HOUSTON CR 1170 (0911-28-082)

Items: 49

County: HOUSTON
Length: 0.0000 MILES
Highway: CR 1170
District: LUFKIN
Control Number: 0911-28-082
DBE Goal: 0.0%
Project: BR 2025(034)
Guaranty: $68,000.00
Time: 445 WORKING DAYS
Engineer's Estimate: $2,474,314.40
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263229
Type: BRIDGE REPLACEMENT
Project ID: A00194392
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES - HBP
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESSE SISCO
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

49 Total 0 of 49
HOUSTON  |  CR 1170  |  LUFKIN  |  0911-28-082  |  1:00 PM AUGUST 06, 2026  |  $2,474,314.40  |  BR 2025(034)  |  BRIDGE REPL  |  445 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 19.220
EXCAV (ROADWAY)
CY 3,030.000
EMBANK (FNL)(OC)(TY B)
CY 1,331.000
BLOCK SODDING
SY 500.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 4,715.000
BOND FBR MTRX SEED (TEMP)(WARM)
SY 2,358.000
BOND FBR MTRX SEED (TEMP)(COOL)
SY 2,358.000
VEGETATIVE WATERING
TGL 198.800
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 3,503.000
CEM STABIL BKFL
CY 322.000
DRILL SHAFT (24 IN)
LF 555.000
DRILL SHAFT (30 IN)
LF 930.000
CL C CONC (ABUT)
CY 130.200
REINF CONC SLAB (BOX BEAM)
SF 5,626.000
REINF CONC SLAB (SLAB BEAM)
SF 2,600.000
SHEAR KEY
CY 40.700
PRESTR CONC SLAB BEAM (5SB15)
LF 500.000
PRESTR CONC BOX BEAM (4B20)
LF 496.000
PRESTR CONC BOX BEAM (5B20)
LF 248.000
PRESTR CONC BOX BEAM (4B34)
LF 358.000
PRESTR CONC BOX BEAM (5B34)
LF 179.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 2,246.000
RAIL (TY T223)
LF 786.000
TYPE A JOINT
LF 267.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 5.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 195.000
ROCK FILTER DAMS (REMOVE)
LF 195.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 560.000
CONSTRUCTION EXITS (REMOVE)
SY 560.000
CONSTRUCTION PERIMETER FENCE
LF 198.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,100.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,100.000
DRIVEWAYS (BASE)
SY 35.000
MTL W-BEAM GD FEN (TIM POST)
LF 425.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000
MTL BM GD FEN TRANS (NON - SYM)
EA 10.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000
GATE (REMOVE)
EA 1.000
WIRE FENCE (TY A)
LF 406.000
WIRE FENCE (TY C)
LF 1,908.000
GATE (TY 1)
EA 1.000
WIRE FENCE (WATER GAP)
LF 493.000
REMOVE SM RD SN SUP&AM
EA 10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 28.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 42.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
Total: $3,000.00