LIVE OAK US 281 (0254-01-149)

Items: 72

County: LIVE OAK
Length: 0.0000 MILES
Highway: US 281
District: CORPUS CHRISTI
Control Number: 0254-01-149
DBE Goal: 0.0%
Project: F 2B26(021)
Guaranty: $100,000.00
Time: 480 WORKING DAYS
Engineer's Estimate: $10,383,718.65
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263210
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00209034
Contract Type: Federal
Project Description: CONSTRUCT CONCRETE PAVEMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
LIVE OAK US 281 (0254-01-149)
Project Name: N/A
Project: F 2B26(021)
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: TULLOS ST
Limits To: N OF SH 72 NORTH
Project Description: CONSTRUCT CONCRETE PAVEMENT
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

72 Total 0 of 72
LIVE OAK  |  US 281  |  CORPUS CHRISTI  |  0254-01-149  |  1:00 PM AUGUST 06, 2026  |  $10,383,718.65  |  F 2B26(021)  |  REHAB EXIST ROADWAY  |  480 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 51.000
REMOV CONC (DRIVEWAYS)
SY 3,718.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 2,376.000
REMOV CONC (CURB & GUTTER)
LF 4,423.000
EXCAV (ROADWAY)
CY 18,764.000
BACKFILL (TY B)
STA 51.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 5,925.000
CEMENT
TON 441.000
CEMENT TRT (NEW BASE)(6")
SY 35,550.000
PRIME COAT (MC-30)
GAL 7,057.000
D-GR HMA TY-D SAC-B PG64-22
TON 2,200.000
TACK COAT
GAL 2,992.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,600.000
CONC PVMT (CRCP) (12")
SY 30,770.000
CONC PVMT (CRCP)(HES) (12")
SY 3,469.000
STRUCT EXCAV (PIPE)
CY 49.000
CEM STABIL BKFL
CY 41.000
TRENCH EXCAVATION PROTECTION
LF 80.000
RC PIPE (CL III)(18 IN)
LF 40.000
RC PIPE (CL III)(24 IN)
LF 40.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 6.000
REMOV STR (INLET)
EA 6.000
REMOV STR (PIPE)
LF 48.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 13.000
SANDBAGS FOR EROSION CONTROL
EA 96.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 650.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 400.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,050.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 303.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 303.000
CONSTRUCTING DETOURS
SY 46.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,580.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 560.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 3,860.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,160.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,520.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 440.000
CONC CURB (MONO) (TY II)
LF 5,961.000
INTERSECTIONS (CONC)
SY 3,057.000
DRIVEWAYS (CONC)
SY 2,204.000
CONC SIDEWALKS (5")
SY 2,771.000
CURB RAMPS - ALL
EA 46.000
RELOCATE SM RD SN SUP&AM TY S80
EA 65.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 550.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 8,608.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 105.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 310.000
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
EA 16.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 910.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 20,959.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,064.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,773.000
RE PM TY II (W) 6" (BRK)
LF 190.000
RE PM TY II (Y) 6" (BRK)
LF 190.000
RE PM TY II (Y) 6" (SLD)
LF 720.000
RE PM TY III (W)(6")(SLD)
LF 2,259.000
RE PM TY III (W)(6")(BRK)
LF 1,120.000
RE PM TY III (W)(6")(DOT)
LF 88.000
RE PM TY III (W)(8")(SLD)
LF 751.000
RE PM TY III (W)(8")(DOT)
LF 223.000
RE PM TY III (Y)(6")(SLD)
LF 13,095.000
RE PM TY III (Y)(6")(BRK)
LF 2,320.000
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 2,090.000
PREFAB PM TY C (W)(24")(SLD)CONTRAST
LF 858.000
PREFAB PM TY C (W)(ARROW)
EA 5.000
PREFAB PM TY C (W)(WORD)
EA 5.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 8.000
REFL PAV MRKR TY I-C
EA 204.000
REFL PAV MRKR TY II-A-A
EA 348.000
TEMP TRAF SIGNALS
EA 2.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $55,000.00