HARRISON FM 3001 (3041-03-012)

Items: 87

County: HARRISON
Length: N/A
Highway: FM 3001
District: ATLANTA
Control Number: 3041-03-012
DBE Goal: N/A
Project: BR 2022(504)
Guaranty: N/A
Time: 343 WORKING DAYS
Engineer's Estimate: $4,206,746.70
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$4,206,746.70
$4,618,853.24
Over/Under Est: 9.8% $412,106.54
Over/Under Est: 24.74% $1,040,665.64
Amt Left: 13.61% $628,559.10
Over/Under Est: 25.41% $1,068,745.48
Amt Left: 14.22% $656,638.94
Delta: -0.54% -$28,079.84
Over/Under Est: 25.61% $1,077,228.40
Amt Left: 14.4% $665,121.86
Delta: -0.16% -$8,482.92
Over/Under Est: 40.49% $1,703,423.35
Amt Left: 27.96% $1,291,316.81
Delta: -11.85% -$626,194.95
Subcontractor Percentage Amount
FARR FOUNDATION, INC. 8.90% $408,514.04
A. E. MOORE CONSTRUCTION, INC. 3.10% $142,291.41
REYNOLDS & KAY, LTD. 2.33% $106,948.06
STRIPING TECHNOLOGY, L.P. 1.08% $49,572.49
DUSTIN ALLEN, INC. 0.82% $37,638.37
FLEX SUPPLY, LLC 0.48% $22,032.22
TEX OP CONSTRUCTION, LP 0.36% $16,524.16
TEX OP CONSTRUCTION, LP 0.19% $8,721.09
PRIMATE CONSTRUCTION, LP 0.18% $8,262.08
Total: 17.44% $800,503.92

Bid Items & Bid Tabulations

87 Total 0 of 87
HARRISON  |  FM 3001  |  ATLANTA  |  3041-03-012  |  05/05/2022  |  $4,206,746.70  |  BR 2022(504)  |  BRIDGE REPL  |  343 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
HODGES AND SON CONSTRUCTION COMPANY, INC.
RAYFORD'S TRUCK & TRACTOR
REMOVING CONC (RIPRAP)
SY 773.000 $20.000 $25.000 $18.000 $16.000 $7.000 $22.000
REMOVING CONC (APPR SLAB)
SY 115.000 $40.000 $55.000 $30.000 $47.000 $150.000 $60.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 2,298.000 $5.000 $15.000 $10.000 $6.250 $15.000 $9.500
EXCAVATION (ROADWAY)
CY 2,721.000 $12.000 $10.000 $14.000 $10.250 $10.000 $18.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 4,422.000 $25.000 $15.000 $18.000 $11.000 $15.000 $18.000
FURNISHING AND PLACING TOPSOIL (4")
SY 16,352.000 $2.000 $3.000 $2.000 $3.500 $2.000 $3.750
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 16,352.000 $0.750 $1.250 $0.650 $0.650 $0.700 $0.700
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 8,176.000 $0.750 $1.120 $0.660 $0.650 $0.250 $0.700
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 8,176.000 $0.750 $0.120 $0.630 $0.630 $0.250 $0.700
VEGETATIVE WATERING
MG 524.000 $10.000 $50.000 $5.000 $12.500 $1.000 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 1,074.000 $1.750 $1.250 $1.800 $1.800 $2.000 $2.000
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 1,219.000 $50.000 $45.000 $115.000 $120.000 $60.000 $140.000
CEMENT
TON 60.000 $175.000 $180.000 $225.000 $250.000 $200.000 $300.000
CEMENT TREAT (NEW BASE)(10")(DC)
SY 3,510.000 $5.000 $5.000 $4.000 $3.500 $6.000 $10.000
PRIME COAT (MC-30)
GAL 1,097.000 $6.000 $5.500 $5.000 $6.500 $8.000 $10.000
ASPH (AC-20-5TR)
GAL 6,159.000 $6.000 $7.000 $5.000 $5.350 $8.000 $12.000
AGGR(TY-PB GR-3 SAC-B)
CY 155.000 $110.000 $350.000 $175.000 $220.000 $400.000 $325.000
CEM STABIL BKFL
CY 178.000 $180.000 $250.000 $250.000 $220.000 $190.000 $310.000
TEMPORARY SPL SHORING
SF 1,388.000 $50.000 $55.000 $60.000 $45.000 $60.000 $75.000
DRILL SHAFT (36 IN)
LF 500.000 $275.000 $211.000 $265.000 $300.000 $240.000 $315.000
DRILL SHAFT (42 IN)
LF 1,680.000 $425.000 $255.000 $700.000 $750.000 $795.000 $780.000
CL C CONC (ABUT)(HPC)
CY 54.600 $1,110.000 $1,200.000 $1,200.000 $1,050.000 $1,500.000 $1,300.000
CL C CONC (CAP)(HPC)
CY 124.800 $1,200.000 $1,700.000 $1,250.000 $1,100.000 $1,500.000 $1,600.000
CL C CONC (COLUMN)(HPC)
CY 35.400 $1,200.000 $1,500.000 $1,200.000 $1,300.000 $1,500.000 $2,375.000
REINF CONC SLAB (HPC)
SF 19,320.000 $25.000 $26.000 $23.000 $22.500 $26.000 $27.000
APPROACH SLAB (HPC)
CY 105.200 $590.000 $550.000 $650.000 $850.000 $800.000 $800.000
PRESTR CONC GIRDER (TX28)
LF 2,499.000 $185.000 $216.000 $215.000 $200.000 $205.000 $210.000
RIPRAP (CONC)(CL B)
CY 6.000 $550.000 $1,000.000 $650.000 $650.000 $600.000 $865.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 2,221.000 $145.000 $150.000 $165.000 $210.000 $125.000 $190.000
BEDDING MATERIAL (6 IN)
CY 430.000 $100.000 $180.000 $170.000 $160.000 $120.000 $190.000
RIPRAP (MOW STRIP)(4 IN)
CY 41.000 $450.000 $550.000 $600.000 $535.000 $550.000 $635.000
RAIL (TY SSTR)(HPC)
LF 888.000 $85.000 $120.000 $100.000 $75.000 $140.000 $130.000
ARMOR JOINT
LF 88.000 $80.000 $180.000 $115.000 $130.000 $125.000 $100.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 138.000 $125.000 $65.000 $200.000 $210.000 $180.000 $205.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $60,000.000 $170,000.000 $130,000.000 $115,000.000 $150,000.000 $165,000.000
MOBILIZATION
LS 1.000 $385,000.000 $400,000.000 $480,000.000 $450,000.000 $470,000.000 $325,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $4,600.000 $2,000.000 $2,500.000 $3,000.000 $2,000.000 $3,200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 270.000 $30.000 $28.000 $34.000 $34.000 $1.000 $33.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 225.000 $55.000 $60.000 $50.000 $49.500 $1.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 495.000 $10.000 $10.000 $9.000 $9.000 $1.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 320.000 $25.000 $27.000 $29.000 $29.000 $1.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 320.000 $10.000 $10.000 $9.000 $9.000 $1.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,257.000 $2.850 $3.000 $3.250 $3.500 $1.000 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,257.000 $1.150 $1.000 $0.750 $0.800 $1.000 $0.750
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 570.000 $6.000 $5.000 $7.000 $6.600 $8.000 $6.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 570.000 $1.500 $1.000 $1.100 $1.100 $1.000 $1.100
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 18.000 $4,500.000 $7,500.000 $3,000.000 $6,000.000 $2,000.000 $6,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,640.000 $35.000 $83.000 $100.000 $70.000 $80.000 $100.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,640.000 $10.000 $25.000 $13.000 $17.000 $25.000 $16.000
DRIVEWAYS (ACP)
SY 148.000 $45.000 $75.000 $60.000 $70.000 $20.000 $80.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $25.000 $35.000 $29.000 $29.000 $28.000 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,850.000 $3,100.000 $2,000.000 $1,950.000 $2,000.000 $2,200.000
REMOVE METAL BEAM GUARD FENCE
LF 550.000 $2.000 $5.000 $2.200 $3.000 $2.000 $3.300
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $175.000 $2,750.000 $110.000 $110.000 $200.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $2,800.000 $3,400.000 $3,380.000 $3,200.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $270.000 $250.000 $220.000 $220.000 $500.000 $300.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $900.000 $2,000.000 $880.000 $880.000 $800.000 $265.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $12,000.000 $9,500.000 $9,600.000 $9,500.000 $9,000.000 $9,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $400.000 $900.000 $1,200.000 $750.000 $850.000 $1,250.000
REMOVE SM RD SN SUP&AM
EA 2.000 $90.000 $100.000 $100.000 $300.000 $200.000 $125.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $25.000 $35.000 $30.000 $22.000 $30.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 16.000 $30.000 $35.000 $30.000 $22.000 $30.000 $22.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 6,065.000 $0.400 $1.000 $0.550 $0.550 $0.500 $0.600
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 24.000 $5.000 $10.000 $8.800 $8.800 $10.000 $10.000
WK ZN PV MK NON-REM (Y)(4")SLD W/MRKR
LF 8,960.000 $2.000 $1.000 $1.100 $1.100 $1.000 $1.200
PAVEMENT SEALER 4"
LF 1,920.000 $0.500 $1.000 $0.550 $0.550 $0.500 $0.650
PREFAB PAV MRK TY B (W)(4")(SLD)
LF 960.000 $5.000 $7.000 $8.000 $8.250 $8.000 $8.500
PREFAB PAV MRK TY B (Y)(4")(SLD)
LF 960.000 $5.000 $7.000 $8.000 $8.250 $8.000 $8.500
REFL PAV MRKR TY II-A-A
EA 230.000 $3.500 $10.000 $4.500 $4.400 $5.000 $5.250
TRAFFIC BUTTON TY II-A-A
EA 34.000 $5.000 $15.000 $4.500 $4.400 $5.000 $5.250
TRAFFIC BUTTON TY Y
EA 102.000 $4.000 $8.000 $4.500 $4.400 $5.000 $4.500
ELIM EXT PAV MRK & MRKS (4")
LF 16,037.000 $0.600 $1.000 $0.550 $0.550 $0.600 $0.550
ELIM EXT PAV MRK & MRKS (24")
LF 24.000 $5.000 $10.000 $3.300 $3.300 $5.000 $3.500
PAV SURF PREP FOR MRK (4")
LF 1,920.000 $0.500 $1.000 $0.280 $0.280 $0.300 $0.300
PAV SURF PREP FOR MRK (RPM)
EA 22.000 $0.500 $5.000 $1.100 $1.100 $1.000 $1.200
SP MIXES SP-C PG70-22
TON 786.000 $120.000 $180.000 $170.000 $165.000 $150.000 $250.000
TACK COAT
GAL 583.000 $6.000 $3.000 $4.500 $6.000 $8.000 $8.000
TIP TESTING(DRILL SHAFT)
EA 4.000 $6,000.000 $500.000 $8,500.000 $4,500.000 $7,500.000 $7,500.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $350.000 $300.000 $500.000 $375.000 $500.000 $2,500.000
INSTALL FTB
LF 225.000 $40.000 $55.000 $50.000 $30.000 $25.000 $55.000
REMOVE FTB
LF 225.000 $10.000 $55.000 $15.000 $8.000 $5.000 $12.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $16,000.000 $19,000.000 $20,000.000 $18,000.000
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
LF 12,560.000 $0.500 $1.200 $0.700 $0.720 $0.750 $0.800
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
LF 7,070.000 $0.500 $1.200 $0.550 $0.550 $0.500 $0.550
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
LF 780.000 $0.500 $2.000 $0.550 $0.550 $0.500 $0.550
TMA (STATIONARY)
DAY 15.000 $160.000 $1,000.000 $300.000 $250.000 $200.000 $150.000
TMA (MOBILE OPERATION)
HR 60.000 $60.000 $50.000 $30.000 $55.000 $30.000 $75.000
Totals: $4,206,746.700 $4,618,853.240 $5,247,412.340 $5,275,492.180 $5,283,975.100 $5,910,170.050