JEFFERSON SH 73 (0306-03-139)

Items: 85

County: JEFFERSON
Length: N/A
Highway: SH 73
District: BEAUMONT
Control Number: 0306-03-139
DBE Goal: 150.0%
Project: BR 2024(688)
Guaranty: N/A
Time: 269 WORKING DAYS
Engineer's Estimate: $11,486,993.50
Date: 02/01/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$11,486,993.50
$10,927,787.80
Over/Under Est: -4.87% -$559,205.70
Over/Under Est: -2.1% -$241,418.62
Amt Left: 2.91% $317,787.08
Over/Under Est: -0.77% -$87,923.72
Amt Left: 4.31% $471,281.98
Delta: -1.36% -$153,494.90
$12,355,621.00
Over/Under Est: 7.56% $868,627.50
Amt Left: 13.07% $1,427,833.20
Delta: -8.39% -$956,551.22
Subcontractor Percentage Amount
RAGLE CONSTRUCTION, INC. 14.76% $1,750,324.80
TEXAS MATERIALS GROUP, INC. 4.59% $544,308.32
TRP CONSTRUCTION GROUP, LLC 3.97% $470,785.19
SKIDABRADER GROUP LLC 2.96% $351,013.65
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 1.42% $168,391.68
BARRICADES UNLIMITED 0.40% $47,434.28
AMERICAN REMEDIATION OPTIONS, INC. 0.34% $40,319.13
SELECT MAINTENANCE, L.L.C. 0.00% $0.00
KING GEORGE TRAFFIC SOLUTIONS LLC 0.00% $0.00
Total: 28.44% $3,372,577.05

Bid Items & Bid Tabulations

85 Total 0 of 85
JEFFERSON  |  SH 73  |  BEAUMONT  |  0306-03-139  |  02/01/2024  |  $11,486,993.50  |  BR 2024(688)  |  BRIDGE MAINT  |  269 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SOUTHERN ROAD & BRIDGE, LLC
RAGLE CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
CEKRA INC.
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 7.000 $100.000 $325.000 $750.000 $750.000 $100.000
LIME (HYDRATED LIME (SLURRY))
TON 13.000 $500.000 $425.000 $450.000 $2,000.000 $500.000
LIME TRT (SUBGRADE)(8")
SY 573.000 $10.000 $20.000 $20.000 $50.000 $5.000
PRIME COAT (MC-30)
GAL 115.000 $25.000 $200.000 $10.000 $46.200 $6.000
PLANE ASPH CONC PAV (1")
SY 12,568.000 $2.000 $4.000 $3.450 $9.350 $5.000
CL C CONC (FOOTING)
CY 1.900 $10,000.000 $11,500.000 $5,000.000 $16,500.000 $40,000.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 14.000 $1,000.000 $850.000 $600.000 $620.000 $1,000.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $200,000.000 $888,000.000 $1,530,000.000 $600,000.000 $500,000.000
MOBILIZATION
LS 1.000 $885,000.000 $1,100,000.000 $1,120,000.000 $1,210,000.000 $1,230,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $15,000.000 $42,500.000 $55,000.000 $28,200.000 $54,000.000
CONSTRUCTION PERIMETER FENCE
LF 1,275.000 $6.000 $6.000 $5.500 $4.400 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 30,886.000 $6.000 $5.000 $1.000 $4.180 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 30,886.000 $3.000 $2.000 $0.250 $1.100 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 23,220.000 $110.000 $95.000 $145.000 $92.000 $90.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 23,220.000 $15.000 $15.000 $12.000 $22.000 $10.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $2,000.000 $2,500.000 $1,200.000 $1,500.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $8,500.000 $13,800.000 $15,000.000 $10,000.000 $12,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 95.000 $25.000 $25.000 $18.000 $19.800 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 1.000 $10.000 $35.000 $27.000 $29.700 $28.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 95.000 $10.000 $25.000 $18.000 $19.800 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 1.000 $10.000 $35.000 $27.000 $29.700 $25.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 575.000 $10.000 $5.000 $2.350 $3.300 $6.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 11,450.000 $2.500 $1.500 $0.950 $1.080 $1.750
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 48,230.000 $0.750 $1.500 $0.950 $1.080 $1.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 4,670.000 $1.750 $1.800 $0.950 $1.320 $2.500
WK ZN PAV MRK REMOV (W)(WORD)
EA 2.000 $500.000 $350.000 $350.000 $231.000 $300.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 47,779.000 $1.500 $1.500 $0.950 $1.080 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,540.000 $1.350 $1.900 $1.300 $1.540 $1.000
PAVEMENT SEALER 6"
LF 57,270.000 $1.000 $0.450 $0.140 $0.220 $0.250
PAVEMENT SEALER 8"
LF 1,350.000 $1.500 $0.800 $0.170 $0.440 $0.300
PAVEMENT SEALER 24"
LF 24.000 $1.000 $2.000 $0.970 $1.650 $2.500
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 23,630.000 $1.000 $1.100 $0.950 $0.830 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 23,940.000 $0.900 $1.100 $0.950 $0.830 $0.750
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 9,700.000 $16.000 $13.000 $4.650 $10.510 $15.500
PREFAB PAV MRK TY B (W)(NUMBER)
EA 2.000 $500.000 $685.000 $419.000 $511.500 $500.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 24.000 $25.000 $32.000 $25.000 $23.100 $20.000
REFL PAV MRKR TY II-A-A
EA 6.000 $10.000 $10.000 $5.000 $5.500 $7.000
REFL PAV MRKR TY II-C-R
EA 486.000 $12.000 $8.000 $5.000 $5.340 $6.500
ELIM EXT PAV MRK & MRKS (6")
LF 77,960.000 $5.000 $0.780 $0.240 $0.550 $0.600
ELIM EXT PAV MRK & MRKS (NUMBER)
EA 2.000 $100.000 $5.000 $75.000 $0.770 $150.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $100.000 $60.000 $75.000 $44.000 $100.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 160.000 $10.000 $3.000 $2.000 $2.200 $2.000
PAV SURF PREP FOR MRK (6")
LF 57,270.000 $1.000 $0.400 $0.250 $0.020 $0.100
PAV SURF PREP FOR MRK (8")
LF 1,350.000 $1.500 $1.000 $0.250 $0.040 $0.200
PAV SURF PREP FOR MRK (24")
LF 24.000 $1.000 $1.000 $0.250 $0.550 $1.000
REP METAL POST W/ BASE PLATE(T4(A)RAIL
EA 11.000 $12,000.000 $2,200.000 $1,000.000 $2,650.000 $3,000.000
REP STL BRIDGE MEMBERS
LS 1.000 $120,000.000 $92,500.000 $250,000.000 $171,000.000 $85,000.000
REP STL BRIDGE MEMBER (BEAM)
EA 20.000 $10,000.000 $3,250.000 $5,000.000 $2,800.000 $7,500.000
REP STL BRIDGE MEMBER (TRUSS VERTICAL)
EA 16.000 $5,000.000 $2,500.000 $5,500.000 $1,800.000 $9,800.000
REP STL BRIDGE MEMBER(TRUSS SWAY BRACE)
EA 2.000 $20,000.000 $11,500.000 $8,550.000 $15,000.000 $10,500.000
REP STL BRIDGE MEMBER (BEARINGS)
EA 4.000 $5,000.000 $12,500.000 $5,300.000 $7,777.000 $9,000.000
REP STL BRIDGE MEMBER (TOP CHORD)
EA 2.000 $10,000.000 $7,850.000 $6,940.000 $1,800.000 $10,500.000
REP STL BRIDGE MEMBER (SPLICE PLATE)
EA 1.000 $20,000.000 $12,500.000 $9,350.000 $15,500.000 $30,000.000
REP STL BRIDGE MEMBER (ANGLE PLATES)
EA 10.000 $6,000.000 $4,500.000 $5,400.000 $1,800.000 $17,500.000
REP STL BRIDGE MEMBER (BATTEN PLATES)
EA 12.000 $10,000.000 $8,500.000 $6,090.000 $7,800.000 $10,500.000
REP STL BRIDGE MEMBER (GIRDER)
EA 24.000 $25,000.000 $54,500.000 $14,600.000 $19,500.000 $22,000.000
REP STL BRIDGE MEMBER (STIFF)
EA 13.000 $4,000.000 $4,850.000 $6,525.000 $7,650.000 $17,000.000
REP STL BRIDGE MEMBER(REPL RIVET/BOLT)
EA 1,200.000 $500.000 $333.000 $90.000 $252.000 $350.000
REP STL BRIDGE MEMBER(LATERAL BRACING)
EA 2.000 $20,000.000 $28,500.000 $12,150.000 $14,000.000 $14,500.000
REP STL BRIDGE MEMBER (BOTTOM BRACE)
EA 12.000 $30,000.000 $9,250.000 $12,700.000 $16,000.000 $45,000.000
REP STL BRIDGE MEMBER (TOP BRACE)
EA 31.000 $5,000.000 $5,250.000 $10,500.000 $5,750.000 $7,500.000
REP STEEL BRIDGE MEMBER (PINS)
EA 4.000 $75,000.000 $6,850.000 $27,150.000 $67,000.000 $78,000.000
REP STL BRDG MEMB (FLANGE REPAIR)
EA 7.000 $20,500.000 $38,350.000 $17,850.000 $38,000.000 $42,000.000
REP STL BRDG MEMB (STRUT)
EA 3.000 $20,000.000 $12,500.000 $17,560.000 $32,000.000 $36,000.000
REP STL BRDG MEMB (WEB REPAIR TYPE 1)
EA 28.000 $60,000.000 $14,250.000 $22,000.000 $59,500.000 $40,000.000
REP STL BRDG MEMB (WEB REPAIR TYPE 2)
EA 4.000 $20,000.000 $28,250.000 $12,800.000 $30,000.000 $17,000.000
REP STL BRDG MEMB (WEB REPAIR TYPE 3)
EA 7.000 $5,000.000 $1,250.000 $5,540.000 $2,800.000 $10,500.000
REP STL BRDG MEMB (WELD REPAIR)
EA 17.000 $5,000.000 $2,200.000 $1,650.000 $2,500.000 $19,500.000
REP STL BRDG MEMB (TRUSS SWAY FRAME)
EA 4.000 $26,000.000 $33,500.000 $20,300.000 $30,000.000 $48,000.000
REP STL BRDG MEMB (DRAIN HOLE RETROFIT)
EA 1.000 $5,000.000 $1,850.000 $2,150.000 $5,000.000 $30,000.000
REP STL BRG MEMB (REP EXIST PANEL)
EA 8.000 $5,000.000 $3,350.000 $3,680.000 $1,800.000 $7,800.000
REP STL BRG MEMB (REM AND REPL GRATE)
EA 12.000 $5,000.000 $12,500.000 $9,200.000 $8,500.000 $5,200.000
BRIDGE JOINT REPAIR (FINGER JNT)
LF 60.000 $500.000 $1,250.000 $100.000 $450.000 $350.000
D-GR HMA TY-B PG64-22
TON 252.000 $200.000 $300.000 $250.000 $297.000 $225.000
D-GR HMA TY-D PG64-22
TON 573.000 $200.000 $425.000 $350.000 $415.800 $225.000
TACK COAT
GAL 1,388.000 $20.000 $25.000 $8.000 $19.250 $10.000
RE-STRAP EXISTING CONDUIT
EA 1.000 $5,000.000 $2,500.000 $3,500.000 $107,000.000 $9,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $25,000.000 $20,000.000 $31,000.000 $25,000.000
TMA (STATIONARY)
DAY 270.000 $350.000 $450.000 $100.000 $100.000 $375.000
TMA (MOBILE OPERATION)
DAY 5.000 $750.000 $2,500.000 $500.000 $1,000.000 $875.000
TEMP Q-DETECT SYS
EA 1.000 $120,000.000 $68,500.000 $50,000.000 $40,000.000 $38,000.000
TEMP SPEED MONITOR SYS
EA 3.000 $30,000.000 $25,000.000 $17,000.000 $22,000.000 $19,000.000
TEMP TRAVEL TIME SYS
EA 1.000 $60,000.000 $65,000.000 $45,000.000 $140,000.000 $115,000.000
TEMP INCIDENT DETECT & SURVEIL SYS
EA 1.000 $100,000.000 $98,250.000 $70,000.000 $336,000.000 $278,000.000
WATER FILLED BARRIER (350)(TL-3)
LF 180.000 $85.000 $165.000 $100.000 $270.000 $1,100.000
Totals: $11,486,993.500 $10,927,787.800 $11,245,574.880 $11,399,069.780 $12,355,621.000