Show Job Controls
Bid Cobra

LLANO SH 29 (0150-02-043)

Items: 76

County: LLANO
Length: 1.7960 MILES
Highway: SH 29
District: AUSTIN
Control Number: 0150-02-043
DBE Goal: 0.0%
Project: STP 2026(901)VRU
Guaranty: $51,000.00
Time: 144 WORKING DAYS
Engineer's Estimate: $2,487,668.03
Date: 1:00 PM AUGUST 05, 2026 (in 5 weeks)
Contract Number: 8263025
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00193149
Contract Type: Federal
Project Description: CONSTRUCT PAVED SHOULDERS >= 5FT, PROFILE EDGE AND CENTERLINE STRIPING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
LLANO SH 29 (0150-02-043)
Project Name: N/A
Project: STP 2026(901)VRU
Length: 1.7960 MILES
Project Type: CONSTRUCTION
Limits From: SH 71
Limits To: 0.110 MI E OF ZULA RD
Project Description: CONSTRUCT PAVED SHOULDERS >= 5FT, PROFILE EDGE AND CENTERLINE STRIPING
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

76 Total 0 of 76
LLANO  |  SH 29  |  AUSTIN  |  0150-02-043  |  1:00 PM AUGUST 05, 2026  |  $2,487,668.03  |  STP 2026(901)VRU  |  HAZARD ELIM & SAFETY  |  144 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 93.930
TREE PROTECTION (INSTALL)
EA 10.000
REMOV CONC (MEDIANS)
SY 33.000
REMOV CONC (CURB & GUTTER)
LF 80.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 423.000
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 9,494.000
EXCAV (ROADWAY)
CY 6,948.000
EMBANK (FNL)(OC)(TY B)
CY 1,982.000
BACKFILL (TY A)
STA 5.000
FURN & PLACE TOPSOIL (4")
SY 20,587.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 20,587.000
DRILL SEED (PERM_RURAL_SAND)
SY 20,587.000
VEGETATIVE WATERING
TGL 345.860
SOIL RET BLKT(SL_MOD_SAND_LONG)
SY 20,587.000
WILDFLOWER SEEDING
AC 4.250
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 4,394.000
PRIME COAT (AE-P)
GAL 3,450.000
D-GR HMA TY-B PG64-22
TON 3,535.000
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 420.000
D-GR HMA TY-D PG76-22
TON 1,415.000
TOM-C PG76-22 SAC-B
TON 2,643.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 5,056.000
PLANE & TEXT ASPH CONC PAV(1")
SY 1,222.000
PLANE & TEXT ASPH CONC PAV(2")
SY 2,260.000
PLANE ASPH CONC PAV(0" TO 1" MICRO)
SY 3,593.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 5.000
RC PIPE (CL III)(18 IN)
LF 171.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000
CLEAN EXIST CULVERTS
EA 3.000
REMOV STR (SET)
EA 8.000
REMOV STR (PIPE)
LF 165.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 540.000
TMA (STATIONARY)
DAY 270.000
TMA (MOBILE OPERATION)
DAY 30.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 227.000
ROCK FILTER DAMS (REMOVE)
LF 227.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,606.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,606.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,488.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,488.000
CONC CURB & GUTTER (TY II)
LF 80.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 881.000
CONC MEDIAN
LF 29.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000
REMOVE SM RD SN SUP&AM
EA 13.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 37.000
INSTL OM ASSM (OM-1)(WFLX)GND
EA 7.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 6.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 18,704.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 2,291.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 18,786.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,282.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 866.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 121.000
RE PM TY II (W) 6" (BRK)
LF 500.000
RE PM TY II (W) 6" (SLD)
LF 2,000.000
RE PM TY II (W) 8" (SLD)
LF 121.000
RE PM TY II (Y) 6" (SLD)
LF 2,000.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 18,978.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 19,311.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 4,830.000
REFL PAV MRKR TY I-C
EA 224.000
REFL PAV MRKR TY II-A-A
EA 224.000
ELIM EXT PM & MRKS (6")
LF 25,830.000
BONDING COURSE
GAL 7,494.000
TEMP SPEED MONITOR SYS
EA 2.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $35,000.00
Total: $62,000.00