HIDALGO FM 907 (1586-01-085)

Items: 124

County: HIDALGO
Length: 2.5100 MILES
Highway: FM 907
District: PHARR
Control Number: 1586-01-085
DBE Goal: 0.0%
Project: F 2026(988)
Guaranty: $100,000.00
Time: 354 WORKING DAYS
Engineer's Estimate: $6,597,423.30
Date: 1:00 PM AUGUST 05, 2026 (in 5 weeks)
Contract Number: 8263016
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00131912
Contract Type: Federal
Project Description: REHABILITATE ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
HIDALGO FM 907 (1586-01-085)
Project Name: N/A
Project: F 2026(988)
Length: 2.5100 MILES
Project Type: CONSTRUCTION
Limits From: RANCHO BLANCO RD.
Limits To: FM 3072
Project Description: REHABILITATE ROADWAY
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

124 Total 0 of 124
HIDALGO  |  FM 907  |  PHARR  |  1586-01-085  |  1:00 PM AUGUST 05, 2026  |  $6,597,423.30  |  F 2026(988)  |  REHAB EXIST ROADWAY  |  354 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 128.000
REMOV CONC (RIPRAP)
SY 30.000
REMOV CONC (DRIVEWAYS)
SY 26.000
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
SY 737.000
EXCAV (ROADWAY)
CY 10,662.000
EXCAV (CHANNEL)
CY 499.000
EMBANK (FNL)(OC)(TY B)
CY 2,819.000
EMBANK (FNL)(DC)(TY C)
CY 17,981.000
BACKFILL (TY A)
STA 128.000
FURN & PLACE TOPSOIL (VEH)
CY 50.000
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 53,745.000
HYDRO MULCH SEED (TEMP_WARM)
SY 53,745.000
VEGETATIVE WATERING
TGL 1,167.000
SPRINKLING (DUST CONTROL)
TGL 512.000
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
CY 10,462.000
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 125,556.000
REWORK BS MTL (TY B)(6")(DC)(ORG POS)
CY 10,464.000
LIME (COM OR QK)(SLURRY)
TON 1,726.000
LIME TRT (EXIST MATL)(12")
SY 69,752.000
CEMENT
TON 704.000
CEMENT TRT (EXIST MATL & NEW BASE)(12")
SY 62,778.000
SALV,HAUL & STKPL RCL APH PV (0 TO 3")
SY 61,902.000
PRIME COAT (MC-30)
GAL 12,116.000
ASPH (TIER II)
GAL 18,176.000
AGGR (TY-B GR-4P SAC-B)
CY 491.000
SP MIXES SP-D SAC-A PG76-22
TON 10,797.000
PLANE & TEXT ASPH CONC PAV(1.5")
SY 5,087.000
PLANE & TEXT ASPH CONC PAV(3")
SY 600.000
PLANE & TEXT ASPH CONC PAV(0" TO 1.5")
SY 365.000
STRUCT EXCAV (SPECIAL)
CY 187.000
CUT & RESTORING PAV
SY 496.000
CEM STABIL BKFL
CY 171.000
TRENCH EXCAVATION PROTECTION
LF 1,025.000
RETAINING WALL (TEMP WALL)
SF 4,215.000
RIPRAP (CONC) (CL B) (4 IN)
CY 92.000
RIPRAP (CONC)(CL B)(5 IN)
CY 240.000
RIPRAP (MOW STRIP)(4 IN)
CY 84.000
RETROFIT RAIL (TY T631)
LF 275.000
RC PIPE (CL III)(18 IN)
LF 1,536.000
RC PIPE (CL IV)(18 IN)
LF 173.000
RC PIPE (CL IV)(24 IN)
LF 215.000
RC PIPE (CL IV)(30 IN)
LF 184.000
RC PIPE (CL IV)(36 IN)
LF 80.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 2.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 60.000
JACK BOR OR TUN PIPE(30 IN)(RC)(CL IV)
LF 88.000
REMOV STR (INLET)
EA 2.000
REMOV STR (SET)
EA 57.000
REMOV STR (PIPE)
LF 2,164.000
REMOV STR (IRRIGATION GATE)
EA 2.000
REMOVE STR (IRRIGATON WELL & GATE)
EA 1.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000
TMA (STATIONARY)
DAY 354.000
TMA (MOBILE OPERATION)
DAY 20.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 312.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,545.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,545.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,002.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,002.000
PCTB (FUR&INST)(F-SHAPE OR SNGL SLP)TY1
LF 1,170.000
PCTB (MOVE)(F-SHAPE OR SNGL SLP)TY1
LF 1,170.000
PCTB (REMOVE)(F-SHAPE OR SNGL SLP)TY1
LF 1,170.000
DRIVEWAYS (ACP)
SY 1,483.000
TURNOUTS (ACP)
SY 734.000
MTL W-BEAM GD FEN (TIM POST)
LF 900.000
REMOVE METAL BEAM GUARD FENCE
LF 1,448.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000
ALUMINUM SIGNS (TY A)
SF 31.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 12.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 13.000
REMOVE SM RD SN SUP&AM
EA 22.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 34.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 10.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 12,583.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 12,693.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 13,704.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 53.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 13,779.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,400.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,200.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 188.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 89.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 485.000
RE PM TY III (W)(6")(SLD)
LF 100.000
RE PM TY III (Y)(6")(SLD)
LF 50.000
RE PM TY III (Y)(6")(BRK)
LF 20.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 26,348.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 160.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 2,910.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 8,456.000
PREFAB PM TY C (W)(ARROW)
EA 2.000
PREFAB PM TY C (W)(WORD)
EA 2.000
REFL PAV MRKR TY I-C
EA 18.000
REFL PAV MRKR TY II-A-A
EA 390.000
TRAFFIC BUTTON TY Y
EA 836.000
TRAFFIC BUTTON TY B
EA 3,976.000
ELIM EXT PM & MRKS (4")
LF 15,540.000
ELIM EXT PM & MRKS (6")
LF 27,433.000
ELIM EXT PM & MRKS (8")
LF 190.000
ELIM EXT PM & MRKS (24")
LF 53.000
ELIM EXT PM & MRKS (ARROW)
EA 2.000
ELIM EXT PM & MRKS (WORD)
EA 2.000
PAV SURF PREP FOR MRK (6")
LF 200.000
PAV SURF PREP FOR MRK (ARROW)
EA 2.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000
PRSSR IRRIG PVC PIPE (18")
LF 290.000
PRSSR IRRIG PVC PIPE (24")
LF 240.000
PRSSR IRRIG PVC PIPE (12")
LF 10.000
36" IRRIGATION WELL
EA 1.000
IRRIGATION WELL GATE (18”)
EA 1.000
IRRIGATION FARM OUTLET & VALVE
EA 3.000
BONDING COURSE
GAL 4,592.000
WELDED STL CASING PIPE (OPEN CUT)(24")
LF 183.000
WELDED STL CASING PIPE (OPEN CUT)(30")
LF 180.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $60,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $120,000.00
Total: $180,000.00