LUBBOCK CS (0905-06-095)

Items: 187

County: LUBBOCK
Length: N/A
Highway: CS
District: LUBBOCK
Control Number: 0905-06-095
DBE Goal: 750.0%
Project: STP 2019(518)MM
Guaranty: N/A
Time: 304 WORKING DAYS
Engineer's Estimate: $17,487,978.35
Date: 02/02/2024 (2 years ago) Changed
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
JOE VILLALOBOS
MICHAEL BOYD1
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$17,487,978.35
$19,074,046.67
Over/Under Est: 9.07% $1,586,068.32
$21,571,088.00
Over/Under Est: 23.35% $4,083,109.65
Amt Left: 13.09% $2,497,041.33
Over/Under Est: 62.29% $10,893,193.65
Amt Left: 48.79% $9,307,125.33
Delta: -31.57% -$6,810,084.00
Subcontractor Percentage Amount
ARTEX ELECTRIC, INC. 5.59% $1,074,112.20
ALAMO BROTHERS CONCRETE INC 2.02% $388,140.72
TRP CONSTRUCTION GROUP, LLC 1.51% $290,144.80
LMN TRANSPORT 1.23% $236,343.11
TORO BRAVO CONSTRUCTION, LLC 0.84% $161,405.05
FIBERTEX, LLC 0.27% $51,880.20
BUILDER'S ENVIRONMENTAL SERVICES, LLC 0.25% $48,037.22
SOUTHEAST GRINDING AND GROOVING LLC 0.23% $44,194.24
FC TRAFFIC CONTROL, INC. 0.20% $38,429.77
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.08% $15,371.91
LIBERTY OILFIELD REPAIR & SERVICE, INC. 0.03% $5,764.47
BROWN-MCKEE, INC. 0.03% $5,764.47
THUNDER PUMP SERVICE, LLC 0.00% $0.00
Total: 12.28% $2,359,588.16

Bid Items & Bid Tabulations

187 Total 0 of 187
LUBBOCK  |  CS  |  LUBBOCK  |  0905-06-095  |  02/02/2024  |  $17,487,978.35  |  STP 2019(518)MM  |  WIDEN ROAD - ADD LANES  |  304 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR DIRT & PAVING, LTD.
WEBBER, LLC
SACYR CONSTRUCTION USA LLC
PREPARING ROW
STA 65.000 $10,000.000 $19,000.000 $33,186.000 $34,500.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 25.000 $1,600.000 $1,000.000 $1,105.000 $1,000.000
REMOVING CONC (PAV)
SY 1,300.000 $100.000 $50.000 $30.000 $56.000
REMOVING CONC (DRIVEWAYS)
SY 1,405.000 $30.000 $50.000 $28.000 $16.000
REMOVING CONC (CURB AND GUTTER)
LF 199.000 $14.000 $50.000 $14.000 $29.000
REMOVING CONC (FLUME)
SY 78.000 $35.000 $50.000 $43.000 $74.000
EXCAVATION (ROADWAY)
CY 14,375.790 $12.000 $18.000 $20.000 $34.000
EXCAVATION (SPECIAL)
CY 14.000 $30.000 $18.000 $92.250 $82.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 8,245.000 $15.000 $20.000 $42.000 $119.000
FURNISHING AND PLACING TOPSOIL (4")
SY 10,010.000 $4.500 $5.000 $3.000 $3.000
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
SY 10,010.000 $0.900 $1.000 $1.000 $4.000
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 10,010.000 $1.180 $2.000 $1.000 $1.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 5,005.000 $0.150 $2.000 $1.000 $1.000
FERTILIZER
TON 0.640 $1,500.000 $4,000.000 $3,712.000 $13,624.000
VEGETATIVE WATERING
MG 200.000 $70.000 $150.000 $11.000 $78.000
PROOF ROLLING
HR 35.000 $150.000 $150.000 $100.000 $400.000
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 39,618.000 $20.000 $0.000 $0.000 $0.000
CEMENT
TON 185.000 $280.000 $0.000 $0.000 $0.000
CEMENT TREAT(EXIST MATL)(8")
SY 18,540.000 $10.000 $0.000 $0.000 $0.000
PRIME COAT (MC-30)
GAL 13,678.000 $7.000 $15.000 $16.000 $11.000
FOG SEAL (CSS-1H)
GAL 15,331.000 $8.000 $6.000 $9.000 $19.000
ASPH (AC-20-5TR)
GAL 852.000 $9.000 $20.000 $8.000 $19.000
AGGR(TY-PB GR-4 SAC-B)
CY 20.000 $320.000 $400.000 $275.000 $757.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 5,000.000 $75.000 $75.000 $73.000 $50.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 5,000.000 $50.000 $50.000 $66.000 $70.000
PLANE ASHP CONC PAV (2" TO 9")
SY 20,455.000 $5.000 $20.000 $4.000 $9.000
CONC PVMT (CONT REINF - CRCP) (9")
SY 16,109.000 $116.000 $0.000 $0.000 $0.000
STRUCT EXCAV (BOX)
CY 1,176.000 $12.000 $30.000 $4.000 $74.000
STRUCT EXCAV (PIPE)
CY 564.000 $12.000 $25.000 $9.000 $64.000
CEM STABIL BKFL
CY 904.000 $200.000 $125.000 $200.000 $319.000
TRENCH EXCAVATION PROTECTION
LF 35.000 $50.000 $50.000 $5.000 $87.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 1,320.000 $36.000 $50.000 $65.000 $87.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 234.000 $300.000 $240.000 $203.000 $381.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 66.000 $350.000 $210.000 $178.000 $333.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 101.000 $450.000 $450.000 $381.000 $715.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $550.000 $570.000 $482.000 $905.000
RIPRAP (CONC)(5 IN)
CY 1,284.000 $700.000 $600.000 $620.000 $1,000.000
RIPRAP (CONC)(FLUME)
CY 12.000 $850.000 $900.000 $840.000 $2,011.000
RAIL (HANDRAIL)(TY F)
LF 187.000 $200.000 $300.000 $149.000 $471.000
CONC BOX CULV (6 FT X 3 FT)
LF 585.000 $700.000 $700.000 $950.000 $1,052.000
RC PIPE (CL IV)(18 IN)
LF 128.000 $125.000 $128.000 $100.000 $183.000
RC PIPE (CL IV)(24 IN)
LF 864.000 $180.000 $200.000 $120.000 $222.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $22,000.000 $19,000.000 $16,000.000 $26,884.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
EA 9.000 $15,000.000 $22,000.000 $17,000.000 $27,349.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $3,500.000 $2,500.000 $3,500.000 $3,399.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 32.000 $3,000.000 $3,500.000 $3,800.000 $4,637.000
CAST-IN-PLACE TRENCH DRAIN
LF 116.000 $500.000 $750.000 $450.000 $1,131.000
CLEAN EXIST CULVERTS
EA 2.000 $3,000.000 $3,000.000 $8,000.000 $4,907.000
REMOV STR (PIPE)
EA 22.000 $750.000 $3,000.000 $2,300.000 $52.000
REMOV STR (SMALL FENCE)
LF 2,448.000 $3.000 $17.000 $11.000 $8.000
MOBILIZATION
LS 1.000 $1,589,000.000 $1,800,000.000 $2,157,100.000 $2,825,428.780
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $15,000.000 $30,000.000 $134,898.000 $8,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 178.000 $50.000 $50.000 $55.000 $69.000
ROCK FILTER DAMS (REMOVE)
LF 89.000 $12.000 $50.000 $20.000 $23.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 672.000 $20.000 $35.000 $45.000 $53.000
CONSTRUCTION EXITS (REMOVE)
SY 336.000 $9.010 $15.000 $14.000 $19.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 125.000 $2.500 $12.000 $8.000 $15.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 63.000 $2.000 $3.000 $2.000 $15.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 5,042.000 $10.000 $8.000 $16.000 $13.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,521.000 $2.000 $5.000 $1.000 $6.000
CONSTRUCTING DETOURS
SY 7,030.000 $85.000 $120.000 $125.000 $200.000
CONC CURB & GUTTER (TY II)
LF 5,990.000 $48.000 $40.000 $20.000 $75.000
CONC CURB & GUTTER (SLOTTED)
LF 3,256.000 $70.000 $100.000 $24.000 $88.000
DRIVEWAYS (CONC)
SY 2,309.000 $150.000 $95.000 $125.000 $226.000
CONC SIDEWALKS (4")
SY 5,128.000 $90.000 $80.000 $100.000 $150.000
CURB RAMPS (TY 2)
SY 175.000 $150.000 $80.000 $320.000 $264.000
CURB RAMPS (TY 7)
SY 214.000 $150.000 $80.000 $320.000 $264.000
CURB RAMPS (TY 10)
SY 206.000 $150.000 $145.000 $320.000 $264.000
CURB RAMPS (TY 22)
SY 30.000 $150.000 $80.000 $320.000 $302.000
CONC MEDIAN
SY 278.000 $200.000 $95.000 $300.000 $264.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $320.000 $7,500.000 $406.000 $953.000
CHAIN LINK FENCE (INSTALL) (6')
LF 598.000 $55.000 $45.000 $51.000 $76.000
CHAIN LINK FENCE (REMOVE)
LF 708.000 $19.650 $15.000 $8.000 $11.000
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
LF 400.000 $30.000 $75.000 $61.000 $105.000
REMOVE AND INSTALL EXISTING GATE
EA 10.000 $550.000 $4,500.000 $2,600.000 $3,811.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 14.000 $372.400 $600.000 $406.000 $1,300.000
IN RD IL (TY SA) 30T-8 (250W EQ) LED
EA 3.000 $6,000.000 $4,200.000 $3,600.000 $6,669.000
IN RD IL (TY AL) 50S-12 (400W EQ) LED
EA 21.000 $6,000.000 $5,340.000 $4,600.000 $8,479.000
CONDT (PVC) (SCH 40) (2")
LF 7,670.000 $14.000 $9.300 $8.000 $15.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,310.000 $30.000 $21.600 $19.000 $34.000
CONDT (PVC) (SCH 80) (2")
LF 120.000 $20.000 $10.800 $10.000 $17.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 435.000 $20.000 $24.000 $21.000 $38.000
CONDT (PVC) (SCH 80) (3")
LF 415.000 $30.000 $16.800 $15.000 $27.000
CONDT (PVC) (SCH 80) (4")
LF 70.000 $35.000 $19.200 $17.000 $30.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,115.000 $50.000 $33.000 $28.000 $52.000
ELEC CONDR (NO.12) INSULATED
LF 160.000 $2.000 $1.500 $2.000 $2.000
ELEC CONDR (NO.8) BARE
LF 5,060.000 $2.000 $1.800 $2.000 $3.000
ELEC CONDR (NO.8) INSULATED
LF 10,590.000 $2.500 $2.000 $2.000 $3.000
ELEC CONDR (NO.6) BARE
LF 2,145.000 $2.500 $2.000 $2.000 $3.000
ELEC CONDR (NO.6) INSULATED
LF 680.000 $3.000 $2.400 $2.000 $4.000
GROUND BOX TY A (122311)W/APRON
EA 5.000 $1,800.000 $900.000 $920.000 $1,429.000
GROUND BOX TY C (162911)W/APRON
EA 18.000 $1,500.000 $1,080.000 $920.000 $1,715.000
ELC SRV TY A 240/480 060(NS)AL(E)PS(U)
EA 2.000 $9,000.000 $7,800.000 $6,600.000 $12,385.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(U)
EA 4.000 $9,350.000 $7,200.000 $6,600.000 $11,433.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 6.000 $1,000.000 $1,500.000 $800.000 $1,633.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $1,200.000 $1,500.000 $800.000 $1,711.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 14.000 $1,000.000 $1,000.000 $1,600.000 $2,589.000
REMOVE SM RD SN SUP&AM
EA 15.000 $100.000 $1,000.000 $158.000 $476.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 2,579.000 $4.250 $4.800 $2.200 $8.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 6,091.000 $4.500 $4.800 $2.200 $8.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 3,869.000 $5.500 $3.600 $2.200 $6.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 9,136.000 $5.000 $3.600 $2.200 $6.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 440.000 $25.000 $14.400 $6.100 $24.000
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 1,675.000 $1.500 $2.400 $1.300 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,372.000 $1.500 $2.400 $1.300 $4.000
PAVEMENT SEALER 4"
LF 17,917.000 $1.200 $0.400 $0.400 $1.000
PAVEMENT SEALER 8"
LF 12,924.000 $2.500 $0.400 $0.400 $1.000
PAVEMENT SEALER 12"
LF 680.000 $1.320 $4.800 $0.800 $8.000
PAVEMENT SEALER 24"
LF 1,695.000 $3.320 $6.000 $0.900 $10.000
PAVEMENT SEALER (RR XING)
EA 4.000 $300.000 $330.000 $6.000 $544.000
PAVEMENT SEALER (YLD TRI)
EA 28.000 $10.000 $18.000 $5.000 $30.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,461.000 $2.000 $1.200 $0.700 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,103.000 $0.900 $1.200 $0.700 $2.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,847.000 $0.750 $1.200 $0.700 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,484.000 $0.900 $1.200 $0.700 $2.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 680.000 $30.000 $21.600 $20.000 $36.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 1,695.000 $35.000 $43.200 $38.000 $71.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 27.000 $354.770 $840.000 $507.000 $1,384.000
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 3.000 $400.000 $1,260.000 $862.000 $2,077.000
PREFAB PAV MRK TY B (W)(RR XING)
EA 4.000 $600.000 $2,520.000 $2,281.000 $4,153.000
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
EA 28.000 $210.000 $120.000 $178.000 $198.000
REFL PAV MRKR TY I-C
EA 138.000 $5.000 $9.000 $5.000 $15.000
REFL PAV MRKR TY II-A-A
EA 320.000 $6.500 $9.000 $5.000 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,030.000 $3.000 $2.400 $0.500 $4.000
ELIM EXT PAV MRK & MRKS (8")
LF 50.000 $3.000 $2.400 $0.700 $4.000
ELIM EXT PAV MRK & MRKS (24")
LF 335.000 $5.000 $6.000 $0.700 $10.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 3.000 $180.000 $300.000 $127.000 $494.000
PAV SURF PREP FOR MRK (4")
LF 17,895.000 $1.500 $0.450 $0.100 $1.000
PAV SURF PREP FOR MRK (8")
LF 6,462.000 $2.000 $0.450 $0.100 $1.000
PAV SURF PREP FOR MRK (24")
LF 1,695.000 $2.500 $4.200 $0.500 $7.000
PAV SURF PREP FOR MRK (ARROW)
EA 26.000 $60.000 $174.000 $18.000 $287.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 3.000 $70.000 $360.000 $21.000 $593.000
INSTALL HWY TRF SIG (UPGRADE)
EA 4.000 $15,000.000 $17,980.000 $26,000.000 $19,054.000
VEH SIG SEC (12")LED(GRN)
EA 27.000 $305.000 $375.000 $300.000 $524.000
VEH SIG SEC (12")LED(GRN ARW)
EA 18.000 $310.000 $375.000 $300.000 $524.000
VEH SIG SEC (12")LED(YEL)
EA 33.000 $305.000 $375.000 $300.000 $524.000
VEH SIG SEC (12")LED(YEL ARW)
EA 25.000 $310.000 $375.000 $300.000 $524.000
VEH SIG SEC (12")LED(RED)
EA 39.000 $305.000 $375.000 $300.000 $524.000
VEH SIG SEC (12")LED(RED ARW)
EA 11.000 $315.000 $375.000 $300.000 $524.000
PED SIG SEC (LED)(COUNTDOWN)
EA 17.000 $970.000 $880.000 $815.000 $1,524.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 30.000 $150.000 $207.000 $305.000 $524.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 7.000 $170.000 $277.000 $305.000 $543.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 7.000 $180.000 $275.000 $305.000 $572.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,450.000 $3.000 $3.500 $5.000 $9.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 585.000 $4.500 $4.000 $6.000 $10.000
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 1,425.000 $7.000 $6.200 $7.000 $11.000
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 1,590.000 $9.000 $8.000 $8.000 $14.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,485.000 $2.750 $2.800 $4.000 $7.000
INS TRF SIG PL AM (S)1 ARM(28')
EA 1.000 $14,000.000 $10,120.000 $14,192.000 $26,676.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 2.000 $15,000.000 $13,029.000 $14,700.000 $27,629.000
INS TRF SIG PL AM(S)1 ARM(44')
EA 2.000 $16,000.000 $15,216.000 $16,800.000 $31,440.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 2.000 $17,800.000 $17,370.000 $18,800.000 $35,251.000
INS TRF SIG PL AM(S)1 ARM(50')
EA 1.000 $40,000.000 $31,685.000 $33,000.000 $61,927.000
INS TRF SIG PL AM(S)1 ARM(60')
EA 3.000 $41,000.000 $31,584.000 $34,500.000 $64,785.000
PED POLE ASSEMBLY
EA 10.000 $3,800.000 $3,015.500 $1,800.000 $3,335.000
PEDESTRIAN PUSH BUTTON POLE
EA 10.000 $2,000.000 $2,691.000 $1,800.000 $3,335.000
REMOVAL OF TIMBER POLES
EA 10.000 $550.000 $443.000 $470.000 $1,905.000
INSTALL OF TIMBER POLES
EA 10.000 $100.000 $1,084.000 $1,170.000 $4,764.000
FULL - WIDTH MOWING
CYC 2.000 $12,600.000 $5,000.000 $5,000.000 $1,905.000
LITTER REMOVAL
CYC 2.000 $6,841.480 $2,000.000 $2,600.000 $4,764.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 33,722.000 $23.000 $0.000 $0.000 $0.000
ASPH FOR REINF FAB (PG76-28)
GAL 5,362.000 $20.230 $0.000 $0.000 $0.000
D-GR HMA TY-D SAC-A PG76-28
TON 1,045.000 $240.000 $0.000 $0.000 $0.000
SP MIXES SP-C SAC-A PG76-28
TON 7,756.000 $240.000 $0.000 $0.000 $0.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 3,878.000 $300.000 $0.000 $0.000 $0.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $500.000 $2,000.000 $722.000 $1,905.000
SPLIT RAIL FENCE (INSTALL)
LF 238.000 $6.420 $40.000 $85.000 $238.000
REMOVE AND RELOCATE STEEL FENCE
LF 1,022.000 $100.000 $75.000 $75.000 $95.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,350.000 $50.000 $100.000 $40.000 $157.000
GROUND BOX (PREPARE)
EA 3.000 $1,900.000 $640.000 $507.000 $953.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 22.000 $3.000 $2.300 $26.000 $49.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 415.000 $3.000 $3.200 $51.000 $99.000
TMA (STATIONARY)
DAY 660.000 $200.000 $250.000 $265.000 $866.000
TMA (MOBILE OPERATION)
DAY 8.000 $475.000 $500.000 $790.000 $953.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 2.000 $3,800.000 $7,200.000 $6,083.000 $11,433.000
VIVDS PROSR SYS
EA 2.000 $11,000.000 $16,800.000 $14,192.000 $26,676.000
VIVDS CAM ASSY FXD LNS
EA 8.000 $1,000.000 $3,000.000 $2,535.000 $4,764.000
VIVDS CABLING
LF 1,590.000 $3.000 $3.000 $3.000 $5.000
TEMP SPEED MONITOR SYS
EA 1.000 $16,500.000 $17,000.000 $17,441.320 $47,636.000
HIGH PRESSURE WATER BLASTING SYSTEM 4"
LF 2,500.000 $2.500 $4.800 $6.000 $3.000
1
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 8,297.000 $20.000 $42.000 $33.000 $62.000
1
CEMENT
TON 558.000 $280.000 $350.000 $264.000 $437.000
1
CEMENT TREAT(EXIST MATL)(8")
SY 48,810.000 $10.000 $7.500 $6.000 $11.000
1
CONC PVMT (CONT REINF - CRCP) (9")
SY 42,289.000 $116.000 $112.000 $117.500 $150.000
1
D-GR HMA TY-D SAC-A PG76-28
TON 2,704.000 $240.000 $250.000 $254.000 $306.000
1
SP MIXES SP-C SAC-A PG76-28
TON 1,777.000 $240.000 $250.000 $218.000 $299.000
1
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 889.000 $300.000 $250.000 $182.000 $328.000
Totals: $24,545,901.610 $19,074,046.670 $21,571,088.000 $28,381,172.000