Show Job Controls
Bid Cobra

JEFFERSON FM 366 (0667-02-117)

Items: 55

County: JEFFERSON
Length: N/A
Highway: FM 366
District: BEAUMONT
Control Number: 0667-02-117
DBE Goal: 0.0%
Project: C 667-2-117
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $3,892,159.96
Date: 02/02/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
DAVE COLLINS
RICHARD BRADLEY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,892,159.96
$5,074,278.87
Over/Under Est: 30.37% $1,182,118.91
$5,207,179.00
Over/Under Est: 33.79% $1,315,019.04
Amt Left: 2.62% $132,900.13
Over/Under Est: 38.55% $1,500,318.32
Amt Left: 6.27% $318,199.41
Delta: -3.56% -$185,299.28
Subcontractor Percentage Amount
SELECT MAINTENANCE, L.L.C. 49.35% $2,513,283.11
STRAIGHT LINE SAWING & SEALING, INC. 14.57% $742,016.92
DUSTROL, INC. 3.93% $200,145.95
TRP CONSTRUCTION GROUP, LLC 1.84% $93,707.01
AMERICAN REMEDIATION OPTIONS, INC. 1.03% $52,455.55
ODUM SERVICES, LLC 0.96% $48,890.61
BARRICADES UNLIMITED 0.21% $10,694.82
Total: 71.89% $3,661,193.97

Bid Items & Bid Tabulations

55 Total 0 of 55
JEFFERSON  |  FM 366  |  BEAUMONT  |  0667-02-117  |  02/02/2024  |  $3,892,159.96  |  C 667-2-117  |  SURF/ROADWAY RESTOR  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
FNH CONSTRUCTION, LLC
SELECT MAINTENANCE, L.L.C.
REMOVING CONC (CURB)
LF 300.000 $12.000 $11.000 $100.000 $10.000
ASPH (AC-20-5TR)
GAL 25,093.000 $5.000 $6.250 $10.000 $8.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 644.000 $225.000 $330.000 $350.000 $258.000
PLANE ASPH CONC PAV(1" TO 2")
SY 83,644.000 $1.700 $3.000 $10.000 $2.600
FULL - DEPTH REPAIR CPCD (10")
SY 837.000 $280.000 $700.000 $500.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 44.000 $595.000 $1,100.000 $550.000 $1,000.000
CLEANING AND SEALING EXISTING JOINTS
LF 10,000.000 $3.000 $11.000 $60.000 $12.000
MOBILIZATION
LS 1.000 $646,704.160 $500,000.000 $500,000.000 $540,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,000.000 $5,500.000 $20,000.000 $95,000.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 250.000 $1.500 $6.600 $4.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 500.000 $5.000 $5.500 $18.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $1.500 $6.000 $9.000 $1.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 250.000 $10.000 $17.600 $10.000 $15.000
CONC CURB (TY II)
LF 300.000 $22.500 $55.000 $65.000 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 850.000 $27.000 $40.500 $50.000 $32.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,350.000 $2,145.000 $1,850.000 $1,450.000
REMOVE METAL BEAM GUARD FENCE
LF 650.000 $4.000 $10.000 $5.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $210.000 $715.000 $500.000 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $150.000 $715.000 $500.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,050.000 $3,520.000 $3,500.000 $3,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $28,000.000 $34,100.000 $30,000.000 $28,000.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $695.000 $27,500.000 $5,000.000 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 28.000 $550.000 $1,072.000 $1,500.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $800.000 $1,182.000 $1,500.000 $650.000
REMOVE SM RD SN SUP&AM
EA 32.000 $89.000 $138.500 $500.000 $85.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 4,910.000 $0.500 $0.570 $2.000 $0.480
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 7,869.000 $0.250 $0.570 $2.000 $0.450
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,199.000 $0.750 $1.000 $5.000 $0.850
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 506.000 $7.000 $10.000 $20.000 $8.850
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 19.000 $150.000 $198.000 $250.000 $175.500
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 4.000 $200.000 $552.000 $1,000.000 $495.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 9.000 $105.000 $211.000 $250.000 $185.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 4,140.000 $0.400 $0.570 $1.000 $0.480
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 23,190.000 $0.250 $0.570 $1.000 $0.430
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,554.000 $3.000 $4.840 $2.000 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,450.000 $0.400 $5.800 $2.000 $1.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,199.000 $1.200 $1.500 $5.000 $1.200
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 4,910.000 $0.220 $0.780 $1.000 $0.670
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 7,869.000 $1.000 $0.770 $1.000 $0.620
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 4,140.000 $0.300 $0.770 $1.000 $0.670
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 23,190.000 $0.400 $0.780 $1.000 $0.620
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 506.000 $16.000 $20.000 $20.000 $17.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 19.000 $220.000 $313.500 $250.000 $280.000
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $16.000 $390.500 $250.000 $350.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $640.000 $896.500 $250.000 $805.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 506.000 $14.000 $17.500 $25.000 $15.500
REFL PAV MRKR TY I-C
EA 236.000 $5.000 $6.600 $5.000 $5.500
REFL PAV MRKR TY II-A-A
EA 847.000 $5.000 $6.800 $5.000 $5.500
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 1,568.000 $200.000 $203.500 $200.000 $140.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 11,729.000 $69.000 $104.500 $25.000 $40.000
TOM-C PG76-22 SAC-A
TON 4,601.000 $250.000 $260.000 $250.000 $450.000
TACK COAT
GAL 8,364.000 $4.500 $8.000 $6.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,100.000 $14,500.000 $16,500.000 $60,000.000
TMA (STATIONARY)
DAY 50.000 $280.000 $390.000 $250.000 $500.000
TMA (MOBILE OPERATION)
DAY 10.000 $200.000 $250.000 $550.000 $500.000
Totals: $3,892,159.960 $5,074,278.870 $5,207,179.000 $5,392,478.280