Show Job Controls
Bid Cobra

HAYS RM 150 (1197-01-027)

Items: 86

County: HAYS
Length: 0.0000 MILES
Highway: RM 150
District: AUSTIN
Control Number: 1197-01-027
DBE Goal: 0.0%
Project: F 2026(856)
Guaranty: $63,000.00
Time: 352 WORKING DAYS
Engineer's Estimate: $3,130,181.38
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263223
Type: HIGHWAY IMPROVEMENT
Project ID: A00197439
Contract Type: Federal
Project Description: ADD SHOULDER, PROFILE STRIPING CENTER AND EDGELINE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
HAYS RM 150 (1197-01-027)
Project Name: N/A
Project: F 2026(856)
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: 0.476 MI SE OF DARDEN HILL RD
Limits To: RM 1826
Project Description: ADD SHOULDER, PROFILE STRIPING CENTER AND EDGELINE
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

86 Total 0 of 86
HAYS  |  RM 150  |  AUSTIN  |  1197-01-027  |  1:00 PM AUGUST 06, 2026  |  $3,130,181.38  |  F 2026(856)  |  HWY IMPRV  |  352 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 97.000
REMOV CONC (DRIVEWAYS)
SY 1,475.000
EXCAV (ROADWAY)
CY 9,098.000
EMBANK (FNL)(OC)(TY B)
CY 3,573.000
FURN & PLACE TOPSOIL (4")
SY 28,174.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 28,174.000
DRILL SEED (PERM_RURAL_CLAY)
SY 28,174.000
VEGETATIVE WATERING
TGL 475.000
SOIL RET BLKT(SL_STEEP_CLAY_LONG)
SY 28,174.000
SOIL RET BLKT(CHAN_TEMP_4 PSF)
SY 180.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 3,679.000
PRIME COAT (MULTI OPTION)
GAL 3,140.000
D-GR HMA TY-B PG64-22
TON 2,590.000
D-GR HMA TY-D PG76-22
TON 1,317.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 401.000
TOM-C PG76-22 SAC-B
TON 2,096.000
CUT & RESTORING PAV
SY 319.000
FLOWABLE BACKFILL
CY 81.000
TRENCH EXCAVATION PROTECTION
LF 99.000
RIPRAP (CONC)(4 IN)
CY 5.000
RIPRAP (MOW STRIP)(4 IN)
CY 119.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 136.000
CONC BOX CULV (6 FT X 3 FT)
LF 162.000
RC PIPE (CL III)(18 IN)
LF 273.000
RC PIPE (CL III)(24 IN)
LF 70.000
RC PIPE (CL III)(36 IN)
LF 110.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 380.000
RC PIPE (ARCH)(CL III)(DES 4)
LF 132.000
RC PIPE (ARCH)(CL III)(DES 5)
LF 176.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 1.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000
SET (TY II) (DES 3) (RCP) (3: 1) (C)
EA 2.000
SET (TY II) (DES 3) (RCP) (4: 1) (C)
EA 2.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 10.000
SET (TY II) (DES 4) (RCP) (4: 1) (C)
EA 2.000
SET (TY II) (DES 5) (RCP) (4: 1) (C)
EA 2.000
REMOV & RE - LAY PIPE (18 IN)
LF 223.000
REMOV STR (SET)
EA 50.000
REMOV STR (PIPE)
LF 1,298.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 50.000
TMA (MOBILE OPERATION)
HR 24.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 444.000
ROCK FILTER DAMS (REMOVE)
LF 444.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 43.000
CONSTRUCTION EXITS (REMOVE)
SY 43.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 422.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 422.000
CONSTRUCTING DETOURS
SY 2,045.000
DRIVEWAYS (CONC)
SY 765.000
DRIVEWAYS (ACP)
SY 1,670.000
TURNOUTS (ACP)
SY 507.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,715.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000
REMOVE METAL BEAM GUARD FENCE
LF 268.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 9.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 4.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 9.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 29.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000
REMOVE SM RD SN SUP&AM
EA 33.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 24.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 61,908.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 3,150.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 49,354.000
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 19,349.000
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 15,168.000
RE PROFILE PM TY I(Y)6"(BRK)(090MIL)
LF 3,371.000
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 130.000
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
LF 3,874.000
REFL PAV MRKR TY I-A
EA 62.000
REFL PAV MRKR TY II-A-A
EA 751.000
ELIM EXT PM & MRKS (4")
LF 49,354.000
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000
BONDING COURSE
GAL 4,818.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
Total: $45,000.00