PREPARING ROW
|
STA
|
65.000
|
$10,000.000
|
$19,000.000
|
$33,186.000
|
$34,500.000
|
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
25.000
|
$1,600.000
|
$1,000.000
|
$1,105.000
|
$1,000.000
|
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,300.000
|
$100.000
|
$50.000
|
$30.000
|
$56.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,405.000
|
$30.000
|
$50.000
|
$28.000
|
$16.000
|
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
199.000
|
$14.000
|
$50.000
|
$14.000
|
$29.000
|
|
|
|
REMOVING CONC (FLUME)
|
SY
|
78.000
|
$35.000
|
$50.000
|
$43.000
|
$74.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
14,375.790
|
$12.000
|
$18.000
|
$20.000
|
$34.000
|
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
14.000
|
$30.000
|
$18.000
|
$92.250
|
$82.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
8,245.000
|
$15.000
|
$20.000
|
$42.000
|
$119.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
10,010.000
|
$4.500
|
$5.000
|
$3.000
|
$3.000
|
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
|
SY
|
10,010.000
|
$0.900
|
$1.000
|
$1.000
|
$4.000
|
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
10,010.000
|
$1.180
|
$2.000
|
$1.000
|
$1.000
|
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
5,005.000
|
$0.150
|
$2.000
|
$1.000
|
$1.000
|
|
|
|
FERTILIZER
|
TON
|
0.640
|
$1,500.000
|
$4,000.000
|
$3,712.000
|
$13,624.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
200.000
|
$70.000
|
$150.000
|
$11.000
|
$78.000
|
|
|
|
PROOF ROLLING
|
HR
|
35.000
|
$150.000
|
$150.000
|
$100.000
|
$400.000
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(12")
|
SY
|
39,618.000
|
$20.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CEMENT
|
TON
|
185.000
|
$280.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
18,540.000
|
$10.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
13,678.000
|
$7.000
|
$15.000
|
$16.000
|
$11.000
|
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
15,331.000
|
$8.000
|
$6.000
|
$9.000
|
$19.000
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
852.000
|
$9.000
|
$20.000
|
$8.000
|
$19.000
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
20.000
|
$320.000
|
$400.000
|
$275.000
|
$757.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
5,000.000
|
$75.000
|
$75.000
|
$73.000
|
$50.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
5,000.000
|
$50.000
|
$50.000
|
$66.000
|
$70.000
|
|
|
|
PLANE ASHP CONC PAV (2" TO 9")
|
SY
|
20,455.000
|
$5.000
|
$20.000
|
$4.000
|
$9.000
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
16,109.000
|
$116.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
1,176.000
|
$12.000
|
$30.000
|
$4.000
|
$74.000
|
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
564.000
|
$12.000
|
$25.000
|
$9.000
|
$64.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
904.000
|
$200.000
|
$125.000
|
$200.000
|
$319.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
35.000
|
$50.000
|
$50.000
|
$5.000
|
$87.000
|
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
1,320.000
|
$36.000
|
$50.000
|
$65.000
|
$87.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
234.000
|
$300.000
|
$240.000
|
$203.000
|
$381.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
66.000
|
$350.000
|
$210.000
|
$178.000
|
$333.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
101.000
|
$450.000
|
$450.000
|
$381.000
|
$715.000
|
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$550.000
|
$570.000
|
$482.000
|
$905.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,284.000
|
$700.000
|
$600.000
|
$620.000
|
$1,000.000
|
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
12.000
|
$850.000
|
$900.000
|
$840.000
|
$2,011.000
|
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
187.000
|
$200.000
|
$300.000
|
$149.000
|
$471.000
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
585.000
|
$700.000
|
$700.000
|
$950.000
|
$1,052.000
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
128.000
|
$125.000
|
$128.000
|
$100.000
|
$183.000
|
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
864.000
|
$180.000
|
$200.000
|
$120.000
|
$222.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
3.000
|
$22,000.000
|
$19,000.000
|
$16,000.000
|
$26,884.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
9.000
|
$15,000.000
|
$22,000.000
|
$17,000.000
|
$27,349.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,500.000
|
$2,500.000
|
$3,500.000
|
$3,399.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$3,000.000
|
$3,500.000
|
$3,800.000
|
$4,637.000
|
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
116.000
|
$500.000
|
$750.000
|
$450.000
|
$1,131.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$3,000.000
|
$3,000.000
|
$8,000.000
|
$4,907.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
22.000
|
$750.000
|
$3,000.000
|
$2,300.000
|
$52.000
|
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
2,448.000
|
$3.000
|
$17.000
|
$11.000
|
$8.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,589,000.000
|
$1,800,000.000
|
$2,157,100.000
|
$2,825,428.780
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$15,000.000
|
$30,000.000
|
$134,898.000
|
$8,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
178.000
|
$50.000
|
$50.000
|
$55.000
|
$69.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
89.000
|
$12.000
|
$50.000
|
$20.000
|
$23.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
672.000
|
$20.000
|
$35.000
|
$45.000
|
$53.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
336.000
|
$9.010
|
$15.000
|
$14.000
|
$19.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
125.000
|
$2.500
|
$12.000
|
$8.000
|
$15.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
63.000
|
$2.000
|
$3.000
|
$2.000
|
$15.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,042.000
|
$10.000
|
$8.000
|
$16.000
|
$13.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,521.000
|
$2.000
|
$5.000
|
$1.000
|
$6.000
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
7,030.000
|
$85.000
|
$120.000
|
$125.000
|
$200.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
5,990.000
|
$48.000
|
$40.000
|
$20.000
|
$75.000
|
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
3,256.000
|
$70.000
|
$100.000
|
$24.000
|
$88.000
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,309.000
|
$150.000
|
$95.000
|
$125.000
|
$226.000
|
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,128.000
|
$90.000
|
$80.000
|
$100.000
|
$150.000
|
|
|
|
CURB RAMPS (TY 2)
|
SY
|
175.000
|
$150.000
|
$80.000
|
$320.000
|
$264.000
|
|
|
|
CURB RAMPS (TY 7)
|
SY
|
214.000
|
$150.000
|
$80.000
|
$320.000
|
$264.000
|
|
|
|
CURB RAMPS (TY 10)
|
SY
|
206.000
|
$150.000
|
$145.000
|
$320.000
|
$264.000
|
|
|
|
CURB RAMPS (TY 22)
|
SY
|
30.000
|
$150.000
|
$80.000
|
$320.000
|
$302.000
|
|
|
|
CONC MEDIAN
|
SY
|
278.000
|
$200.000
|
$95.000
|
$300.000
|
$264.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$320.000
|
$7,500.000
|
$406.000
|
$953.000
|
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
598.000
|
$55.000
|
$45.000
|
$51.000
|
$76.000
|
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
708.000
|
$19.650
|
$15.000
|
$8.000
|
$11.000
|
|
|
|
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
|
LF
|
400.000
|
$30.000
|
$75.000
|
$61.000
|
$105.000
|
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
10.000
|
$550.000
|
$4,500.000
|
$2,600.000
|
$3,811.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
14.000
|
$372.400
|
$600.000
|
$406.000
|
$1,300.000
|
|
|
|
IN RD IL (TY SA) 30T-8 (250W EQ) LED
|
EA
|
3.000
|
$6,000.000
|
$4,200.000
|
$3,600.000
|
$6,669.000
|
|
|
|
IN RD IL (TY AL) 50S-12 (400W EQ) LED
|
EA
|
21.000
|
$6,000.000
|
$5,340.000
|
$4,600.000
|
$8,479.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
7,670.000
|
$14.000
|
$9.300
|
$8.000
|
$15.000
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,310.000
|
$30.000
|
$21.600
|
$19.000
|
$34.000
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
120.000
|
$20.000
|
$10.800
|
$10.000
|
$17.000
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
435.000
|
$20.000
|
$24.000
|
$21.000
|
$38.000
|
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
415.000
|
$30.000
|
$16.800
|
$15.000
|
$27.000
|
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
70.000
|
$35.000
|
$19.200
|
$17.000
|
$30.000
|
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
1,115.000
|
$50.000
|
$33.000
|
$28.000
|
$52.000
|
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
160.000
|
$2.000
|
$1.500
|
$2.000
|
$2.000
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
5,060.000
|
$2.000
|
$1.800
|
$2.000
|
$3.000
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
10,590.000
|
$2.500
|
$2.000
|
$2.000
|
$3.000
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
2,145.000
|
$2.500
|
$2.000
|
$2.000
|
$3.000
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
680.000
|
$3.000
|
$2.400
|
$2.000
|
$4.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$1,800.000
|
$900.000
|
$920.000
|
$1,429.000
|
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
18.000
|
$1,500.000
|
$1,080.000
|
$920.000
|
$1,715.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)AL(E)PS(U)
|
EA
|
2.000
|
$9,000.000
|
$7,800.000
|
$6,600.000
|
$12,385.000
|
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)SP(U)
|
EA
|
4.000
|
$9,350.000
|
$7,200.000
|
$6,600.000
|
$11,433.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
6.000
|
$1,000.000
|
$1,500.000
|
$800.000
|
$1,633.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$1,200.000
|
$1,500.000
|
$800.000
|
$1,711.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
14.000
|
$1,000.000
|
$1,000.000
|
$1,600.000
|
$2,589.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$100.000
|
$1,000.000
|
$158.000
|
$476.000
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
2,579.000
|
$4.250
|
$4.800
|
$2.200
|
$8.000
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
6,091.000
|
$4.500
|
$4.800
|
$2.200
|
$8.000
|
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
3,869.000
|
$5.500
|
$3.600
|
$2.200
|
$6.000
|
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
9,136.000
|
$5.000
|
$3.600
|
$2.200
|
$6.000
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
440.000
|
$25.000
|
$14.400
|
$6.100
|
$24.000
|
|
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
1,675.000
|
$1.500
|
$2.400
|
$1.300
|
$4.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,372.000
|
$1.500
|
$2.400
|
$1.300
|
$4.000
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
17,917.000
|
$1.200
|
$0.400
|
$0.400
|
$1.000
|
|
|
|
PAVEMENT SEALER 8"
|
LF
|
12,924.000
|
$2.500
|
$0.400
|
$0.400
|
$1.000
|
|
|
|
PAVEMENT SEALER 12"
|
LF
|
680.000
|
$1.320
|
$4.800
|
$0.800
|
$8.000
|
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,695.000
|
$3.320
|
$6.000
|
$0.900
|
$10.000
|
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
4.000
|
$300.000
|
$330.000
|
$6.000
|
$544.000
|
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
28.000
|
$10.000
|
$18.000
|
$5.000
|
$30.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,461.000
|
$2.000
|
$1.200
|
$0.700
|
$2.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,103.000
|
$0.900
|
$1.200
|
$0.700
|
$2.000
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,847.000
|
$0.750
|
$1.200
|
$0.700
|
$2.000
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
11,484.000
|
$0.900
|
$1.200
|
$0.700
|
$2.000
|
|
|
|
PREFAB PAV MRK TY B (W)(12")(SLD)
|
LF
|
680.000
|
$30.000
|
$21.600
|
$20.000
|
$36.000
|
|
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
1,695.000
|
$35.000
|
$43.200
|
$38.000
|
$71.000
|
|
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
27.000
|
$354.770
|
$840.000
|
$507.000
|
$1,384.000
|
|
|
|
PREFAB PAV MRK TY B (W)(DBL ARROW)
|
EA
|
3.000
|
$400.000
|
$1,260.000
|
$862.000
|
$2,077.000
|
|
|
|
PREFAB PAV MRK TY B (W)(RR XING)
|
EA
|
4.000
|
$600.000
|
$2,520.000
|
$2,281.000
|
$4,153.000
|
|
|
|
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
|
EA
|
28.000
|
$210.000
|
$120.000
|
$178.000
|
$198.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
138.000
|
$5.000
|
$9.000
|
$5.000
|
$15.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
320.000
|
$6.500
|
$9.000
|
$5.000
|
$15.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,030.000
|
$3.000
|
$2.400
|
$0.500
|
$4.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
50.000
|
$3.000
|
$2.400
|
$0.700
|
$4.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
335.000
|
$5.000
|
$6.000
|
$0.700
|
$10.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
3.000
|
$180.000
|
$300.000
|
$127.000
|
$494.000
|
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
17,895.000
|
$1.500
|
$0.450
|
$0.100
|
$1.000
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
6,462.000
|
$2.000
|
$0.450
|
$0.100
|
$1.000
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,695.000
|
$2.500
|
$4.200
|
$0.500
|
$7.000
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
26.000
|
$60.000
|
$174.000
|
$18.000
|
$287.000
|
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
3.000
|
$70.000
|
$360.000
|
$21.000
|
$593.000
|
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
4.000
|
$15,000.000
|
$17,980.000
|
$26,000.000
|
$19,054.000
|
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
27.000
|
$305.000
|
$375.000
|
$300.000
|
$524.000
|
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
18.000
|
$310.000
|
$375.000
|
$300.000
|
$524.000
|
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
33.000
|
$305.000
|
$375.000
|
$300.000
|
$524.000
|
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
25.000
|
$310.000
|
$375.000
|
$300.000
|
$524.000
|
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
39.000
|
$305.000
|
$375.000
|
$300.000
|
$524.000
|
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
11.000
|
$315.000
|
$375.000
|
$300.000
|
$524.000
|
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
17.000
|
$970.000
|
$880.000
|
$815.000
|
$1,524.000
|
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
30.000
|
$150.000
|
$207.000
|
$305.000
|
$524.000
|
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
7.000
|
$170.000
|
$277.000
|
$305.000
|
$543.000
|
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
7.000
|
$180.000
|
$275.000
|
$305.000
|
$572.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,450.000
|
$3.000
|
$3.500
|
$5.000
|
$9.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
585.000
|
$4.500
|
$4.000
|
$6.000
|
$10.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
1,425.000
|
$7.000
|
$6.200
|
$7.000
|
$11.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
1,590.000
|
$9.000
|
$8.000
|
$8.000
|
$14.000
|
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
2,485.000
|
$2.750
|
$2.800
|
$4.000
|
$7.000
|
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$14,000.000
|
$10,120.000
|
$14,192.000
|
$26,676.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
2.000
|
$15,000.000
|
$13,029.000
|
$14,700.000
|
$27,629.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')
|
EA
|
2.000
|
$16,000.000
|
$15,216.000
|
$16,800.000
|
$31,440.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
2.000
|
$17,800.000
|
$17,370.000
|
$18,800.000
|
$35,251.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$40,000.000
|
$31,685.000
|
$33,000.000
|
$61,927.000
|
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')
|
EA
|
3.000
|
$41,000.000
|
$31,584.000
|
$34,500.000
|
$64,785.000
|
|
|
|
PED POLE ASSEMBLY
|
EA
|
10.000
|
$3,800.000
|
$3,015.500
|
$1,800.000
|
$3,335.000
|
|
|
|
PEDESTRIAN PUSH BUTTON POLE
|
EA
|
10.000
|
$2,000.000
|
$2,691.000
|
$1,800.000
|
$3,335.000
|
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
10.000
|
$550.000
|
$443.000
|
$470.000
|
$1,905.000
|
|
|
|
INSTALL OF TIMBER POLES
|
EA
|
10.000
|
$100.000
|
$1,084.000
|
$1,170.000
|
$4,764.000
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$12,600.000
|
$5,000.000
|
$5,000.000
|
$1,905.000
|
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$6,841.480
|
$2,000.000
|
$2,600.000
|
$4,764.000
|
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
33,722.000
|
$23.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
5,362.000
|
$20.230
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
D-GR HMA TY-D SAC-A PG76-28
|
TON
|
1,045.000
|
$240.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SP MIXES SP-C SAC-A PG76-28
|
TON
|
7,756.000
|
$240.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
3,878.000
|
$300.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$500.000
|
$2,000.000
|
$722.000
|
$1,905.000
|
|
|
|
SPLIT RAIL FENCE (INSTALL)
|
LF
|
238.000
|
$6.420
|
$40.000
|
$85.000
|
$238.000
|
|
|
|
REMOVE AND RELOCATE STEEL FENCE
|
LF
|
1,022.000
|
$100.000
|
$75.000
|
$75.000
|
$95.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,350.000
|
$50.000
|
$100.000
|
$40.000
|
$157.000
|
|
|
|
GROUND BOX (PREPARE)
|
EA
|
3.000
|
$1,900.000
|
$640.000
|
$507.000
|
$953.000
|
|
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
22.000
|
$3.000
|
$2.300
|
$26.000
|
$49.000
|
|
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
415.000
|
$3.000
|
$3.200
|
$51.000
|
$99.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
660.000
|
$200.000
|
$250.000
|
$265.000
|
$866.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
8.000
|
$475.000
|
$500.000
|
$790.000
|
$953.000
|
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
2.000
|
$3,800.000
|
$7,200.000
|
$6,083.000
|
$11,433.000
|
|
|
|
VIVDS PROSR SYS
|
EA
|
2.000
|
$11,000.000
|
$16,800.000
|
$14,192.000
|
$26,676.000
|
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
8.000
|
$1,000.000
|
$3,000.000
|
$2,535.000
|
$4,764.000
|
|
|
|
VIVDS CABLING
|
LF
|
1,590.000
|
$3.000
|
$3.000
|
$3.000
|
$5.000
|
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
1.000
|
$16,500.000
|
$17,000.000
|
$17,441.320
|
$47,636.000
|
|
|
|
HIGH PRESSURE WATER BLASTING SYSTEM 4"
|
LF
|
2,500.000
|
$2.500
|
$4.800
|
$6.000
|
$3.000
|
|
1
|
|
FL BS (CMP IN PLC)(TY A GR 4)(12")
|
SY
|
8,297.000
|
$20.000
|
$42.000
|
$33.000
|
$62.000
|
|
1
|
|
CEMENT
|
TON
|
558.000
|
$280.000
|
$350.000
|
$264.000
|
$437.000
|
|
1
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
48,810.000
|
$10.000
|
$7.500
|
$6.000
|
$11.000
|
|
1
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
42,289.000
|
$116.000
|
$112.000
|
$117.500
|
$150.000
|
|
1
|
|
D-GR HMA TY-D SAC-A PG76-28
|
TON
|
2,704.000
|
$240.000
|
$250.000
|
$254.000
|
$306.000
|
|
1
|
|
SP MIXES SP-C SAC-A PG76-28
|
TON
|
1,777.000
|
$240.000
|
$250.000
|
$218.000
|
$299.000
|
|
1
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
889.000
|
$300.000
|
$250.000
|
$182.000
|
$328.000
|
|
Totals: |
$24,545,901.610
|
$19,074,046.670
|
$21,571,088.000
|
$28,381,172.000
|