HUDSPETH IH 10 (0002-07-057)

Items: 31

County: HUDSPETH
Length: N/A
Highway: IH 10
District: EL PASO
Control Number: 0002-07-057
DBE Goal: 0.0%
Project: C 2-7-57
Guaranty: N/A
Time: 80 WORKING DAYS
Engineer's Estimate: $860,190.26
Date: 02/01/2024 (2 years ago)
Contract Number: N/A
Type: INFRASTRUCTURE IMPROVEMENTS
Mail/Deliver Bids To: N/A
ARMANDO RAMIREZ2
ALDO MADRID
MONICA RUIZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$860,190.26
$922,152.50
Over/Under Est: 7.2% $61,962.24
Subcontractor Percentage Amount
SYNERGY PROJECT CONTRACTORS, INC. 3.85% $35,502.87
Total: 3.85% $35,502.87

Bid Items & Bid Tabulations

31 Total 0 of 31
HUDSPETH  |  IH 10  |  EL PASO  |  0002-07-057  |  02/01/2024  |  $860,190.26  |  C 2-7-57  |  INFRASTRUCT IMPRVS  |  80 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TRI STATE ELECTRIC, LTD.
PREPARING ROW
AC 0.600 $10,000.000 $3,000.000
EXCAVATION (SPECIAL)
CY 1.250 $1,800.000 $2,500.000
DRILL SHAFT (42 IN)
LF 63.000 $986.000 $645.000
DRILL SHAFT (48 IN)
LF 60.000 $1,175.000 $750.000
RIPRAP (CONC)(4 IN)
CY 7.500 $1,100.000 $600.000
RIPRAP (MOW STRIP)(4 IN)
CY 11.000 $719.190 $675.000
MOBILIZATION
LS 1.000 $50,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $14,500.000 $12,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 20.000 $8.630 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 20.000 $3.290 $5.000
MTL W-BEAM GD FEN (STEEL POST)
LF 140.000 $95.000 $32.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $6,500.000 $3,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $7,500.000 $6,500.000
CONDT (PVC) (SCH 40) (2")
LF 1,405.000 $32.000 $30.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,090.000 $38.000 $50.000
ELEC CONDR (NO.4) INSULATED
LF 2,685.000 $4.110 $3.000
ELEC CONDR (NO.3) INSULATED
LF 1,635.000 $4.000 $3.500
ELEC CONDR (NO.1) INSULATED
LF 1,660.000 $4.890 $3.750
ELEC CONDR (NO.3/0) INSULATED
LF 2,980.000 $5.000 $12.000
GROUND BOX TY A (122311)W/APRON
EA 17.000 $1,250.000 $1,650.000
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
EA 5.000 $10,302.500 $9,000.000
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $59,000.000 $55,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $58.590 $35.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $550.000 $250.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 3.000 $2,250.000 $1,250.000
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $26,333.330 $42,000.000
ITS POLE (55 FT)(90 MPH)
EA 3.000 $25,964.860 $19,000.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 3.000 $8,500.000 $4,500.000
TMA (STATIONARY)
DAY 54.000 $425.000 $225.000
SYSTEM INTEGRATION
LS 1.000 $34,833.330 $35,000.000
INSTALLATION OF CELLULAR MODEM
EA 5.000 $2,500.000 $1,250.000
Totals: $860,190.260 $922,152.500