County: HOPKINS Highway: SL 301 Date: 08/03/2022 (2 years ago) Engineer's Estimate: $1,394,680 Control Number: 0400-03-015
Project: BR 2022(802) District: PARIS Time: 250 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,394,680.00
HIGHWAY 19 CONSTRUCTION LLC   $1,347,538.80 1
-3.38% | -$47,141.20
THK CONSTRUCTION LLC   $1,452,649.38 2
4.16% | $57,969.38
7.8% | $105,110.58
HODGES AND SON CONSTRUCTION COMPANY, INC.   $1,604,194.60 3
15.02% | $209,514.60
19.05% | $256,655.80
10.43% | $151,545.22
EAST TEXAS BRIDGE, INC.   $1,711,914.00 4
22.75% | $317,234.00
27.04% | $364,375.20
6.71% | $107,719.40
Subcontractor Percentage Amount
SOUTHERN CROSS CONTRACTORS, LLC 7.62% $102,682.46
FLEX SUPPLY, LLC 1.85% $24,929.47
HERMANOS STEEL, LLC 0.37% $4,985.89
A. E. MOORE CONSTRUCTION, INC. 0.24% $3,234.09
Total: 10.08% $135,831.91

Bid Items

Items: 51, 0 filtered
HOPKINS SL 301  |  PARIS  |  0400-03-015  |  08/03/2022  |  $1,394,680  |  BR 2022(802)  |  BRIDGE REPL  |  250 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HIGHWAY 19 CONSTRUCTION LLC THK CONSTRUCTION LLC HODGES AND SON CONSTRUCTION COMPANY, INC. EAST TEXAS BRIDGE, INC.
100 6002 PREPARING ROW STA 14.810 $2,000.000 $2,000.000 $1,800.000 $4,000.000 $5,000.000
110 6001 EXCAVATION (ROADWAY) CY 127.000 $15.000 $20.000 $20.000 $50.000 $27.000
110 6002 EXCAVATION (CHANNEL) CY 479.000 $20.000 $20.000 $18.000 $30.000 $25.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 1,203.000 $30.000 $38.420 $18.000 $30.000 $30.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 2,119.000 $1.000 $0.250 $0.250 $2.000 $1.500
164 6011 BROADCAST SEED (TEMP) (COOL) SY 2,119.000 $1.000 $0.250 $0.250 $2.000 $1.500
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 4,239.000 $2.000 $0.600 $2.000 $2.000 $2.000
168 6001 VEGETATIVE WATERING MG 52.200 $20.000 $10.000 $10.000 $1.000 $40.000
247 6064 FL BS (CMP IN PLC)(TY A GR 4) (6") SY 2,274.000 $27.000 $35.000 $34.000 $40.000 $25.000
400 6005 CEM STABIL BKFL CY 124.000 $190.000 $180.000 $280.000 $250.000 $300.000
416 6002 DRILL SHAFT (24 IN) LF 351.000 $165.000 $122.370 $213.000 $180.000 $230.000
416 6004 DRILL SHAFT (36 IN) LF 192.000 $250.000 $243.410 $215.000 $200.000 $250.000
420 6013 CL C CONC (ABUT) CY 76.800 $1,100.000 $1,361.000 $1,000.000 $1,200.000 $1,400.000
420 6029 CL C CONC (CAP) CY 7.700 $900.000 $1,500.000 $1,500.000 $2,000.000 $1,500.000
420 6037 CL C CONC (COLUMN) CY 3.500 $950.000 $800.000 $1,800.000 $2,000.000 $1,600.000
422 6001 REINF CONC SLAB SF 1,690.000 $20.000 $34.040 $30.000 $28.000 $32.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 2,990.000 $25.000 $19.780 $25.000 $28.000 $25.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 567.120 $225.000 $213.360 $292.750 $295.000 $300.000
425 6035 PRESTR CONC GIRDER (TX28) LF 258.000 $250.000 $213.360 $239.000 $295.000 $300.000
432 6001 RIPRAP (CONC)(4 IN) CY 8.000 $600.000 $400.000 $500.000 $650.000 $800.000
432 6002 RIPRAP (CONC)(5 IN) CY 32.000 $625.000 $500.000 $500.000 $650.000 $800.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 15.000 $175.000 $180.000 $267.000 $200.000 $155.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 663.000 $150.000 $150.000 $144.000 $200.000 $155.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 28.000 $450.000 $600.000 $575.000 $550.000 $600.000
450 6019 RAIL (TY T631LS) LF 444.000 $75.000 $66.000 $76.500 $75.000 $80.000
462 6006 CONC BOX CULV (5 FT X 2 FT) LF 57.000 $280.000 $582.450 $1,158.000 $950.000 $800.000
467 6171 SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C) EA 4.000 $6,500.000 $10,000.000 $7,700.000 $5,000.000 $8,500.000
472 6004 REMOV & RE - LAY PIPE (18 IN) LF 12.000 $50.000 $30.000 $167.000 $150.000 $50.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 4.000 $13,000.000 $10,000.000 $5,000.000 $12,000.000 $15,000.000
496 6016 REMOV STR (PIPE) EA 1.000 $300.000 $5,000.000 $500.000 $10,000.000 $10,000.000
500 6001 MOBILIZATION LS 1.000 $126,789.000 $125,000.000 $130,000.000 $140,000.000 $150,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 $2,000.000 $1,600.000 $1,300.000 $2,500.000 $4,000.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 268.000 $35.000 $21.000 $45.000 $5.000 $35.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 268.000 $8.000 $9.000 $1.000 $5.000 $11.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 156.000 $25.000 $25.000 $2.000 $1.000 $32.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 156.000 $6.000 $8.000 $1.000 $1.000 $11.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,412.000 $2.500 $2.550 $5.000 $1.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,412.000 $1.000 $0.550 $1.000 $1.000 $1.000
508 6001 CONSTRUCTING DETOURS SY 1,276.000 $130.000 $70.000 $88.000 $82.000 $100.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 750.000 $30.000 $34.000 $36.250 $35.000 $38.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 450.000 $3.000 $2.000 $2.630 $3.000 $3.000
542 6006 MTL BM GD FEN (REMOVE & REINSTALL) LF 200.000 $18.000 $15.000 $15.750 $15.000 $17.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 12.000 $3,000.000 $3,025.000 $3,177.000 $3,050.000 $3,300.000
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 8.000 $1,200.000 $1,400.000 $1,100.000 $1,000.000 $1,100.000
550 6006 GATE (REMOVE) EA 1.000 $1,250.000 $100.000 $700.000 $500.000 $800.000
552 6003 WIRE FENCE (TY C) LF 447.000 $17.000 $17.000 $28.000 $20.000 $25.000
644 6076 REMOVE SM RD SN SUP&AM EA 8.000 $100.000 $100.000 $200.000 $500.000 $100.000
658 6047 INSTL OM ASSM (OM-2Y)(WC)GND EA 4.000 $65.000 $45.000 $47.250 $25.000 $50.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 12.000 $40.000 $21.000 $26.250 $25.000 $30.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 18.000 $40.000 $22.000 $26.250 $25.000 $30.000
3076 6067 D-GR HMA TY-C SAC-A PG64-22(EXEMPT) TON 108.000 $150.000 $180.000 $313.000 $300.000 $350.000
Totals: $1,394,680.00 $1,347,538.80 $1,452,649.38 $1,604,194.60 $1,711,914.00