HENDERSON SH 19 (0108-03-041)

Items: 124

County: HENDERSON
Length: 0.0000 MILES
Highway: SH 19
District: TYLER
Control Number: 0108-03-041
DBE Goal: 0.0%
Project: C 108-3-41
Guaranty: $100,000.00
Time: 300 WORKING DAYS
Engineer's Estimate: $20,755,210.28
Date: 09/06/2024 (1 year ago)
Contract Number: 9243204
Type: HIGHWAY IMPROVEMENT
Project ID: A00059358
Project Description: WIDEN 2 LN ROADWAY FOR PASSING LANES-SUPER2
Mail/Deliver Bids To: N/A
DANNY HENDERSON
EDUARDO CASTANEDA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$20,755,210.28
$13,887,918.16
Over/Under Est: -33.09% -$6,867,292.12
$16,584,648.30
Over/Under Est: -20.09% -$4,170,561.98
Amt Left: 19.42% $2,696,730.14
$17,511,205.34
Over/Under Est: -15.63% -$3,244,004.94
Amt Left: 26.09% $3,623,287.18
Delta: -5.59% -$926,557.04
$20,210,735.15
Over/Under Est: -2.62% -$544,475.13
Amt Left: 45.53% $6,322,816.99
Delta: -15.42% -$2,699,529.81
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO., INC. 7.88% $1,121,293.86
COLD CREEK CONSTRUCTION, LTD 4.57% $650,293.52
FORTSON CONTRACTING, INC. 1.66% $236,211.65
STRIPING TECHNOLOGY, L.P. 1.54% $219,136.11
J. H. ODEN CONTRACTING COMPANY 1.29% $183,562.07
MURRAY CONSTRUCTION 0.50% $71,148.09
SURFACE PREPARATION TECHNOLOGIES, LLC 0.33% $46,957.74
DIAMOND ELITE BARRICADES, LLC 0.24% $34,151.08
CHEROKEE SERVICES 0.12% $17,075.54
FLEX SUPPLY, LLC 0.03% $4,268.89
NEXT CONSTRUCTION SOLUTIONS LLC 0.00% $0.00
Total: 18.16% $2,584,098.55

Bid Items & Bid Tabulations

124 Total 0 of 124
HENDERSON  |  SH 19  |  TYLER  |  0108-03-041  |  09/06/2024  |  $20,755,210.28  |  C 108-3-41  |  HWY IMPRV  |  300 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
REYNOLDS & KAY, LTD.
A. L. HELMCAMP, INC.
TRUE ROADS, LLC
PREPARING ROW
STA 476.810 $2,000.000 $2,000.000 $2,600.000 $2,500.000 $5,000.000
REMOV CONC (MOWSTRIP)
LF 3,402.000 $17.140 $15.000 $14.000 $12.000 $10.000
REMOV CONC (DRIVEWAYS)
SY 150.000 $36.000 $25.000 $28.000 $55.000 $28.500
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 6,938.000 $4.650 $12.000 $6.750 $15.000 $5.000
EXCAV (ROADWAY)
CY 13,074.000 $35.000 $24.000 $9.750 $40.000 $26.000
EMBANK (FNL)(DC)(TY C)
CY 4,283.000 $30.000 $24.000 $34.000 $40.000 $32.000
BACKFILL (TY A)
STA 339.700 $496.500 $275.000 $525.000 $350.000 $450.000
FURN & PLACE TOPSOIL (4")
SY 88,865.000 $3.500 $1.250 $3.700 $2.200 $5.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 44,436.000 $0.210 $0.150 $0.120 $0.140 $0.160
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 44,436.000 $0.600 $0.580 $0.600 $0.560 $0.680
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 44,436.000 $0.600 $0.580 $0.630 $0.560 $0.680
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 88,865.000 $1.200 $0.600 $0.700 $0.580 $0.700
VEGETATIVE WATERING
TGL 977.500 $332.650 $25.000 $25.000 $20.000 $25.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 8,360.000 $43.000 $86.000 $110.000 $135.000 $125.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 253.000 $450.000 $350.000 $350.000 $325.000 $450.000
LIME TRT (EXIST MATL)(8")
SY 12,232.000 $5.000 $7.000 $6.500 $9.000 $10.000
CEMENT
TON 253.000 $350.000 $275.000 $300.000 $250.000 $335.000
CEMENT TRT (EXIST MATL)(8")
SY 12,232.000 $5.000 $7.000 $5.750 $9.000 $6.500
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 2,139.000 $8.160 $6.000 $7.000 $7.500 $9.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 112,135.000 $7.000 $3.500 $4.450 $4.250 $7.000
AGGR (TY-PD, GR-4)(SAC-A)
CY 2,670.000 $200.000 $135.000 $195.000 $150.000 $280.000
SP MIXES SP-B PG64-22
TON 1,453.000 $260.000 $135.000 $203.000 $186.000 $210.000
SP MIXES SP-C PG70-22
TON 21,032.000 $184.670 $135.000 $186.000 $190.000 $185.000
SP MIXES SP-C SAC-B PG70-22
TON 11,624.000 $272.000 $135.000 $171.000 $185.000 $195.000
TACK COAT
GAL 26,739.000 $4.700 $4.000 $3.050 $4.000 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,500.000 $85.000 $65.000 $65.000 $88.000 $85.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 3,500.000 $163.000 $85.000 $82.000 $110.000 $105.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 187,543.000 $4.500 $3.250 $2.950 $2.500 $4.000
FLOWABLE BACKFILL
CY 33.000 $518.370 $350.000 $600.000 $370.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 86.000 $50.000 $20.000 $10.000 $22.000 $40.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 111.000 $279.040 $250.000 $175.000 $530.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 259.000 $747.750 $650.000 $755.000 $1,000.000 $720.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 346.000 $211.770 $225.000 $400.000 $320.000 $350.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 360.000 $58.000 $60.000 $70.000 $68.000 $65.000
RAIL (TY T631)
LF 500.000 $99.600 $80.000 $90.000 $90.000 $125.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 8.000 $770.000 $850.000 $1,800.000 $700.000 $2,300.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 19.000 $1,400.000 $1,000.000 $1,600.000 $750.000 $2,400.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 4.000 $1,050.000 $1,050.000 $1,850.000 $800.000 $2,500.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 16.000 $842.000 $1,100.000 $1,400.000 $920.000 $2,500.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 11.000 $990.000 $1,200.000 $2,100.000 $960.000 $2,600.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 15.000 $1,400.000 $1,400.000 $1,800.000 $1,100.000 $2,300.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 3.000 $1,200.000 $1,600.000 $3,300.000 $1,300.000 $4,600.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 10.000 $1,287.000 $1,800.000 $2,200.000 $1,400.000 $3,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $25,996.290 $15,000.000 $15,000.000 $7,400.000 $17,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 5.000 $21,616.030 $20,000.000 $15,000.000 $13,000.000 $17,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 5.000 $34,278.690 $25,000.000 $21,500.000 $15,000.000 $21,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $33,000.000 $30,000.000 $28,000.000 $17,000.000 $29,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $67,000.000 $50,000.000 $36,000.000 $28,000.000 $32,000.000
SET (REPLACE PIPE RUNNER)
EA 9.000 $9,583.330 $5,000.000 $100.000 $1,000.000 $6,000.000
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C)
EA 2.000 $11,000.000 $10,000.000 $16,000.000 $7,900.000 $13,000.000
SET (TY I)(S= 3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $17,000.000 $12,000.000 $16,000.000 $8,500.000 $14,000.000
SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $13,950.000 $15,000.000 $22,000.000 $8,900.000 $18,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1)(C)
EA 1.000 $17,000.000 $17,000.000 $30,000.000 $13,000.000 $18,000.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1)(C)
EA 1.000 $10,992.310 $20,000.000 $26,000.000 $14,000.000 $19,000.000
SET (TY I)(S= 7 FT)(HW= 7 FT)(4:1)(C)
EA 1.000 $12,700.000 $30,000.000 $45,000.000 $16,000.000 $42,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 109.000 $1,750.000 $1,200.000 $1,150.000 $1,000.000 $1,100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $2,450.000 $1,600.000 $2,400.000 $2,600.000 $1,800.000
THERMOPLASTIC PIPE (PP) (18")
LF 2,752.000 $81.000 $0.000 $0.000 $0.000 $0.000
THERMOPLASTIC PIPE (PP) (24")
LF 239.000 $134.000 $0.000 $0.000 $0.000 $0.000
CLEAN EXIST CULVERTS
EA 24.000 $3,400.000 $2,000.000 $5,000.000 $2,600.000 $2,700.000
CLEAN EXIST CULVERTS
CY 1,120.000 $53.000 $35.000 $16.000 $50.000 $110.000
REMOV STR (PIPE)
EA 54.000 $826.180 $475.000 $850.000 $1,600.000 $500.000
MOBILIZATION
LS 1.000 $1,752,733.450 $1,300,000.000 $1,185,000.000 $1,450,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $7,500.000 $7,500.000 $7,500.000 $28,400.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $18,342.000 $15,000.000 $20,000.000 $25,000.000 $25,000.000
TMA (STATIONARY)
DAY 50.000 $350.000 $500.000 $200.000 $350.000 $225.000
TMA (MOBILE OPERATION)
DAY 50.000 $305.000 $550.000 $200.000 $100.000 $225.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,600.000 $42.000 $35.000 $35.000 $35.000 $42.000
ROCK FILTER DAMS (REMOVE)
LF 1,600.000 $12.700 $12.000 $13.000 $12.000 $14.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 1,000.000 $73.000 $35.000 $20.000 $23.000 $45.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 150.000 $124.090 $180.000 $55.000 $120.000 $300.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,145.000 $4.750 $5.000 $4.000 $4.300 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,145.000 $2.480 $1.000 $0.750 $0.750 $1.000
INTERSECTIONS (ACP)
SY 2,054.000 $68.000 $55.000 $75.000 $77.000 $100.000
DRIVEWAYS (CONC) (HES)
SY 150.000 $145.000 $150.000 $160.000 $260.000 $180.000
DRIVEWAYS (ACP)
SY 7,688.000 $100.000 $55.000 $75.000 $58.000 $70.000
TURNOUTS (ACP)
SY 257.000 $100.000 $55.000 $133.000 $77.000 $140.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 68,260.000 $0.340 $0.300 $0.350 $0.150 $0.150
MILL RUMBLE STRIPS (CONC) (SHLDR)
LF 25,623.000 $0.340 $0.500 $0.700 $0.150 $0.650
MILL RUMBLE STRIPS (CONC) (CENTERLINE)
LF 46,805.000 $0.340 $0.500 $0.750 $0.150 $0.650
MTL W-BEAM GD FEN (STEEL POST)
LF 2,138.000 $38.790 $35.000 $30.000 $27.000 $35.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 350.000 $99.600 $80.000 $108.000 $97.000 $120.000
REMOVE METAL BEAM GUARD FENCE
LF 2,496.000 $4.380 $3.000 $3.000 $2.000 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 32.000 $3,028.570 $3,200.000 $3,300.000 $2,900.000 $3,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $358.500 $300.000 $225.000 $220.000 $250.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 12.000 $674.800 $500.000 $735.000 $690.000 $850.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 55.000 $334.760 $300.000 $360.000 $270.000 $340.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 6.000 $390.760 $325.000 $410.000 $290.000 $320.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $910.000 $800.000 $890.000 $640.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $965.000 $850.000 $1,040.000 $740.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,173.860 $1,100.000 $1,260.000 $950.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,279.900 $950.000 $1,175.000 $900.000 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 74.000 $672.000 $500.000 $475.000 $520.000 $550.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $663.000 $600.000 $600.000 $520.000 $750.000
REMOVE SM RD SN SUP&AM
EA 84.000 $147.860 $100.000 $110.000 $110.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 207.000 $52.430 $30.000 $28.000 $35.000 $34.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 62.000 $92.000 $50.000 $80.000 $75.000 $68.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 10,507.000 $1.100 $0.300 $0.350 $0.310 $0.380
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 187,068.000 $1.080 $0.300 $0.350 $0.310 $0.380
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 556.000 $7.520 $4.000 $4.500 $4.100 $5.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 300.000 $1.290 $1.000 $1.150 $1.000 $1.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 201,548.000 $4.210 $0.300 $0.350 $0.310 $0.380
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 4,750.000 $2.280 $1.000 $2.250 $0.400 $1.900
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 46,029.000 $2.940 $1.000 $2.250 $0.400 $1.900
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,583.000 $2.500 $1.500 $1.300 $0.750 $1.700
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 5,040.000 $2.500 $1.500 $1.300 $0.750 $1.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,840.000 $2.180 $1.500 $1.450 $1.400 $1.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 278.000 $9.210 $6.000 $6.500 $6.500 $7.500
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 1,430.000 $9.340 $6.000 $6.500 $6.500 $7.500
RE PM TY II (W) 6" (BRK)
LF 5,120.000 $1.000 $0.450 $0.450 $0.450 $0.500
RE PM TY II (W) 6" (DOT)
LF 571.000 $1.780 $1.000 $1.150 $1.100 $1.250
RE PM TY II (W) 6" (SLD)
LF 93,574.000 $1.250 $0.350 $0.350 $0.350 $0.380
RE PM TY II (Y) 6" (BRK)
LF 16,140.000 $0.990 $0.450 $0.450 $0.450 $0.500
RE PM TY II (Y) 6" (SLD)
LF 113,734.000 $1.250 $0.300 $0.450 $0.350 $0.380
PREFAB PM TY B (W)(ARROW)
EA 4.000 $600.000 $250.000 $275.000 $260.000 $315.000
PREFAB PM TY B (W)(U-LT ARROW)
EA 8.000 $1,200.000 $400.000 $450.000 $430.000 $500.000
PREFAB PM TY B (W)(WORD)
EA 8.000 $751.480 $300.000 $330.000 $320.000 $375.000
PREFAB PM TY B (Y)(6")(SLD)
LF 18.000 $5.500 $10.000 $11.000 $11.000 $12.500
REFL PAV MRKR TY I-C
EA 94.000 $6.500 $6.000 $6.500 $6.500 $7.500
REFL PAV MRKR TY II-A-A
EA 1,122.000 $6.800 $6.000 $5.500 $5.300 $6.250
FULL - WIDTH MOWING
CYC 4.000 $2,500.000 $5,500.000 $9,500.000 $4,500.000 $15,000.000
LITTER REMOVAL
CYC 6.000 $2,791.000 $6,000.000 $3,500.000 $3,000.000 $3,200.000
1
RC PIPE (CL III)(18 IN)
LF 2,752.000 $81.000 $65.000 $57.000 $72.000 $85.000
2
RC PIPE (CL III)(24 IN)
LF 239.000 $134.000 $100.000 $78.000 $180.000 $110.000
Totals: $21,010,148.285 $13,887,918.160 $16,584,648.300 $17,511,205.340 $20,210,735.150