Bid Cobra

LAMAR CS (0901-29-094)

Items: 42

County: LAMAR
Length: N/A
Highway: CS
District: PARIS
Control Number: 0901-29-094
DBE Goal: N/A
Project: BR 2B20(161)
Guaranty: N/A
Time: 96 WORKING DAYS
Engineer's Estimate: $453,962.10
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATE BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$453,962.10
$499,928.61
Over/Under Est: 10.13% $45,966.51
Over/Under Est: 15.14% $68,737.10
Amt Left: 4.55% $22,770.59
Over/Under Est: 18.71% $84,957.85
Amt Left: 7.8% $38,991.34
Delta: -3.10% -$16,220.75
Over/Under Est: 31.81% $144,387.90
Amt Left: 19.69% $98,421.39
Delta: -11.03% -$59,430.05
Over/Under Est: 31.83% $144,503.65
Amt Left: 19.71% $98,537.14
Delta: -0.02% -$115.75
$615,360.50
Over/Under Est: 35.55% $161,398.40
Amt Left: 23.09% $115,431.89
Delta: -2.82% -$16,894.75

Bid Items & Bid Tabulations

42 Total 0 of 42
LAMAR  |  CS  |  PARIS  |  0901-29-094  |  07/01/2021  |  $453,962.10  |  BR 2B20(161)  |  REHAB BRIDGE  |  96 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
ENCINO LANDSCAPE, INC.
DIGG COMMERCIAL, LLC
EAST TEXAS BRIDGE, INC.
CDM HOLDINGS, LLC
PREPARING ROW
STA 10.000 $850.000 $2,500.000 $2,000.000 $3,200.000 $2,500.000 $2,500.000 $1,500.000
EXCAVATION (ROADWAY)
CY 118.000 $10.000 $10.000 $20.000 $20.000 $67.000 $17.000 $20.000
EXCAVATION (CHANNEL)
CY 802.000 $10.000 $10.000 $20.000 $20.000 $44.000 $17.000 $22.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 524.000 $20.000 $25.000 $20.000 $20.000 $45.000 $25.000 $50.000
BLOCK SODDING
SY 96.000 $15.000 $5.000 $15.000 $5.000 $12.000 $12.000 $6.000
BROADCAST SEED (TEMP) (WARM)
SY 313.000 $1.000 $0.010 $2.000 $0.050 $3.000 $2.250 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 313.000 $1.000 $0.010 $2.000 $0.050 $3.000 $2.250 $1.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 627.000 $15.000 $5.000 $5.000 $0.450 $3.000 $2.250 $8.000
VEGETATIVE WATERING
MG 5.000 $500.000 $100.000 $1.000 $5.000 $50.000 $50.000 $100.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 901.000 $12.000 $27.000 $12.000 $20.000 $20.000 $16.000 $27.000
D-GR HMA(SQ) TY-D PG64-22
TON 16.000 $140.000 $250.000 $300.000 $200.000 $700.000 $550.000 $450.000
CEM STABIL BKFL
CY 41.000 $90.000 $150.000 $200.000 $200.000 $200.000 $250.000 $260.000
FLOWABLE BACKFILL
CY 454.000 $240.000 $150.000 $210.000 $250.000 $180.000 $235.000 $221.000
TRENCH EXCAVATION PROTECTION
LF 152.000 $15.000 $5.000 $5.000 $5.000 $1.000 $20.000 $25.000
DRILL SHAFT (24 IN)
LF 219.000 $180.000 $145.000 $120.000 $200.000 $180.000 $175.000 $185.000
CL A CONC (MISC)
CY 2.000 $400.000 $800.000 $800.000 $800.000 $1,926.000 $1,800.000 $1,000.000
CL C CONC (ABUT)
CY 21.000 $1,000.000 $1,048.000 $1,000.000 $800.000 $1,575.000 $1,300.000 $1,200.000
REINF CONC SLAB
SF 1,040.000 $20.000 $21.000 $18.000 $30.000 $31.000 $20.000 $21.000
PRESTR CONC SLAB BEAM (5SB12)
LF 197.410 $150.000 $235.000 $220.000 $150.000 $200.000 $250.000 $250.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 212.000 $130.000 $180.000 $120.000 $200.000 $100.000 $135.000 $180.000
RAIL (TY T631LS)
LF 104.000 $65.000 $60.000 $50.000 $100.000 $250.000 $55.000 $60.000
GABIONS (3' X 3')(GALV)
CY 134.000 $132.500 $500.000 $500.000 $200.000 $241.000 $500.000 $575.000
GABIONS (5'X 3')(GALV)
CY 24.000 $216.000 $500.000 $700.000 $200.000 $279.000 $500.000 $575.000
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
EA 2.000 $1,400.000 $1,000.000 $1,500.000 $1,500.000 $1,656.000 $1,200.000 $800.000
REMOV STR (BOX CULVERT)
EA 1.000 $8,500.000 $2,000.000 $12,000.000 $5,000.000 $6,998.000 $10,000.000 $5,000.000
REMOV STR (SET)
EA 4.000 $400.000 $500.000 $500.000 $500.000 $700.000 $200.000 $200.000
REMOV STR (PIPE)
LF 53.000 $15.000 $10.000 $15.000 $20.000 $50.000 $25.000 $15.000
REMOVE STR (GABION)
LF 150.000 $45.000 $30.000 $60.000 $60.000 $31.000 $100.000 $65.000
MOBILIZATION
LS 1.000 $44,862.000 $50,000.000 $46,000.000 $40,000.000 $55,885.000 $55,000.000 $51,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $4,000.000 $1,540.200 $5,000.000 $7,000.000 $5,500.000 $4,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 32.000 $32.000 $35.000 $5.000 $50.000 $63.000 $50.000 $55.000
ROCK FILTER DAMS (REMOVE)
LF 32.000 $7.000 $10.000 $5.000 $10.000 $15.000 $20.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 800.000 $3.500 $3.000 $1.000 $5.000 $4.000 $3.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 800.000 $0.640 $1.000 $1.000 $1.000 $2.000 $1.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 20.000 $5.380 $5.000 $15.000 $5.000 $14.000 $40.000 $7.000
DRIVEWAYS (ACP)
SY 42.000 $40.000 $45.000 $70.000 $100.000 $100.000 $200.000 $160.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $23.000 $30.000 $27.000 $40.000 $50.000 $30.000 $35.000
MTL BM GD FEN (REMOVE & REINSTALL)
LF 50.000 $50.000 $13.000 $20.000 $50.000 $55.000 $22.000 $30.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $2,800.000 $2,600.000 $2,000.000 $3,000.000 $3,000.000 $3,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 6.000 $26.000 $25.000 $30.000 $30.000 $50.000 $32.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $26.000 $25.000 $30.000 $30.000 $60.000 $32.000 $45.000
THERMOPLASTIC PIPE (24 IN)(PP)(TYPE I)
LF 167.000 $48.000 $45.000 $30.000 $30.000 $69.000 $50.000 $75.000
Totals: $453,962.100 $499,928.610 $522,699.200 $538,919.950 $598,350.000 $598,465.750 $615,360.500