Show Job Controls
Bid Cobra

HOPKINS SL 301 (0400-03-015)

Items: 51

County: HOPKINS
Length: N/A
Highway: SL 301
District: PARIS
Control Number: 0400-03-015
DBE Goal: N/A
Project: BR 2022(802)
Guaranty: N/A
Time: 250 WORKING DAYS
Engineer's Estimate: $1,394,680.00
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JESSE HERRERA
DUSTIN LYDAY
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,394,680.00
$1,347,538.80
Over/Under Est: -3.38% -$47,141.20
$1,452,649.38
Over/Under Est: 4.16% $57,969.38
Amt Left: 7.8% $105,110.58
Over/Under Est: 15.02% $209,514.60
Amt Left: 19.05% $256,655.80
Delta: -10.43% -$151,545.22
Over/Under Est: 22.75% $317,234.00
Amt Left: 27.04% $364,375.20
Delta: -6.71% -$107,719.40
Subcontractor Percentage Amount
SOUTHERN CROSS CONTRACTORS, LLC 7.49% $102,797.60
FLEX SUPPLY, LLC 1.82% $24,978.86
HERMANOS STEEL, LLC 0.36% $4,940.87
A. E. MOORE CONSTRUCTION, INC. 0.24% $3,293.92
Total: 9.91% $136,011.25

Bid Items & Bid Tabulations

51 Total 0 of 51
HOPKINS  |  SL 301  |  PARIS  |  0400-03-015  |  08/03/2022  |  $1,394,680.00  |  BR 2022(802)  |  BRIDGE REPL  |  250 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
THK CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 14.810 $2,000.000 $2,000.000 $1,800.000 $4,000.000 $5,000.000
EXCAVATION (ROADWAY)
CY 127.000 $15.000 $20.000 $20.000 $50.000 $27.000
EXCAVATION (CHANNEL)
CY 479.000 $20.000 $20.000 $18.000 $30.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,203.000 $30.000 $38.420 $18.000 $30.000 $30.000
BROADCAST SEED (TEMP) (WARM)
SY 2,119.000 $1.000 $0.250 $0.250 $2.000 $1.500
BROADCAST SEED (TEMP) (COOL)
SY 2,119.000 $1.000 $0.250 $0.250 $2.000 $1.500
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 4,239.000 $2.000 $0.600 $2.000 $2.000 $2.000
VEGETATIVE WATERING
MG 52.200 $20.000 $10.000 $10.000 $1.000 $40.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 2,274.000 $27.000 $35.000 $34.000 $40.000 $25.000
CEM STABIL BKFL
CY 124.000 $190.000 $180.000 $280.000 $250.000 $300.000
DRILL SHAFT (24 IN)
LF 351.000 $165.000 $122.370 $213.000 $180.000 $230.000
DRILL SHAFT (36 IN)
LF 192.000 $250.000 $243.410 $215.000 $200.000 $250.000
CL C CONC (ABUT)
CY 76.800 $1,100.000 $1,361.000 $1,000.000 $1,200.000 $1,400.000
CL C CONC (CAP)
CY 7.700 $900.000 $1,500.000 $1,500.000 $2,000.000 $1,500.000
CL C CONC (COLUMN)
CY 3.500 $950.000 $800.000 $1,800.000 $2,000.000 $1,600.000
REINF CONC SLAB
SF 1,690.000 $20.000 $34.040 $30.000 $28.000 $32.000
REINF CONC SLAB (SLAB BEAM)
SF 2,990.000 $25.000 $19.780 $25.000 $28.000 $25.000
PRESTR CONC SLAB BEAM (5SB15)
LF 567.120 $225.000 $213.360 $292.750 $295.000 $300.000
PRESTR CONC GIRDER (TX28)
LF 258.000 $250.000 $213.360 $239.000 $295.000 $300.000
RIPRAP (CONC)(4 IN)
CY 8.000 $600.000 $400.000 $500.000 $650.000 $800.000
RIPRAP (CONC)(5 IN)
CY 32.000 $625.000 $500.000 $500.000 $650.000 $800.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 15.000 $175.000 $180.000 $267.000 $200.000 $155.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 663.000 $150.000 $150.000 $144.000 $200.000 $155.000
RIPRAP (MOW STRIP)(4 IN)
CY 28.000 $450.000 $600.000 $575.000 $550.000 $600.000
RAIL (TY T631LS)
LF 444.000 $75.000 $66.000 $76.500 $75.000 $80.000
CONC BOX CULV (5 FT X 2 FT)
LF 57.000 $280.000 $582.450 $1,158.000 $950.000 $800.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $6,500.000 $10,000.000 $7,700.000 $5,000.000 $8,500.000
REMOV & RE - LAY PIPE (18 IN)
LF 12.000 $50.000 $30.000 $167.000 $150.000 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $13,000.000 $10,000.000 $5,000.000 $12,000.000 $15,000.000
REMOV STR (PIPE)
EA 1.000 $300.000 $5,000.000 $500.000 $10,000.000 $10,000.000
MOBILIZATION
LS 1.000 $126,789.000 $125,000.000 $130,000.000 $140,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $2,000.000 $1,600.000 $1,300.000 $2,500.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 268.000 $35.000 $21.000 $45.000 $5.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 268.000 $8.000 $9.000 $1.000 $5.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $25.000 $25.000 $2.000 $1.000 $32.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $6.000 $8.000 $1.000 $1.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,412.000 $2.500 $2.550 $5.000 $1.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,412.000 $1.000 $0.550 $1.000 $1.000 $1.000
CONSTRUCTING DETOURS
SY 1,276.000 $130.000 $70.000 $88.000 $82.000 $100.000
MTL W-BEAM GD FEN (STEEL POST)
LF 750.000 $30.000 $34.000 $36.250 $35.000 $38.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $3.000 $2.000 $2.630 $3.000 $3.000
MTL BM GD FEN (REMOVE & REINSTALL)
LF 200.000 $18.000 $15.000 $15.750 $15.000 $17.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,000.000 $3,025.000 $3,177.000 $3,050.000 $3,300.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 8.000 $1,200.000 $1,400.000 $1,100.000 $1,000.000 $1,100.000
GATE (REMOVE)
EA 1.000 $1,250.000 $100.000 $700.000 $500.000 $800.000
WIRE FENCE (TY C)
LF 447.000 $17.000 $17.000 $28.000 $20.000 $25.000
REMOVE SM RD SN SUP&AM
EA 8.000 $100.000 $100.000 $200.000 $500.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $65.000 $45.000 $47.250 $25.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $40.000 $21.000 $26.250 $25.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $40.000 $22.000 $26.250 $25.000 $30.000
D-GR HMA TY-C SAC-A PG64-22(EXEMPT)
TON 108.000 $150.000 $180.000 $313.000 $300.000 $350.000
Totals: $1,394,680.000 $1,347,538.803 $1,452,649.380 $1,604,194.600 $1,711,914.000