JOHNSON IH 35W (0014-04-086)

Items: 71

County: JOHNSON
Length: N/A
Highway: IH 35W
District: FORT WORTH
Control Number: 0014-04-086
DBE Goal: 600.0%
Project: F 2024(667)
Guaranty: N/A
Time: 278 WORKING DAYS
Engineer's Estimate: $19,894,216.62
Date: 02/01/2024 (2 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
DANIEL POOLE
SUCHITA POTTA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$19,894,216.62
$18,713,823.11
Over/Under Est: -5.93% -$1,180,393.51
Over/Under Est: 3.01% $597,822.90
Amt Left: 9.5% $1,778,216.41
Over/Under Est: 4.95% $983,944.71
Amt Left: 11.57% $2,164,338.22
Delta: -1.88% -$386,121.81
Subcontractor Percentage Amount
FORTSON CONTRACTING, INC. 4.28% $828,064.64
JR WEST TEXAS CONCRETE LLC 3.91% $756,479.61
O. TREVINO CONSTRUCTION, LLC 3.62% $700,372.43
STRIPE-A-ZONE, LLC 2.30% $444,988.01
IBCTX, LLC 0.89% $172,191.01
PROFESSIONAL TRAFFIC CONTROL LLC 0.28% $54,172.45
G J SEEDING, LLC 0.15% $29,020.96
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.13% $25,151.50
BRENDA PRICE TRUCKING, INC. 0.09% $17,412.57
DURABLE SPECIALTIES, INC. 0.06% $11,608.38
TEXAS HIGHWAY MAINTENANCE, LLC 0.00% $0.00
Total: 15.71% $3,039,461.56

Bid Items & Bid Tabulations

71 Total 0 of 71
JOHNSON  |  IH 35W  |  FORT WORTH  |  0014-04-086  |  02/01/2024  |  $19,894,216.62  |  F 2024(667)  |  RESURF ROADWAY  |  278 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NORTHEASTERN PAVERS, LLC
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
EXCAVATION (ROADWAY)
CY 150.000 $55.000 $70.000 $100.000 $65.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 350.000 $50.000 $95.000 $50.000 $83.000
BACKFILL (TY B)
STA 1,411.620 $300.000 $175.000 $130.000 $265.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 5,716.000 $1.750 $0.500 $0.430 $0.550
VEGETATIVE WATERING
MG 2,000.400 $55.000 $45.000 $1.000 $1.000
WILDFLOWER SEEDING
AC 1.170 $2,500.000 $3,500.000 $3,000.000 $3,650.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")
SY 2,500.000 $160.000 $115.000 $160.000 $148.000
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 190,937.000 $5.000 $2.500 $2.250 $3.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,131.000 $700.000 $700.000 $530.000 $675.000
CLEANING AND SEALING JOINTS
LF 2,855.000 $45.000 $85.000 $25.000 $72.000
HEADER TYPE EXPANSION JOINT
CF 239.000 $700.000 $600.000 $700.000 $555.000
MOBILIZATION
LS 1.000 $1,784,928.780 $1,500,000.000 $2,000,000.000 $1,789,817.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $20,000.000 $10,000.000 $50,000.000 $58,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,703.000 $5.000 $3.400 $1.000 $3.650
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,703.000 $2.000 $1.000 $0.500 $1.100
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 160.000 $7.500 $6.000 $6.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 160.000 $2.500 $3.000 $3.000 $3.750
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,360.000 $80.000 $125.000 $75.000 $75.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 510.000 $25.000 $23.000 $30.000 $28.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,360.000 $25.000 $28.000 $30.000 $32.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 182,786.000 $0.500 $0.200 $0.200 $0.140
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 64,508.000 $2.000 $0.500 $0.500 $0.800
MTL W-BEAM GD FEN (TIM POST)
LF 16,275.000 $25.000 $25.000 $22.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 68.000 $2,500.000 $2,100.000 $1,800.000 $2,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 38.000 $5,000.000 $1,275.000 $1,100.000 $1,250.000
REMOVE METAL BEAM GUARD FENCE
LF 15,800.000 $5.000 $3.500 $3.000 $3.300
REMOVE TERMINAL ANCHOR SECTION
EA 22.000 $400.000 $145.000 $125.000 $140.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 15.000 $500.000 $145.000 $125.000 $140.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 68.000 $410.000 $275.000 $250.000 $280.000
GUARDRAIL END TREATMENT (INSTALL)
EA 57.000 $3,450.000 $3,325.000 $2,852.000 $3,275.000
GUARDRAIL END TREATMENT (REMOVE)
EA 57.000 $450.000 $275.000 $250.000 $280.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $7,000.000 $3,500.000 $2,000.000 $2,250.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $5,500.000 $3,000.000 $1,500.000 $1,780.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $15,000.000 $20,000.000 $10,000.000 $11,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 96.000 $40.000 $20.000 $20.000 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 112.000 $40.000 $20.000 $20.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 252.000 $40.000 $38.000 $38.000 $42.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 172.000 $60.000 $38.000 $38.000 $42.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 38.000 $40.000 $20.000 $20.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 232.000 $100.000 $70.000 $70.000 $77.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 31.000 $10.000 $74.000 $74.000 $82.000
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
EA 37.000 $370.000 $400.000 $400.000 $450.000
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
EA 37.000 $500.000 $400.000 $400.000 $450.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 35,417.000 $0.500 $0.450 $0.160 $0.470
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 155,339.000 $0.500 $0.300 $0.160 $0.310
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 142,699.000 $0.500 $0.300 $0.160 $0.310
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,855.000 $3.000 $1.000 $1.000 $1.450
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 652.000 $3.000 $1.500 $1.000 $1.580
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 15,998.000 $2.000 $1.000 $1.100 $1.060
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 5,979.000 $5.000 $4.350 $2.450 $4.600
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 12.000 $355.000 $175.000 $145.000 $184.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 9,691.000 $3.000 $0.750 $0.900 $0.790
PAVEMENT SEALER 6"
LF 95,047.000 $0.820 $0.250 $0.230 $0.270
PAVEMENT SEALER 8"
LF 8,875.000 $2.000 $0.450 $0.250 $0.480
PAVEMENT SEALER 12"
LF 2,924.000 $2.000 $1.000 $0.970 $1.050
PAVEMENT SEALER (NUMBER)
EA 4.000 $45.000 $65.000 $31.000 $68.550
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 35,392.000 $1.150 $0.650 $0.830 $0.690
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 142,705.000 $1.000 $0.600 $0.830 $0.630
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 145,353.000 $1.000 $0.600 $0.830 $0.630
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 24.000 $15.000 $5.000 $4.000 $5.270
REFL PAV MRKR TY II-C-R
EA 2,627.000 $10.000 $4.750 $4.000 $5.000
PAV SURF PREP FOR MRK (6")
LF 95,047.000 $0.500 $0.170 $0.100 $0.180
PAV SURF PREP FOR MRK (8")
LF 8,875.000 $0.500 $0.350 $0.150 $0.370
PAV SURF PREP FOR MRK (12")
LF 2,924.000 $0.750 $0.950 $0.150 $1.000
PAV SURF PREP FOR MRK (NUMBER)
EA 4.000 $20.000 $50.000 $9.000 $53.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 65,750.000 $5.000 $4.750 $5.600 $5.400
MEMBRANE UNDERSEAL
GAL 91,541.000 $5.000 $3.750 $3.750 $4.070
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 70,112.000 $160.000 $172.500 $195.000 $188.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $2,500.000 $20,000.000 $10,000.000 $13,000.000
TMA (STATIONARY)
DAY 570.000 $200.000 $300.000 $1.000 $315.000
TMA (MOBILE OPERATION)
HR 5,312.000 $40.000 $0.010 $1.000 $0.010
Totals: $19,894,216.620 $18,713,823.110 $20,492,039.520 $20,878,161.330