PREPARING ROW
|
STA
|
695.130
|
$2,800.000
|
$650.000
|
$165.000
|
$2,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
1,037.000
|
$5.500
|
$18.000
|
$26.000
|
$6.000
|
|
|
REMOV STAB BASE & ASPH PAV (8"-20")
|
SY
|
36,703.000
|
$12.000
|
$25.000
|
$15.000
|
$12.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
37,464.000
|
$10.500
|
$12.000
|
$23.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
17,339.000
|
$16.000
|
$18.000
|
$30.000
|
$30.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
184,513.000
|
$1.350
|
$1.100
|
$1.290
|
$1.800
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
184,513.000
|
$0.550
|
$0.460
|
$0.540
|
$0.460
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
92,257.000
|
$0.450
|
$0.420
|
$0.500
|
$0.400
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
92,257.000
|
$0.450
|
$0.420
|
$0.550
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
12,918.000
|
$10.500
|
$2.000
|
$56.000
|
$18.600
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
15,097.000
|
$70.000
|
$78.000
|
$82.000
|
$72.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
576.000
|
$260.000
|
$345.000
|
$375.000
|
$390.000
|
|
|
LIME TRT (NEW BASE)(8")
|
SY
|
31,971.000
|
$4.500
|
$8.000
|
$16.500
|
$6.500
|
|
|
CEMENT
|
TON
|
480.000
|
$270.000
|
$345.000
|
$375.000
|
$460.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
31,971.000
|
$4.500
|
$8.000
|
$7.500
|
$6.000
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
19,184.000
|
$8.800
|
$6.500
|
$6.000
|
$6.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
54,659.000
|
$7.000
|
$5.000
|
$5.450
|
$5.650
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
614.000
|
$170.000
|
$200.000
|
$231.000
|
$155.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
540.000
|
$225.000
|
$200.000
|
$254.000
|
$155.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 6")
|
SY
|
9,115.000
|
$5.000
|
$6.000
|
$6.500
|
$9.100
|
|
|
CEM STABIL BKFL
|
CY
|
517.000
|
$130.000
|
$210.000
|
$240.000
|
$276.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
344.000
|
$150.000
|
$50.000
|
$186.000
|
$400.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,789.000
|
$30.000
|
$48.000
|
$27.000
|
$35.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
47.000
|
$550.000
|
$700.000
|
$850.000
|
$720.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
501.000
|
$140.000
|
$260.000
|
$326.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
196.000
|
$560.000
|
$750.000
|
$755.000
|
$720.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
92.000
|
$75.000
|
$76.000
|
$74.000
|
$80.500
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
49.000
|
$75.000
|
$134.000
|
$80.000
|
$87.400
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
548.000
|
$300.000
|
$360.000
|
$175.000
|
$201.250
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
72.000
|
$1,200.000
|
$1,250.000
|
$870.000
|
$1,000.500
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
6.000
|
$1,450.000
|
$1,200.000
|
$1,600.000
|
$1,840.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
16.000
|
$1,300.000
|
$1,300.000
|
$1,135.000
|
$1,305.250
|
|
|
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
|
LF
|
20.000
|
$1,500.000
|
$1,500.000
|
$1,470.000
|
$1,690.500
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
20.000
|
$1,800.000
|
$1,700.000
|
$1,680.000
|
$1,932.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
620.000
|
$70.000
|
$80.000
|
$58.000
|
$66.700
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
62.000
|
$110.000
|
$115.000
|
$88.000
|
$101.200
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
30.000
|
$135.000
|
$175.000
|
$160.000
|
$184.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
22.000
|
$185.000
|
$240.000
|
$210.000
|
$241.500
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
6.000
|
$300.000
|
$400.000
|
$450.000
|
$517.500
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
12.000
|
$430.000
|
$470.000
|
$680.000
|
$782.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$7,800.000
|
$32,000.000
|
$6,000.000
|
$6,900.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$9,000.000
|
$10,500.000
|
$8,400.000
|
$9,660.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$9,500.000
|
$12,500.000
|
$8,400.000
|
$9,660.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$10,500.000
|
$18,000.000
|
$15,000.000
|
$17,250.000
|
|
|
HEADWALL (CH - FW - 15) (DIA= 36 IN)
|
EA
|
1.000
|
$9,500.000
|
$12,000.000
|
$9,500.000
|
$10,925.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 54 IN)
|
EA
|
1.000
|
$12,000.000
|
$21,000.000
|
$28,500.000
|
$32,775.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,500.000
|
$6,200.000
|
$5,600.000
|
$6,440.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
2.000
|
$16,000.000
|
$14,500.000
|
$12,800.000
|
$14,720.000
|
|
|
WINGWALL (FW - 0) (HW=9 FT)
|
EA
|
2.000
|
$30,000.000
|
$63,000.000
|
$56,000.000
|
$64,400.000
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
1.000
|
$18,000.000
|
$45,000.000
|
$40,000.000
|
$46,000.000
|
|
|
WINGWALL (PW - 1) (HW=14 FT)
|
EA
|
2.000
|
$60,000.000
|
$185,000.000
|
$176,000.000
|
$202,400.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$1,200.000
|
$1,600.000
|
$1,200.000
|
$1,860.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
3.000
|
$2,200.000
|
$2,100.000
|
$1,600.000
|
$2,320.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$2,400.000
|
$3,700.000
|
$2,800.000
|
$3,220.000
|
|
|
REMOV STR (PIPE)
|
EA
|
7.000
|
$390.000
|
$210.000
|
$500.000
|
$1,550.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,563,327.310
|
$1,400,000.000
|
$1,160,000.000
|
$2,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$9,900.000
|
$20,000.000
|
$32,000.000
|
$24,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
2,460.000
|
$39.000
|
$40.000
|
$36.040
|
$34.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,460.000
|
$12.400
|
$10.000
|
$15.990
|
$11.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
31,704.000
|
$3.500
|
$4.000
|
$4.110
|
$4.050
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
31,704.000
|
$0.750
|
$0.500
|
$1.010
|
$1.150
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
31,704.000
|
$5.000
|
$4.000
|
$4.110
|
$4.050
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
31,704.000
|
$1.550
|
$0.400
|
$1.010
|
$1.150
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$5,200.000
|
$5,500.000
|
$13,000.000
|
$8,750.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,980.000
|
$65.000
|
$70.000
|
$115.000
|
$95.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,980.000
|
$13.000
|
$40.000
|
$45.000
|
$24.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,980.000
|
$18.000
|
$30.000
|
$35.000
|
$24.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,561.000
|
$50.000
|
$100.000
|
$62.000
|
$50.000
|
|
|
TURNOUTS (ACP)
|
SY
|
12.000
|
$60.000
|
$2,000.000
|
$450.000
|
$85.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
101,410.000
|
$0.220
|
$0.160
|
$0.220
|
$0.170
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
48,557.000
|
$0.350
|
$0.160
|
$0.390
|
$0.130
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,000.000
|
$27.000
|
$30.000
|
$26.500
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,300.000
|
$2,300.000
|
$2,400.000
|
$2,250.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
50.000
|
$90.000
|
$125.000
|
$52.000
|
$115.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,575.000
|
$2.500
|
$7.000
|
$2.000
|
$3.450
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$200.000
|
$700.000
|
$200.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$3,200.000
|
$3,900.000
|
$3,325.000
|
$3,425.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
11.000
|
$270.000
|
$600.000
|
$200.000
|
$550.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
22.000
|
$1,300.000
|
$4,000.000
|
$1,500.000
|
$2,750.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$900.000
|
$4,000.000
|
$2,500.000
|
$2,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$14,000.000
|
$10,000.000
|
$13,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
3.000
|
$260.000
|
$300.000
|
$275.000
|
$305.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$520.000
|
$600.000
|
$550.000
|
$745.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
21.000
|
$700.000
|
$900.000
|
$775.000
|
$775.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$850.000
|
$1,000.000
|
$875.000
|
$935.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
$1,090.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,250.000
|
$1,100.000
|
$990.000
|
$1,185.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$1,200.000
|
$1,100.000
|
$990.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$1,350.000
|
$1,300.000
|
$1,200.000
|
$1,340.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$700.000
|
$750.000
|
$655.000
|
$785.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$700.000
|
$850.000
|
$755.000
|
$920.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
22.000
|
$130.000
|
$90.000
|
$80.000
|
$103.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
54.000
|
$35.000
|
$60.000
|
$42.500
|
$47.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
74.000
|
$80.000
|
$90.000
|
$80.000
|
$101.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
17.000
|
$80.000
|
$90.000
|
$80.000
|
$106.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,820.000
|
$0.500
|
$1.150
|
$1.000
|
$2.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
1,330.000
|
$0.500
|
$1.150
|
$1.000
|
$2.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
73,805.000
|
$0.850
|
$1.100
|
$0.970
|
$1.150
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
37,705.000
|
$0.850
|
$1.100
|
$0.970
|
$1.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,207.000
|
$1.000
|
$2.000
|
$2.450
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,207.000
|
$1.000
|
$2.000
|
$2.550
|
$2.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,466.000
|
$1.250
|
$2.200
|
$2.000
|
$1.960
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
8,467.000
|
$0.470
|
$0.600
|
$0.510
|
$0.560
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
112,695.000
|
$0.500
|
$0.450
|
$0.390
|
$0.560
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
112,851.000
|
$0.500
|
$0.450
|
$0.390
|
$0.560
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
124.000
|
$15.000
|
$17.000
|
$15.000
|
$17.540
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
8.000
|
$525.000
|
$550.000
|
$500.000
|
$661.250
|
|
REFL PAV MRKR TY I-C
|
EA
|
426.000
|
$4.100
|
$8.000
|
$7.000
|
$5.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,411.000
|
$3.500
|
$6.500
|
$5.500
|
$5.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
76,600.000
|
$0.350
|
$0.400
|
$0.350
|
$0.580
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
19,073.000
|
$100.000
|
$137.000
|
$112.500
|
$118.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
27,386.000
|
$155.000
|
$163.000
|
$160.500
|
$172.000
|
|
|
TACK COAT
|
GAL
|
46,463.000
|
$5.000
|
$4.500
|
$5.100
|
$0.010
|
|
|
TMA (STATIONARY)
|
DAY
|
994.000
|
$185.000
|
$300.000
|
$425.000
|
$230.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
28.000
|
$210.000
|
$300.000
|
$925.000
|
$230.000
|
|
Totals: |
$17,136,600.450
|
$18,488,018.580
|
$18,798,818.440
|
$20,076,480.570
|