Job Info for 1690-01-134

County: LAMAR Highway: US 82 Date: 11/04/2021 (3 years ago) Engineer's Estimate: $2,496,884 Control Number: 1690-01-134
Project: F 2022(126) District: PARIS Time: 110 WORKING DAYS Type: PREVENTIVE MAINTENANCE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,496,884.15
HIGHWAY 19 CONSTRUCTION LLC   $2,962,393.90 1
18.64% | $465,509.75
EAST TEXAS BRIDGE, INC.   $3,538,564.44 2
41.72% | $1,041,680.29
19.45% | $576,170.54
ED BELL CONSTRUCTION COMPANY   $5,059,737.15 3
102.64% | $2,562,853.00
70.8% | $2,097,343.25
42.99% | $1,521,172.71
Subcontractor Percentage Amount
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. 13.54% $401,108.13
STRIPING TECHNOLOGY, L.P. 2.97% $87,983.10
SKIDABRADER GROUP LLC 2.17% $64,283.95
TEXOP CONSTRUCTION 0.87% $25,772.83
FLEX SUPPLY, LLC 0.64% $18,959.32
SOUTHERN CROSS CONTRACTORS, LLC 0.53% $15,700.69
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.36% $10,664.62
Total: 21.08% $624,472.64

Bid Items

Items: 78, 0 filtered
LAMAR US 82  |  PARIS  |  1690-01-134  |  11/04/2021  |  $2,496,884  |  F 2022(126)  |  PREVENT MAINT  |  110 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HIGHWAY 19 CONSTRUCTION LLC EAST TEXAS BRIDGE, INC. ED BELL CONSTRUCTION COMPANY
104 6017 REMOVING CONC (DRIVEWAYS) SY 357.000 $15.000 $25.000 $20.000 $44.000
110 6002 EXCAVATION (CHANNEL) CY 1,169.000 $15.000 $30.000 $20.000 $55.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 217.000 $25.000 $50.000 $40.000 $50.000
134 6001 BACKFILL (TY A) STA 58.000 $200.000 $300.000 $250.000 $250.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 18,746.000 $0.100 $0.100 $0.100 $0.360
164 6015 STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY) SY 18,746.000 $0.200 $0.300 $0.240 $0.880
168 6001 VEGETATIVE WATERING MG 112.000 $20.000 $100.000 $15.000 $358.510
354 6029 PLANE ASPH CONC PAV(0" TO 6") SY 6,458.000 $5.500 $10.000 $10.000 $7.980
416 6015 DRILL SHAFT (NON - REINFORCED) (12 IN) LF 7.000 $120.000 $180.000 $200.000 $99.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 43.200 $425.000 $450.000 $450.000 $715.000
464 6005 RC PIPE (CL III)(24 IN) LF 726.000 $70.000 $60.000 $55.000 $148.500
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 28.000 $1,250.000 $1,150.000 $900.000 $1,320.000
496 6004 REMOV STR (SET) EA 6.000 $450.000 $500.000 $500.000 $825.000
496 6007 REMOV STR (PIPE) LF 334.000 $13.000 $50.000 $15.000 $44.000
500 6001 MOBILIZATION LS 1.000 $120,000.000 $250,000.000 $350,000.000 $722,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $6,000.000 $5,000.000 $20,000.000 $21,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 60.000 $32.000 $42.000 $45.000 $170.560
506 6011 ROCK FILTER DAMS (REMOVE) LF 60.000 $7.500 $10.000 $10.000 $38.270
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 23.000 $75.000 $10.000 $75.000 $300.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 470.000 $2.300 $3.000 $4.000 $7.300
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 470.000 $0.750 $1.000 $1.000 $3.770
512 6017 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) LF 1,935.000 $20.000 $25.000 $40.000 $20.000
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 2,300.000 $6.000 $15.000 $10.000 $10.000
512 6041 PORT CTB (STKPL)(F-SHAPE)(TY 1) LF 1,935.000 $7.500 $25.000 $10.000 $10.000
512 6094 PTB (FUR & INST)(STEEL) LF 3,225.000 $100.000 $25.000 $170.000 $180.000
512 6095 PTB (MOVE)(STEEL) LF 4,500.000 $7.500 $25.000 $10.000 $8.000
512 6097 PTB (STKPL)(STEEL) LF 3,225.000 $7.500 $25.000 $10.000 $8.000
514 6001 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF 515.000 $55.000 $150.000 $90.000 $200.000
530 6004 DRIVEWAYS (CONC) SY 357.000 $100.000 $110.000 $90.000 $154.000
530 6005 DRIVEWAYS (ACP) SY 935.000 $42.000 $75.000 $40.000 $41.380
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 850.000 $23.000 $31.000 $33.000 $31.900
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1.000 $1,800.000 $2,500.000 $2,600.000 $2,640.000
540 6037 MTL BM GD FEN TRANS (ANCHOR PLATE) EA 1.000 $600.000 $1,000.000 $1,000.000 $825.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 875.000 $2.500 $2.000 $3.000 $1.650
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 $2,500.000 $3,200.000 $3,700.000 $3,520.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 1.000 $300.000 $250.000 $300.000 $16.500
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 2.000 $1,250.000 $1,500.000 $2,000.000 $1,375.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 5.000 $500.000 $800.000 $1,000.000 $550.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 7.000 $7,500.000 $23,500.000 $16,000.000 $13,926.830
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 4.000 $200.000 $250.000 $400.000 $240.900
560 6005 MAILBOX INSTALL-D (TWG-POST) TY 2 EA 1.000 $250.000 $350.000 $400.000 $295.900
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 10.000 $535.000 $950.000 $800.000 $645.700
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $550.000 $850.000 $1,000.000 $777.700
644 6076 REMOVE SM RD SN SUP&AM EA 14.000 $75.000 $100.000 $125.000 $85.800
647 6002 RELOCATE LRSA EA 1.000 $2,000.000 $1,000.000 $4,000.000 $4,015.000
658 6071 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) EA 39.000 $30.000 $55.000 $25.000 $16.500
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 18,165.000 $0.750 $2.000 $1.100 $1.100
662 6071 WK ZN PAV MRK REMOV (W)8"(SLD) LF 2,425.000 $1.250 $1.000 $2.200 $2.200
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 17,340.000 $0.750 $1.000 $1.100 $1.100
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 881.000 $1.000 $1.000 $2.000 $1.650
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 534.000 $1.250 $1.000 $2.000 $1.650
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 2,146.000 $0.750 $0.850 $1.000 $0.940
666 6047 REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 22.000 $6.500 $5.000 $6.000 $5.500
666 6053 REFL PAV MRK TY I (W)(ARROW)(090MIL) EA 13.000 $125.000 $130.000 $150.000 $143.000
666 6056 REFL PAV MRK TY I(W)(DBL ARROW)(090MIL) EA 1.000 $175.000 $200.000 $250.000 $220.000
666 6077 REFL PAV MRK TY I (W)(WORD)(090MIL) EA 13.000 $150.000 $150.000 $175.000 $165.000
666 6098 REF PAV MRK TY I(W)18"(YLD TRI)(090MIL) EA 68.000 $45.000 $35.000 $40.000 $38.500
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 2,190.000 $0.500 $1.000 $1.100 $1.100
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 1,649.000 $0.250 $1.000 $1.100 $1.100
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 1,012.000 $0.300 $1.000 $1.100 $1.100
666 6342 REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF 8,670.000 $0.700 $1.000 $1.100 $1.100
666 6345 REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF 8,670.000 $0.750 $1.000 $1.100 $1.100
672 6009 REFL PAV MRKR TY II-A-A EA 26.000 $3.000 $5.000 $6.000 $5.500
672 6010 REFL PAV MRKR TY II-C-R EA 324.000 $3.500 $5.000 $6.000 $5.500
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 17,340.000 $0.400 $0.500 $0.550 $0.550
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 2,140.000 $0.750 $0.750 $1.000 $0.830
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 15.000 $75.000 $50.000 $55.000 $55.000
677 6012 ELIM EXT PAV MRK & MRKS (WORD) EA 14.000 $80.000 $75.000 $85.000 $82.500
677 6018 ELIM EXT PAV MRK & MRKS (18")(YLD TRI) EA 68.000 $3.750 $30.000 $35.000 $33.000
678 6001 PAV SURF PREP FOR MRK (4") LF 14,890.000 $0.150 $0.050 $0.070 $0.060
678 6004 PAV SURF PREP FOR MRK (8") LF 1,398.000 $0.250 $0.050 $0.550 $0.550
3069 6002 TEXTURING CONCRETE PAVEMENT) SY 11,915.000 $4.000 $6.000 $5.000 $5.000
3076 6015 D-GR HMA TY-C PG64-22 TON 3,942.000 $100.000 $92.000 $100.000 $150.000
3084 6001 BONDING COURSE GAL 904.000 $3.500 $6.000 $6.000 $3.000
3093 6001 CONC PVMT (CONT REINF-CRCP) (5") SY 11,914.000 $70.000 $77.000 $90.000 $150.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.000 $10,000.000 $10,000.000 $20,000.000 $18,000.000
6185 6002 TMA (STATIONARY) DAY 400.000 $225.000 $200.000 $200.000 $157.500
6185 6003 TMA (MOBILE OPERATION) HR 240.000 $75.000 $50.000 $30.000 $73.500
Totals: $2,496,884.15 $2,962,393.90 $3,538,564.44 $5,059,737.15