Show Job Controls
Bid Cobra

MAVERICK US 57 (0276-01-044)

Items: 88

County: MAVERICK
Length: 0.0000 MILES
Highway: US 57
District: LAREDO
Control Number: 0276-01-044
DBE Goal: 0.0%
Project: F 2026(846)
Guaranty: $100,000.00
Time: 235 WORKING DAYS
Engineer's Estimate: $11,559,333.07
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263207
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00189724
Contract Type: Federal
Project Description: REHABILITATION OF EXISTING MULTI-LANE ROADWAY CONSISTING OF GEOGRID, FLEXBASE, HMA SP TYB AND TYC, SMA TY C, MBGF, & PAVEMENT MARKING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
MAVERICK US 57 (0276-01-044)
Project Name: N/A
Project: F 2026(846)
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: US 277
Limits To: 1.179 MILES SOUTH OF SL 480
Project Description: REHABILITATION OF EXISTING MULTI-LANE ROADWAY CONSISTING OF GEOGRID, FLEXBASE, HMA SP TYB AND TYC, SMA TY C, MBGF, & PAVEMENT MARKING
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

88 Total 0 of 88
MAVERICK  |  US 57  |  LAREDO  |  0276-01-044  |  1:00 PM AUGUST 06, 2026  |  $11,559,333.07  |  F 2026(846)  |  REHAB EXIST ROADWAY  |  235 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 82.000
REMOV CONC (DRIVEWAYS)
SY 923.000
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
SY 65,243.000
EXCAV (ROADWAY)
CY 19,546.000
EMBANK (FNL)(OC)(TY A)
CY 1,356.000
DRILL SEED (PERM_RURAL_CLAY)
AC 9.400
DRILL SEED (TEMP_WARM)
AC 9.400
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 30,171.000
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 65,243.000
PRIME COAT (MC-30)
GAL 13,049.000
SP MIXES SP-B SAC-B PG70-22
TON 15,659.000
SP MIXES SP-C SAC-B PG70-22
TON 11,255.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 10,346.000
FLEXIBLEPAVEMENTSTRUCTUREREPAIR(10.5")
SY 2,209.000
PLANE ASPH CONC PAV (2.5")
SY 3,888.000
FLOWABLE BACKFILL
CY 154.000
RIPRAP (MOW STRIP)(4 IN)
CY 60.000
CONC BOX CULV (5 FT X 2 FT)
LF 6.000
RC PIPE (CL III)(36 IN)
LF 270.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1)(C)
EA 4.000
CLEAN EXIST CULVERTS
EA 6.000
REMOV STR (SET)
EA 4.000
REMOV STR (HEADWALL)
EA 2.000
REMOV STR (PIPE)
LF 180.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000
TMA (STATIONARY)
DAY 62.000
TMA (MOBILE OPERATION)
DAY 15.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 129.000
ROCK FILTER DAMS (REMOVE)
LF 129.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 223.000
CONSTRUCTION EXITS (REMOVE)
SY 223.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 35.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,374.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,374.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 6,810.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 6,270.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 6,810.000
DRIVEWAYS (CONC)
SY 923.000
DRIVEWAYS (BASE)
SY 1,347.000
DRIVEWAYS (SURF TREAT)
SY 363.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,025.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000
REMOVE METAL BEAM GUARD FENCE
LF 1,025.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 17.000
CRASH CUSH ATTEN (REMOVE)
EA 23.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 23.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 6.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 5.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000
RELOCATE EXISTING MAILBOX
EA 17.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 28.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 30.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 28.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 70.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 8,158.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 8,164.000
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,964.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,140.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 30.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 7.000
PAVEMENT SLER 6"
LF 45,058.000
PAVEMENT SLER 8"
LF 1,140.000
PAVEMENT SLER 24"
LF 30.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 5,808.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 16,358.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 4,250.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 18,000.000
REFL PAV MRKR TY II-A-A
EA 1,700.000
TRAFFIC BUTTON TY W
EA 1,630.000
TRAFFIC BUTTON TY Y
EA 1,630.000
ELIM EXT PM & MRKS (4")
LF 35,100.000
ELIM EXT PM & MRKS (8")
LF 830.000
ELIM EXT PM & MRKS (24")
LF 65.000
ELIM EXT PM & MRKS (ARROW)
EA 6.000
ELIM EXT PM & MRKS (WORD)
EA 4.000
TEMP TRAF SIGNALS
EA 1.000
BONDING COURSE
GAL 24,644.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $486,874.38
Total: $537,874.38