JASPER FM 1131 (0784-02-011)

Items: 64

County: JASPER
Length: 3.2530 MILES
Highway: FM 1131
District: BEAUMONT
Control Number: 0784-02-011
DBE Goal: 0.0%
Project: F 2026(914)
Guaranty: $75,000.00
Time: 91 WORKING DAYS
Engineer's Estimate: $3,763,963.81
Date: 1:00 PM AUGUST 05, 2026 (in 5 weeks)
Contract Number: 8263024
Type: PREVENTIVE MAINTENANCE
Project ID: A00219820
Contract Type: Federal
Project Description: FM 1131-(FM 2246 SOUTH TO FM 105) OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRYCE BROUSSARD
JASPER FM 1131 (0784-02-011)
Project Name: N/A
Project: F 2026(914)
Length: 1.2530 MILES
Project Type: CONSTRUCTION
Limits From: FM 2246, SOUTH
Limits To: FM 105
Project Description: FM 1131-(FM 2246 SOUTH TO FM 105) OVERLAY
JASPER FM 1131 (0784-03-020)
Project Name: FM 1131-(FM 105 N TO 2 MI SOUTH) SHLDRS
Project: F 2026(913)
Length: 2.0000 MILES
Project Type: SAFETY IMPROVEMENT PROJECTS
Limits From: AT FM 105 N, SOUTH
Limits To: 2 MILES SOUTH
Project Description: FM 1131-(FM 105 N, SOUTH 2 MILES SOUTH) CONSTRUCT PAVED SHOULDERS (1-4 FT)
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

64 Total 0 of 64
JASPER  |  FM 1131  |  BEAUMONT  |  0784-02-011  |  1:00 PM AUGUST 05, 2026  |  $3,763,963.81  |  F 2026(914)  |  PREVENT MAINT  |  91 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 165.000
SUBGR WIDEN (OC)
STA 106.000
EMBANK (FNL)(OC)(TY C)
CY 30.000
BACKFILL (TY A OR B)
STA 165.000
BLADING
HR 131.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 10.000
BROADCAST SEED (TEMP_WARM)
SY 7,427.000
BROADCAST SEED (TEMP_COOL)
SY 7,427.000
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 14,854.000
VEGETATIVE WATERING
TGL 128.000
ASPH (AC-20-5TR)
GAL 23,150.000
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 495.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 4,169.000
TACK COAT
GAL 948.000
SP MIXES SP-C SAC-A PG76-22
TON 7,073.000
TACK COAT
GAL 3,858.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 643.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 4,995.000
CL C CONC (RAC-R)
CY 7.500
RIPRAP (MOW STRIP)(4 IN)
CY 49.000
RAIL (TY T223)
LF 50.000
RC PIPE (CL III)(15 IN)
LF 92.000
RC PIPE (CL III)(18 IN)
LF 196.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 12.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 90.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 5.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 34.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000
REMOV STR (PIPE)
LF 143.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 93.000
TMA (STATIONARY)
DAY 91.000
TMA (MOBILE OPERATION)
DAY 6.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 80.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 120.000
DRIVEWAYS (CONC)
SY 93.000
DRIVEWAYS (ACP)
SY 874.000
DRIVEWAYS (BASE)
SY 4,465.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 32,890.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 16,545.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 24.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000
REMOVE SM RD SN SUP&AM
EA 9.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 4.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 3.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 6.000
INSTL OM SM RD SIGN (1-OM-PW)R
EA 4.000
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 34,446.000
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 7,020.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 20,125.000
PREFAB PM TY C (W)(24")(SLD)
LF 155.000
PREFAB PM TY C (W)(RR XING)
EA 2.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 34.000
REFL PAV MRKR TY II-A-A
EA 504.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $15,000.00