PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
40.000
|
$250.000
|
$350.000
|
$770.000
|
$1,000.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
151.000
|
$600.000
|
$825.000
|
$775.000
|
$1,300.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
4.000
|
$1,500.000
|
$3,500.000
|
$1,250.000
|
$2,100.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
528.000
|
$25.000
|
$40.000
|
$105.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
62,228.000
|
$13.000
|
$17.250
|
$20.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
32,298.000
|
$10.000
|
$12.800
|
$31.000
|
$12.000
|
|
|
BLADING
|
HR
|
92.000
|
$125.000
|
$315.000
|
$160.000
|
$150.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
151.000
|
$1,000.000
|
$485.000
|
$440.000
|
$0.150
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
151.000
|
$350.000
|
$425.000
|
$380.000
|
$4.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
1,699.000
|
$2.000
|
$3.350
|
$3.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(12")
|
SY
|
279,921.000
|
$17.000
|
$15.000
|
$20.000
|
$32.000
|
|
|
CEMENT
|
TON
|
2,606.000
|
$195.000
|
$190.000
|
$185.000
|
$250.000
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(8")
|
SY
|
289,573.000
|
$4.000
|
$2.000
|
$4.000
|
$5.500
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
69,980.000
|
$5.000
|
$5.200
|
$6.000
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
73,084.000
|
$4.000
|
$3.000
|
$4.500
|
$5.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
453,805.000
|
$2.800
|
$3.100
|
$6.000
|
$5.000
|
|
|
AGGR(TY-B GR-2 SAC-B)
|
CY
|
2,703.000
|
$125.000
|
$122.800
|
$225.000
|
$155.000
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
2,253.000
|
$100.000
|
$127.350
|
$225.000
|
$155.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,100.000
|
$150.000
|
$127.250
|
$310.000
|
$155.000
|
|
|
D-GR HMA(SQ) TY-D PG70-22
|
TON
|
2.000
|
$500.000
|
$3,525.000
|
$1,500.000
|
$6,000.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
11.000
|
$100.000
|
$100.000
|
$200.000
|
$125.000
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
44.000
|
$50.000
|
$97.350
|
$300.000
|
$45.000
|
|
|
CEM STABIL BKFL
|
CY
|
16.000
|
$250.000
|
$575.000
|
$1,500.000
|
$95.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
364.000
|
$25.000
|
$56.000
|
$65.000
|
$75.000
|
|
|
STL H - PILING (HP 14 X 73)
|
LF
|
500.000
|
$200.000
|
$150.400
|
$102.000
|
$125.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
19.000
|
$4,000.000
|
$4,000.000
|
$5,000.000
|
$1,500.000
|
|
|
CL C CONC (CAP)(HPC)(EXTEND)
|
CY
|
12.000
|
$4,000.000
|
$3,500.000
|
$7,000.000
|
$2,500.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)(HPC)
|
SF
|
1,962.000
|
$40.000
|
$110.000
|
$135.000
|
$49.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
316.000
|
$250.000
|
$285.000
|
$310.000
|
$290.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
448.000
|
$10.000
|
$48.000
|
$45.000
|
$12.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
93.000
|
$210.000
|
$145.000
|
$400.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
110.000
|
$500.000
|
$578.400
|
$550.000
|
$385.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
95.000
|
$400.000
|
$225.000
|
$300.000
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
261.000
|
$500.000
|
$775.000
|
$550.000
|
$450.000
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
44.000
|
$51.000
|
$185.000
|
$200.000
|
$25.000
|
|
|
RAIL (TY T223)
|
LF
|
352.000
|
$95.000
|
$170.000
|
$250.000
|
$85.000
|
|
|
JOINT SEALANT
|
LF
|
65.000
|
$40.000
|
$75.000
|
$200.000
|
$25.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
25.000
|
$400.000
|
$400.000
|
$700.000
|
$370.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
90.000
|
$275.000
|
$565.000
|
$600.000
|
$325.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
28.000
|
$100.000
|
$94.100
|
$82.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,461.000
|
$100.000
|
$110.300
|
$138.000
|
$115.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
244.000
|
$120.000
|
$146.400
|
$170.000
|
$130.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
78.000
|
$150.000
|
$222.900
|
$245.000
|
$160.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
28.000
|
$202.000
|
$382.750
|
$400.000
|
$275.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$6,000.000
|
$13,400.000
|
$11,500.000
|
$5,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
4.000
|
$5,000.000
|
$14,275.000
|
$6,000.000
|
$7,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (P)
|
EA
|
6.000
|
$7,000.000
|
$10,000.000
|
$7,700.000
|
$8,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$1,160.000
|
$1,000.000
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,160.000
|
$1,100.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
28.000
|
$2,000.000
|
$1,260.000
|
$1,200.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
82.000
|
$2,500.000
|
$1,360.000
|
$1,600.000
|
$3,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$2,000.000
|
$1,360.000
|
$1,600.000
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$3,375.000
|
$2,500.000
|
$2,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
$2,800.000
|
$2,335.000
|
$2,650.000
|
$2,900.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$2,345.000
|
$3,000.000
|
$4,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$2,345.000
|
$3,000.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$2,275.000
|
$3,500.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$2,790.000
|
$4,000.000
|
$7,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$4,896.000
|
$5,700.000
|
$5,500.000
|
$20,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
52.000
|
$1,000.000
|
$1,940.000
|
$3,000.000
|
$3,200.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
89.000
|
$1,000.000
|
$985.000
|
$450.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,385.000
|
$25.000
|
$50.000
|
$12.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,150,000.000
|
$1,635,000.000
|
$2,250,000.000
|
$2,300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$25,000.000
|
$34,200.000
|
$29,100.000
|
$10,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,808.000
|
$20.000
|
$43.150
|
$23.000
|
$22.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,808.000
|
$7.000
|
$5.700
|
$13.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,320.000
|
$5.000
|
$6.950
|
$5.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,320.000
|
$1.000
|
$2.200
|
$1.000
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
9,540.000
|
$4.200
|
$7.650
|
$5.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
9,540.000
|
$1.000
|
$2.700
|
$1.000
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
570.000
|
$20.000
|
$22.500
|
$30.000
|
$9.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
570.000
|
$8.600
|
$10.000
|
$15.000
|
$8.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
570.000
|
$20.000
|
$22.500
|
$25.000
|
$10.000
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
945.000
|
$32.450
|
$92.000
|
$100.000
|
$42.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
13,777.000
|
$32.450
|
$31.600
|
$72.000
|
$42.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,450.000
|
$29.000
|
$34.500
|
$39.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,200.000
|
$2,000.000
|
$1,800.000
|
$1,900.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
604.000
|
$3.600
|
$2.250
|
$2.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$300.000
|
$1,235.000
|
$1,110.000
|
$225.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
32.000
|
$3,000.000
|
$750.000
|
$675.000
|
$2,715.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,500.000
|
$700.000
|
$3,000.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$275.000
|
$3,000.000
|
$1,365.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$5,945.000
|
$12,000.000
|
$8,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
46.000
|
$1,200.000
|
$685.000
|
$710.000
|
$510.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
29.000
|
$1,000.000
|
$745.000
|
$920.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,500.000
|
$875.000
|
$840.000
|
$760.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
77.000
|
$100.000
|
$153.000
|
$100.000
|
$95.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$40.000
|
$27.250
|
$25.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
116.000
|
$140.000
|
$135.000
|
$125.000
|
$4.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
65.000
|
$40.000
|
$27.250
|
$25.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
176,403.000
|
$0.650
|
$0.330
|
$0.300
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
1,222.000
|
$4.200
|
$3.890
|
$3.500
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
12.000
|
$10.000
|
$27.750
|
$25.000
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
18.000
|
$50.000
|
$38.900
|
$35.000
|
$250.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
16,540.000
|
$0.800
|
$0.330
|
$0.300
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
82,324.000
|
$0.800
|
$0.330
|
$0.300
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
180.000
|
$4.500
|
$5.550
|
$5.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
176,403.000
|
$0.300
|
$0.560
|
$0.500
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
1,222.000
|
$3.540
|
$5.550
|
$5.000
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
12.000
|
$8.240
|
$33.350
|
$30.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
18.000
|
$50.000
|
$44.450
|
$40.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
16,540.000
|
$0.300
|
$0.940
|
$0.850
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
82,324.000
|
$0.300
|
$0.560
|
$0.500
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
14,021.000
|
$1.150
|
$1.200
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
105.000
|
$10.000
|
$27.750
|
$25.000
|
$5.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
10.000
|
$40.000
|
$66.650
|
$60.000
|
$300.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
174,016.000
|
$0.400
|
$0.490
|
$0.440
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
16,820.000
|
$0.400
|
$0.490
|
$0.440
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
82,324.000
|
$0.400
|
$0.490
|
$0.440
|
$0.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$10,000.000
|
$7,775.000
|
$8,000.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$23,550.000
|
$17,500.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$375.000
|
$550.000
|
$520.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,500.000
|
$50.000
|
$76.500
|
$95.000
|
$50.000
|
|
Totals: |
$15,835,524.860
|
$16,356,130.410
|
$22,598,455.000
|
$23,254,192.800
|