LAMAR VA (0901-00-056)

Items: 58

County: LAMAR
Length: N/A
Highway: VA
District: PARIS
Control Number: 0901-00-056
DBE Goal: N/A
Project: F 2021(794)
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $2,467,500.70
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$2,467,500.70
$2,201,904.00
Over/Under Est: -10.76% -$265,596.70
$2,399,999.99
Over/Under Est: -2.74% -$67,500.71
Amt Left: 9% $198,095.99
$2,696,518.90
Over/Under Est: 9.28% $229,018.20
Amt Left: 22.46% $494,614.90
Delta: -12.35% -$296,518.91
$2,790,505.00
Over/Under Est: 13.09% $323,004.30
Amt Left: 26.73% $588,601.00
Delta: -3.49% -$93,986.10
Over/Under Est: 47.65% $1,175,769.05
Amt Left: 65.46% $1,441,365.75
Delta: -30.56% -$852,764.75

Bid Items & Bid Tabulations

58 Total 0 of 58
LAMAR  |  VA  |  PARIS  |  0901-00-056  |  08/05/2021  |  $2,467,500.70  |  F 2021(794)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
ENCINO LANDSCAPE, INC.
TI-ZACK CONCRETE, INC.
FNH CONSTRUCTION, LLC
O. TREVINO CONSTRUCTION, LLC
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 24.000 $180.000 $500.000 $500.000 $800.000 $3,000.000 $1,000.000
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 5.000 $2,600.000 $1,000.000 $1,600.000 $1,500.000 $5,000.000 $1,250.000
REMOVING CONC (SIDEWALKS)
SY 3,137.000 $12.000 $10.000 $39.000 $25.000 $20.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 2,298.000 $13.000 $20.000 $30.000 $30.000 $20.000 $40.000
REMOVING CONC (RETAINING WALLS)
SY 215.000 $30.000 $20.000 $30.000 $30.000 $50.000 $30.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 2,061.000 $7.000 $10.000 $30.000 $7.000 $20.000 $40.000
REMOVING CONC (MISC)
CY 19.400 $30.000 $100.000 $30.000 $40.000 $500.000 $250.000
REMOV STAB BASE AND ASPH PAV (0"-12")
SY 3,094.000 $4.000 $10.000 $30.000 $20.000 $20.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 30.000 $18.000 $50.000 $30.000 $25.000 $50.000 $115.000
FURNISHING AND PLACING TOPSOIL (4")
SY 8,435.000 $1.000 $1.000 $1.000 $4.500 $8.000 $10.000
BLOCK SODDING
SY 8,435.000 $3.000 $5.000 $3.000 $5.500 $6.000 $8.000
VEGETATIVE WATERING
MG 195.900 $30.000 $100.000 $4.000 $1.000 $30.000 $35.000
D-GR HMA(SQ) TY-D PG70-22
TON 97.900 $200.000 $500.000 $100.000 $200.000 $200.000 $300.000
FLOWABLE BACKFILL
CY 12.400 $225.000 $180.000 $200.000 $250.000 $350.000 $350.000
RIPRAP (CONC)(4 IN)
CY 51.800 $500.000 $500.000 $500.000 $700.000 $500.000 $500.000
RAIL (HANDRAIL)(TY A)
LF 576.000 $120.000 $100.000 $140.000 $100.000 $150.000 $100.000
RAIL (HANDRAIL)(TY B)
LF 83.000 $75.000 $130.000 $140.000 $140.000 $185.000 $125.000
ADJUSTING MANHOLES
EA 2.000 $1,000.000 $500.000 $700.000 $400.000 $1,500.000 $400.000
ADJUSTING MANHOLES (WATER METER)
EA 51.000 $500.000 $250.000 $500.000 $400.000 $750.000 $100.000
PIPE (PVC) (SCH 40) (12 IN)
LF 30.000 $75.000 $30.000 $60.000 $40.000 $100.000 $125.000
REMOV STR (PIPE)
EA 1.000 $370.000 $500.000 $400.000 $140.000 $500.000 $2,000.000
REMOVE STR (CONC)
EA 1.000 $180.000 $500.000 $1,500.000 $5,000.000 $5,000.000 $2,000.000
REMOV STR (MASONARY)
LF 354.000 $7.000 $20.000 $20.000 $20.000 $50.000 $25.000
REMOVE STR (RAIL)
LF 119.000 $25.000 $50.000 $20.000 $30.000 $50.000 $30.000
REMOVE STR (GABION)
LF 20.000 $75.000 $100.000 $50.000 $75.000 $50.000 $75.000
MOBILIZATION
LS 1.000 $200,000.000 $200,000.000 $176,110.390 $195,000.000 $270,000.000 $365,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $4,000.000 $5,000.000 $7,000.000 $1,000.000 $8,500.000 $11,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,100.000 $4.200 $1.000 $2.000 $0.100 $4.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,100.000 $1.400 $1.000 $0.500 $0.100 $2.000 $1.350
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,450.000 $5.500 $1.000 $2.000 $0.100 $18.000 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,450.000 $1.500 $1.000 $0.500 $0.100 $9.000 $1.350
CONC CURB & GUTTER (TY II)
LF 4,888.000 $20.000 $25.000 $20.000 $40.000 $35.000 $45.000
DRIVEWAYS (CONC)
SY 5,162.000 $95.000 $76.000 $70.000 $100.000 $80.000 $111.000
DRIVEWAYS (CONC) (HES)
SY 130.000 $120.000 $110.000 $80.000 $110.000 $125.000 $125.000
CONC SIDEWALKS (4")
SY 9,066.000 $65.000 $62.000 $60.000 $80.000 $55.000 $81.000
CURB RAMPS (TY 1)
EA 34.000 $2,000.000 $1,100.000 $1,700.000 $1,850.000 $2,000.000 $2,200.000
CURB RAMPS (TY 2)
EA 10.000 $4,000.000 $1,500.000 $1,800.000 $1,850.000 $2,000.000 $2,200.000
CURB RAMPS (TY 3)
EA 7.000 $2,000.000 $1,800.000 $2,000.000 $1,850.000 $2,000.000 $2,200.000
CURB RAMPS (TY 5)
EA 4.000 $2,750.000 $1,800.000 $2,000.000 $1,850.000 $2,000.000 $2,500.000
CURB RAMPS (TY 6)
EA 3.000 $2,000.000 $1,500.000 $2,000.000 $1,850.000 $2,000.000 $2,500.000
CURB RAMPS (TY 7)
EA 50.000 $2,000.000 $1,100.000 $1,800.000 $1,850.000 $2,000.000 $2,400.000
CURB RAMPS (TY 10)
EA 8.000 $1,800.000 $1,100.000 $1,700.000 $1,850.000 $2,000.000 $2,400.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 903.000 $190.000 $180.000 $150.000 $225.000 $85.000 $350.000
RELOCATE EXISTING MAILBOX
EA 3.000 $530.000 $200.000 $600.000 $350.000 $850.000 $500.000
RELOCATE RD IL ASM (SHOE-BASE)
EA 8.000 $1,000.000 $350.000 $2,500.000 $5,000.000 $2,500.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 51.000 $900.000 $850.000 $650.000 $500.000 $850.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 20.000 $650.000 $250.000 $500.000 $500.000 $650.000 $600.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,497.000 $8.000 $6.000 $6.000 $6.000 $8.000 $10.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 1,218.000 $0.900 $6.000 $1.000 $6.000 $6.000 $2.500
ELIM EXT PAV MRK & MRKS (6")
LF 480.000 $0.500 $6.000 $1.000 $6.000 $6.000 $2.500
ELIM EXT PAV MRK & MRKS (24")
LF 303.000 $3.500 $6.000 $6.000 $6.000 $8.000 $4.250
INSTALL OF PEDESTRIAN RAMPS
EA 8.000 $5,500.000 $1,500.000 $1,700.000 $1,000.000 $2,500.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $5,000.000 $9,999.000 $1.000 $16,500.000 $15,000.000
COVER (ADJUST)
EA 1.000 $960.000 $1,000.000 $1,000.000 $700.000 $850.000 $1,500.000
GROUND BOX (ADJUST)
EA 1.000 $700.000 $350.000 $1,000.000 $750.000 $850.000 $1,500.000
TMA (STATIONARY)
DAY 240.000 $250.000 $100.000 $222.000 $1.000 $250.000 $175.000
TMA (MOBILE OPERATION)
HR 120.000 $100.000 $50.000 $85.000 $1.000 $85.000 $90.000
REMOVE/REPLACE TIMBERS
LF 8.000 $20.000 $100.000 $100.000 $30.000 $1,000.000 $250.000
Totals: $2,467,500.700 $2,201,904.000 $2,399,999.990 $2,696,518.900 $2,790,505.000 $3,643,269.750