Show Job Controls
Bid Cobra

MCLENNAN US 84 (0055-15-079)

Items: 47

County: MCLENNAN
Length: 0.0000 MILES
Highway: US 84
District: WACO
Control Number: 0055-15-079
DBE Goal: 4.5%
Project: F 2B24(523)
Guaranty: $100,000.00
Time: 135 WORKING DAYS
Engineer's Estimate: $8,243,561.94
Date: 09/05/2024 (1 year ago)
Contract Number: 9243009
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00187065
Project Description: OVERLAY
Mail/Deliver Bids To: N/A
CLAYTON ZACHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$8,243,561.94
$8,584,310.10
Over/Under Est: 4.13% $340,748.16
Over/Under Est: 23.62% $1,947,090.51
Amt Left: 18.71% $1,606,342.35
Over/Under Est: 26.3% $2,168,045.11
Amt Left: 21.29% $1,827,296.95
Delta: -2.17% -$220,954.60
Over/Under Est: 26.43% $2,178,433.83
Amt Left: 21.41% $1,837,685.67
Delta: -0.10% -$10,388.72
Subcontractor Percentage Amount
KNIFE RIVER CORPORATION - SOUTH 39.81% $3,722,822.74
DUSTROL, INC. 4.98% $465,703.52
COWBOY TRUCKING 3.48% $325,431.38
TRAFFIC HIGHWAY MAINTENANCE, LLC 2.48% $231,916.61
NELSON INDUSTRIAL SERVICES, INC. 0.13% $12,156.92
Total: 50.88% $4,758,031.17

Bid Items & Bid Tabulations

47 Total 0 of 47
MCLENNAN  |  US 84  |  WACO  |  0055-15-079  |  09/05/2024  |  $8,243,561.94  |  F 2B24(523)  |  REHAB EXIST ROADWAY  |  135 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SILVER CREEK CONSTRUCTION, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
REMOV CONC (CURB)
LF 2,000.000 $45.000 $20.000 $40.000 $33.000 $10.000
TOM-C PG76-22 SAC-A
TON 10,591.000 $188.660 $183.000 $180.000 $168.650 $220.000
TOM-F PG76-28 SAC-B
TON 5,296.000 $131.400 $203.000 $180.000 $187.850 $265.000
TACK COAT
GAL 57,774.000 $7.090 $4.400 $4.000 $4.150 $3.000
PLANE ASPH CONC PAV(0" TO 1" MICRO)
SY 5,269.000 $3.000 $4.500 $10.000 $7.850 $10.300
PLANE CONC PAV(0" TO 0.5")
SY 203,434.000 $6.480 $4.500 $5.000 $4.100 $4.000
FULL - DEPTH REPAIR CRCP (9")
CY 1,883.000 $750.000 $820.000 $1,500.000 $1,230.000 $1,075.000
CEM STABIL BKFL
CY 20.000 $255.000 $400.000 $300.000 $200.000 $350.000
CL C CONC (RAIL FOUNDATION)
CY 27.000 $318.800 $1,200.000 $1,300.000 $1,090.000 $1,800.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 412.000 $155.000 $155.000 $200.000 $141.000 $130.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 112.000 $50.000 $50.000 $40.000 $58.850 $68.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 1,782.000 $50.000 $22.000 $50.000 $67.000 $56.000
CLEANING EXISTING JOINTS
LF 198.000 $20.000 $5.000 $20.000 $29.400 $24.000
MULTI-LAYER POLYMER OVERLAY
SY 5,269.000 $49.000 $35.000 $70.000 $47.000 $45.000
RAIL (TY C402)
LF 190.000 $206.000 $300.000 $300.000 $335.000 $280.000
ADJUSTING MANHOLES
EA 41.000 $1,500.000 $2,000.000 $2,700.000 $4,865.000 $1,800.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 50.000 $1,500.000 $1,500.000 $1,700.000 $2,955.000 $1,800.000
SHOT BLASTING
SY 5,269.000 $7.000 $5.000 $6.000 $4.100 $4.000
MOBILIZATION
LS 1.000 $742,187.000 $850,000.000 $1,012,500.000 $998,375.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $6,500.000 $16,500.000 $7,000.000 $10,500.000 $2,600.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $171.430 $250.000 $100.000 $295.000 $76.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $17,500.000 $15,000.000 $3,000.000 $20,000.000
TMA (STATIONARY)
DAY 180.000 $150.000 $250.000 $275.000 $615.000 $270.630
TMA (MOBILE OPERATION)
HR 720.000 $50.000 $65.000 $90.000 $95.000 $40.000
CONC CURB (TY II)
LF 2,000.000 $35.000 $15.000 $80.000 $33.000 $40.000
INTERSECTIONS (ACP)
SY 10,858.000 $15.230 $42.000 $40.000 $35.500 $40.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 15,600.000 $0.880 $0.600 $0.400 $1.180 $0.350
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 25,660.000 $0.660 $0.450 $0.400 $1.180 $0.320
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 10,105.000 $0.940 $2.000 $0.400 $1.180 $0.400
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 160.000 $0.670 $3.000 $0.400 $1.180 $0.320
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,186.000 $1.600 $4.000 $1.500 $1.390 $1.310
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 16.000 $1.620 $4.000 $5.000 $1.400 $1.310
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 162.000 $2.190 $3.000 $1.350 $5.880 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,105.000 $1.600 $1.500 $0.950 $1.350 $0.850
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,710.000 $9.940 $12.000 $7.000 $7.650 $6.900
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 15,600.000 $0.880 $1.200 $0.700 $1.180 $0.620
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 25,660.000 $1.010 $1.000 $0.700 $1.180 $0.600
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 160.000 $0.950 $3.000 $0.700 $5.880 $0.600
PREFAB PM TY C (W)(ARROW)
EA 94.000 $189.420 $330.000 $250.000 $247.000 $220.000
PREFAB PM TY C (W)(WORD)
EA 94.000 $213.400 $500.000 $300.000 $277.000 $280.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 23.000 $70.390 $90.000 $55.000 $88.000 $50.000
REFL PAV MRKR TY I-A
EA 501.000 $6.400 $8.000 $4.500 $7.000 $4.000
REFL PAV MRKR TY II-C-R
EA 197.000 $6.030 $8.000 $4.500 $7.000 $4.000
JT CLEANING AND SEALING(TRANS CNTR JTS)
LF 35,250.000 $2.050 $3.750 $3.500 $30.600 $26.000
CRACK CLEANING AND SEALING (JCP)
LF 2,600.000 $39.630 $7.000 $10.000 $28.250 $24.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 500.000 $296.290 $315.000 $185.000 $208.850 $180.000
BENT CAP/ABUTMENT CAP CLEANING
EA 2.000 $1,700.000 $2,000.000 $6,500.000 $6,120.000 $2,500.000
Totals: $8,243,561.940 $8,584,310.100 $10,190,652.450 $10,411,607.050 $10,421,995.770