MADISON SH 21 (0117-05-059)

Items: 52

County: MADISON
Length: N/A
Highway: SH 21
District: BRYAN
Control Number: 0117-05-059
DBE Goal: 300.0%
Project: STP 2B24(386)HES
Guaranty: N/A
Time: 41 WORKING DAYS
Engineer's Estimate: $802,039.63
Date: 08/01/2024 (1 year ago)
Contract Number: N/A
Type: CONSTRUCT TWO-WAY LEFT TURN LANE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$802,039.63
$938,332.30
Over/Under Est: 16.99% $136,292.67
Over/Under Est: 17.22% $138,072.68
Amt Left: 0.19% $1,780.01
Over/Under Est: 26.27% $210,732.27
Amt Left: 7.93% $74,439.60
Delta: -7.73% -$72,659.59
Over/Under Est: 29.33% $235,276.37
Amt Left: 10.55% $98,983.70
Delta: -2.42% -$24,544.10
Subcontractor Percentage Amount
MEMCO STAFFING, LLC 9.32% $89,952.88
MURRAY CONSTRUCTION 5.00% $48,257.98
HIGHWAY 1 LLC 4.57% $44,107.80
AWP SAFETY 1.24% $11,967.98
CEN TEX HYDROSEED, INC. 0.96% $9,265.53
Total: 21.09% $203,552.17

Bid Items & Bid Tabulations

52 Total 0 of 52
MADISON  |  SH 21  |  BRYAN  |  0117-05-059  |  08/01/2024  |  $802,039.63  |  STP 2B24(386)HES  |  CONSTRUCT TWO-WAY LEFT TURN LANE  |  41 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LARRY YOUNG PAVING, INC.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
EXCAVATION (ROADWAY)
CY 267.000 $16.000 $30.000 $24.350 $50.000 $75.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 68.000 $25.000 $48.000 $132.000 $100.000 $75.000
BACKFILL (TY A OR B)
STA 45.300 $245.800 $300.000 $448.000 $600.000 $350.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,720.000 $1.600 $3.500 $3.400 $4.000 $2.500
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,720.000 $0.350 $1.250 $1.150 $1.000 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 860.000 $0.300 $1.250 $1.150 $1.000 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 860.000 $0.300 $1.250 $1.150 $1.000 $1.000
FERTILIZER
AC 0.360 $800.000 $630.000 $568.000 $500.000 $500.000
VEGETATIVE WATERING
MG 20.000 $15.000 $25.000 $94.000 $71.000 $25.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
SY 1,016.000 $50.000 $34.000 $30.000 $50.000 $40.000
PRIME COAT (MC-30 OR EC-30)
GAL 254.000 $7.500 $8.750 $17.000 $18.000 $7.000
PLANE ASPH CONC PAV(0" TO 2")
SY 448.000 $4.000 $12.000 $22.700 $23.000 $6.000
MOBILIZATION
LS 1.000 $75,000.000 $95,000.000 $98,600.000 $98,500.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $6,000.000 $11,000.000 $15,400.000 $4,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $42.000 $48.000 $43.000 $40.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $12.000 $13.000 $11.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 325.000 $4.000 $5.750 $5.100 $4.500 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 325.000 $1.050 $1.250 $1.200 $1.000 $1.000
DRIVEWAYS (ACP)
SY 27.000 $70.000 $58.000 $191.000 $135.000 $125.000
ALUMINUM SIGNS (TY A)
SF 32.000 $35.000 $57.000 $51.000 $48.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 42.000 $700.000 $840.000 $753.000 $680.000 $675.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $600.000 $950.000 $1,021.000 $800.000 $775.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 10.000 $900.000 $1,000.000 $1,181.000 $850.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,400.000 $1,100.000 $1,395.000 $900.000 $900.000
REMOVE SM RD SN SUP&AM
EA 61.000 $115.000 $130.000 $148.000 $130.000 $110.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 7.000 $50.000 $160.000 $142.000 $135.000 $150.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 430.000 $1.250 $1.250 $2.000 $1.500 $1.500
REFL PAV MRK TY I (W)8"(BRK)(090MIL)
LF 202.000 $1.350 $3.250 $2.840 $2.700 $2.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,160.000 $1.350 $2.500 $2.270 $2.000 $1.500
REF PROF PAV MRK TY I(W)6"(SLD)(060MIL)
LF 8,856.000 $0.790 $1.750 $1.650 $1.500 $2.750
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 10,716.000 $0.700 $1.750 $1.650 $1.500 $2.750
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
LF 1,010.000 $1.000 $1.750 $1.650 $1.500 $3.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 900.000 $0.700 $2.750 $2.560 $2.300 $2.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 18.000 $18.000 $35.000 $31.500 $29.000 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 13.000 $235.000 $390.000 $351.000 $320.000 $215.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $290.000 $480.000 $428.000 $390.000 $255.000
REFL PAV MRKR TY I-C
EA 86.000 $3.500 $8.250 $7.400 $7.000 $6.000
REFL PAV MRKR TY II-A-A
EA 402.000 $4.500 $7.500 $6.800 $6.500 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 18.000 $3.250 $4.750 $4.300 $4.000 $5.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 8.000 $270.000 $530.000 $127.000 $530.000 $250.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $9,000.000 $6,400.000 $20,453.000 $6,500.000 $20,000.000
REPLACE OF SIGNAL HEAD ASSM
EA 3.000 $300.000 $360.000 $5,343.000 $360.000 $5,500.000
REPLACE OF LUMINAIRE HEAD
EA 2.000 $1,000.000 $360.000 $1,700.000 $360.000 $2,000.000
SP MIXES SP-B PG64-22
TON 416.000 $120.000 $140.000 $151.250 $170.000 $150.000
SP MIXES SP-C PG70-22
TON 144.000 $150.000 $210.000 $211.450 $260.000 $175.000
TACK COAT
GAL 217.000 $6.000 $7.000 $4.500 $5.000 $7.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 2,437.000 $170.000 $180.000 $142.500 $200.000 $200.000
TACK COAT
GAL 2,215.000 $3.500 $6.500 $4.500 $5.000 $7.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 116.000 $100.000 $58.000 $125.000 $125.000 $125.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 176.000 $6.000 $32.000 $26.000 $25.000 $25.000
TMA (STATIONARY)
DAY 47.000 $250.000 $250.000 $590.000 $330.000 $300.000
TMA (MOBILE OPERATION)
DAY 22.000 $300.000 $1,000.000 $900.000 $400.000 $500.000
Totals: $802,039.630 $938,332.300 $940,112.310 $1,012,771.900 $1,037,316.000