29% -$7,562,363.82
Amt Left: 15.31% $1,618,139.65
Over/Under Est: -37.48% -$7,401,388.60
Amt Left: 16.83% $1,779,114.87
Delta: -1.32% -$160,975.22
$21,193,449.50
Over/Under Est: 7.31% $1,443,455.98
Amt Left: 100.52% $10,623,959.45
Delta: -71.63% -$8,844,844.58
Subcontractor Percentage Amount
STRUCTURAL INTEGRITY GROUP LLC 9.28% $1,016,181.54
FORTSON CONTRACTING, INC. 1.88% $205,864.36
LINEAR TRAFFIC MARKINGS LLC 1.62% $177,393.76
WILKO INDUSTRIAL, L.L.C. 1.35% $147,828.13
SUPERIOR TRAFFIC CONTROL, LLC 0.69% $75,556.60
PRIMATE CONSTRUCTION, LP 0.67% $73,366.56
S & S BRIDGE PAINTING, INC. 0.45% $49,276.04
TEXOP CONSTRUCTION 0.14% $15,330.32
WEST TEXAS RUMBLE STRIP LLC 0.13% $14,235.30
Total: 16.21% $1,775,032.61

Bid Items & Bid Tabulations

57 Total 0 of 57
MCLENNAN  |  US 84  |  WACO  |  0162-01-099  |  09/06/2024  |  $19,749,993.52  |  C 162-1-99  |  RESURF ROADWAY  |  195 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
FNH CONSTRUCTION, LLC
BACKFILL (TY B)
STA 418.200 $195.000 $250.000 $250.000 $290.000 $450.000
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 48,511.000 $0.420 $0.430 $0.500 $0.500 $1.000
HYDRO MULCH SEED (TEMP_WARM_COOL)
SY 48,511.000 $0.420 $0.390 $0.450 $0.450 $1.000
VEGETATIVE WATERING
TGL 788.000 $25.880 $37.000 $25.000 $1.000 $50.000
SP MIXES SP-B PG64-22
TON 39,614.000 $249.150 $90.000 $90.000 $103.000 $170.000
SP MIXES SP-C SAC-B PG70-22
TON 31,691.000 $112.000 $92.000 $100.000 $113.000 $180.000
TACK COAT
GAL 100,835.000 $3.750 $2.050 $1.000 $0.010 $10.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 3,500.000 $69.250 $65.500 $67.000 $80.000 $90.000
PLANE ASPH CONC PAV(0" TO 4")
SY 294,629.000 $5.500 $3.450 $3.000 $2.450 $7.000
PLANE ASPH CONC PAV(2" TO 4")
SY 3,351.000 $8.250 $10.000 $5.000 $11.000 $10.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 4,958.000 $8.000 $9.500 $20.000 $13.000 $45.000
CONC STR REPAIR (STANDARD)
SF 2,000.000 $150.000 $128.000 $60.000 $140.000 $50.000
RIPRAP (MOW STRIP)(4 IN)
CY 236.000 $650.000 $675.000 $700.000 $690.000 $550.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 1,480.000 $50.000 $48.000 $60.000 $55.000 $100.000
POLYESTER POLYMER CONC OVERLAY (1")
SY 5,334.000 $125.000 $152.000 $250.000 $152.000 $50.000
MOBILIZATION
LS 1.000 $1,787,819.000 $380,000.000 $1,200,000.000 $995,000.000 $2,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $5,000.000 $2,500.000 $4,950.000 $15,000.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $100.000 $77.200 $150.000 $200.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,100.000 $13,625.000 $15,000.000 $25,000.000 $16,500.000
TMA (STATIONARY)
DAY 90.000 $200.000 $240.000 $400.000 $250.000 $250.000
TMA (MOBILE OPERATION)
HR 1,080.000 $57.800 $7.000 $75.000 $5.000 $55.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,700.000 $4.500 $3.250 $5.000 $6.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,700.000 $1.000 $1.000 $1.500 $1.000 $2.000
INTERSECTIONS (ACP)
SY 3,575.000 $45.000 $40.000 $35.000 $55.000 $50.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 62,261.000 $0.250 $0.220 $0.200 $0.290 $0.500
MTL W-BEAM GD FEN (STEEL POST)
LF 2,900.000 $34.550 $28.500 $40.000 $32.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 16.000 $2,750.000 $2,700.000 $3,000.000 $3,000.000 $1,850.000
TRANSITION ADJUSTMENT
EA 4.000 $82.500 $500.000 $700.000 $750.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 2,400.000 $5.000 $2.500 $3.000 $3.000 $3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 16.000 $340.000 $225.000 $300.000 $250.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 24.000 $3,450.000 $2,877.500 $3,200.000 $3,000.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $500.000 $250.000 $300.000 $275.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 60.000 $47.500 $45.000 $50.000 $50.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 15,704.000 $0.280 $0.350 $0.500 $0.830 $1.500
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 2,267.000 $1.500 $0.450 $2.250 $0.560 $6.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 10,569.000 $0.500 $0.400 $0.900 $0.560 $6.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,186.000 $5.000 $4.000 $7.000 $1.940 $20.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 4,300.000 $0.170 $0.350 $0.500 $0.560 $1.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 62,902.000 $0.280 $0.320 $0.400 $0.500 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,977.000 $1.500 $0.920 $1.500 $1.500 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,820.000 $1.500 $0.920 $1.500 $1.500 $6.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 2,267.000 $1.800 $1.150 $3.500 $2.220 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,569.000 $1.250 $0.850 $2.000 $1.780 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,186.000 $10.160 $6.500 $15.000 $15.500 $20.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 84.000 $46.200 $40.000 $100.000 $72.000 $500.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 15,704.000 $0.780 $0.620 $1.000 $0.900 $1.500
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 48,924.000 $0.780 $0.600 $0.900 $0.900 $1.500
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 4,300.000 $0.780 $0.620 $0.950 $0.900 $1.500
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 62,902.000 $0.780 $0.600 $0.900 $0.900 $1.500
PREFAB PM TY C (W)(ARROW)
EA 96.000 $275.000 $220.000 $350.000 $300.000 $250.000
PREFAB PM TY C (W)(WORD)
EA 52.000 $352.500 $250.000 $550.000 $420.000 $250.000
REFL PAV MRKR TY I-C
EA 472.000 $6.000 $4.000 $7.000 $6.500 $6.000
REFL PAV MRKR TY II-A-A
EA 546.000 $7.000 $4.000 $7.000 $6.500 $6.000
PLOWABLE REFL PAV MRKR TY II-C-R
EA 968.000 $29.750 $4.000 $7.000 $6.500 $6.000
DRIFTWOOD REMOVAL
LS 1.000 $1,000.000 $10,000.000 $20,000.000 $14,000.000 $200,000.000
REPAIR (T4 (A))
LF 25.000 $205.000 $835.000 $800.000 $425.000 $5,000.000
BENT CAP/ABUTMENT CAP CLEANING
EA 2.000 $1,700.000 $5,000.000 $20,000.000 $5,000.000 $15,000.000
Totals: $19,749,993.520 $10,569,490.050 $12,187,629.700 $12,348,604.920 $21,193,449.500