Job Info for 3041-03-012

County: HARRISON Highway: FM 3001 Date: 05/05/2022 (2 years ago) Engineer's Estimate: $4,206,747 Control Number: 3041-03-012
Project: BR 2022(504) District: ATLANTA Time: 343 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,206,746.70
HIGHWAY 19 CONSTRUCTION LLC   $4,618,853.24 1
9.8% | $412,106.54
EAST TEXAS BRIDGE, INC.   $5,247,412.34 2
24.74% | $1,040,665.64
13.61% | $628,559.10
LONGVIEW BRIDGE AND ROAD, LTD.   $5,275,492.18 3
25.41% | $1,068,745.48
14.22% | $656,638.94
0.54% | $28,079.84
HODGES AND SON CONSTRUCTION COMPANY, INC.   $5,283,975.10 4
25.61% | $1,077,228.40
14.4% | $665,121.86
0.16% | $8,482.92
RAYFORD'S TRUCK & TRACTOR   $5,910,170.05 5
40.49% | $1,703,423.35
27.96% | $1,291,316.81
11.85% | $626,194.95
Subcontractor Percentage Amount
FARR FOUNDATION, INC. 8.84% $408,306.63
A. E. MOORE CONSTRUCTION, INC. 3.08% $142,260.68
STRIPING TECHNOLOGY, L.P. 1.07% $49,421.73
DUSTIN ALLEN, INC. 0.81% $37,412.71
FLEX SUPPLY, LLC 0.48% $22,170.50
TEX OP CONSTRUCTION, LP 0.36% $16,627.87
PRIMATE CONSTRUCTION, LP 0.17% $7,852.05
Total: 14.81% $684,052.17

Bid Items

Items: 87, 0 filtered
HARRISON FM 3001  |  ATLANTA  |  3041-03-012  |  05/05/2022  |  $4,206,747  |  BR 2022(504)  |  BRIDGE REPL  |  343 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HIGHWAY 19 CONSTRUCTION LLC EAST TEXAS BRIDGE, INC. LONGVIEW BRIDGE AND ROAD, LTD. HODGES AND SON CONSTRUCTION COMPANY, INC. RAYFORD'S TRUCK & TRACTOR
104 6009 REMOVING CONC (RIPRAP) SY 773.000 $20.000 $25.000 $18.000 $16.000 $7.000 $22.000
104 6027 REMOVING CONC (APPR SLAB) SY 115.000 $40.000 $55.000 $30.000 $47.000 $150.000 $60.000
105 6014 REMOVING STAB BASE & ASPH PAV (7"-12") SY 2,298.000 $5.000 $15.000 $10.000 $6.250 $15.000 $9.500
110 6001 EXCAVATION (ROADWAY) CY 2,721.000 $12.000 $10.000 $14.000 $10.250 $10.000 $18.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 4,422.000 $25.000 $15.000 $18.000 $11.000 $15.000 $18.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 16,352.000 $2.000 $3.000 $2.000 $3.500 $2.000 $3.750
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 16,352.000 $0.750 $1.250 $0.650 $0.650 $0.700 $0.700
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 8,176.000 $0.750 $1.120 $0.660 $0.650 $0.250 $0.700
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 8,176.000 $0.750 $0.120 $0.630 $0.630 $0.250 $0.700
168 6001 VEGETATIVE WATERING MG 524.000 $10.000 $50.000 $5.000 $12.500 $1.000 $10.000
169 6002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 1,074.000 $1.750 $1.250 $1.800 $1.800 $2.000 $2.000
247 6392 FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS) CY 1,219.000 $50.000 $45.000 $115.000 $120.000 $60.000 $140.000
275 6001 CEMENT TON 60.000 $175.000 $180.000 $225.000 $250.000 $200.000 $300.000
275 6373 CEMENT TREAT (NEW BASE)(10")(DC) SY 3,510.000 $5.000 $5.000 $4.000 $3.500 $6.000 $10.000
310 6009 PRIME COAT (MC-30) GAL 1,097.000 $6.000 $5.500 $5.000 $6.500 $8.000 $10.000
316 6017 ASPH (AC-20-5TR) GAL 6,159.000 $6.000 $7.000 $5.000 $5.350 $8.000 $12.000
316 6222 AGGR(TY-PB GR-3 SAC-B) CY 155.000 $110.000 $350.000 $175.000 $220.000 $400.000 $325.000
400 6005 CEM STABIL BKFL CY 178.000 $180.000 $250.000 $250.000 $220.000 $190.000 $310.000
403 6001 TEMPORARY SPL SHORING SF 1,388.000 $50.000 $55.000 $60.000 $45.000 $60.000 $75.000
416 6004 DRILL SHAFT (36 IN) LF 500.000 $275.000 $211.000 $265.000 $300.000 $240.000 $315.000
416 6005 DRILL SHAFT (42 IN) LF 1,680.000 $425.000 $255.000 $700.000 $750.000 $795.000 $780.000
420 6014 CL C CONC (ABUT)(HPC) CY 54.600 $1,110.000 $1,200.000 $1,200.000 $1,050.000 $1,500.000 $1,300.000
420 6030 CL C CONC (CAP)(HPC) CY 124.800 $1,200.000 $1,700.000 $1,250.000 $1,100.000 $1,500.000 $1,600.000
420 6038 CL C CONC (COLUMN)(HPC) CY 35.400 $1,200.000 $1,500.000 $1,200.000 $1,300.000 $1,500.000 $2,375.000
422 6002 REINF CONC SLAB (HPC) SF 19,320.000 $25.000 $26.000 $23.000 $22.500 $26.000 $27.000
422 6016 APPROACH SLAB (HPC) CY 105.200 $590.000 $550.000 $650.000 $850.000 $800.000 $800.000
425 6035 PRESTR CONC GIRDER (TX28) LF 2,499.000 $185.000 $216.000 $215.000 $200.000 $205.000 $210.000
432 6006 RIPRAP (CONC)(CL B) CY 6.000 $550.000 $1,000.000 $650.000 $650.000 $600.000 $865.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 2,221.000 $145.000 $150.000 $165.000 $210.000 $125.000 $190.000
432 6039 BEDDING MATERIAL (6 IN) CY 430.000 $100.000 $180.000 $170.000 $160.000 $120.000 $190.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 41.000 $450.000 $550.000 $600.000 $535.000 $550.000 $635.000
450 6024 RAIL (TY SSTR)(HPC) LF 888.000 $85.000 $120.000 $100.000 $75.000 $140.000 $130.000
454 6003 ARMOR JOINT LF 88.000 $80.000 $180.000 $115.000 $130.000 $125.000 $100.000
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 138.000 $125.000 $65.000 $200.000 $210.000 $180.000 $205.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000 $60,000.000 $170,000.000 $130,000.000 $115,000.000 $150,000.000 $165,000.000
500 6001 MOBILIZATION LS 1.000 $385,000.000 $400,000.000 $480,000.000 $450,000.000 $470,000.000 $325,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 20.000 $4,600.000 $2,000.000 $2,500.000 $3,000.000 $2,000.000 $3,200.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 270.000 $30.000 $28.000 $34.000 $34.000 $1.000 $33.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 225.000 $55.000 $60.000 $50.000 $49.500 $1.000 $50.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 495.000 $10.000 $10.000 $9.000 $9.000 $1.000 $10.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 320.000 $25.000 $27.000 $29.000 $29.000 $1.000 $30.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 320.000 $10.000 $10.000 $9.000 $9.000 $1.000 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,257.000 $2.850 $3.000 $3.250 $3.500 $1.000 $3.250
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,257.000 $1.150 $1.000 $0.750 $0.800 $1.000 $0.750
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 570.000 $6.000 $5.000 $7.000 $6.600 $8.000 $6.600
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 570.000 $1.500 $1.000 $1.100 $1.100 $1.000 $1.100
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 18.000 $4,500.000 $7,500.000 $3,000.000 $6,000.000 $2,000.000 $6,000.000
512 6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 2,640.000 $35.000 $83.000 $100.000 $70.000 $80.000 $100.000
512 6049 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 2,640.000 $10.000 $25.000 $13.000 $17.000 $25.000 $16.000
530 6005 DRIVEWAYS (ACP) SY 148.000 $45.000 $75.000 $60.000 $70.000 $20.000 $80.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 500.000 $25.000 $35.000 $29.000 $29.000 $28.000 $28.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,850.000 $3,100.000 $2,000.000 $1,950.000 $2,000.000 $2,200.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 550.000 $2.000 $5.000 $2.200 $3.000 $2.000 $3.300
542 6005 RM MTL BM GD FEN TRANS (T101) EA 4.000 $175.000 $2,750.000 $110.000 $110.000 $200.000 $275.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,500.000 $2,800.000 $3,400.000 $3,380.000 $3,200.000 $3,300.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $270.000 $250.000 $220.000 $220.000 $500.000 $300.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 6.000 $900.000 $2,000.000 $880.000 $880.000 $800.000 $265.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 6.000 $12,000.000 $9,500.000 $9,600.000 $9,500.000 $9,000.000 $9,500.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 2.000 $400.000 $900.000 $1,200.000 $750.000 $850.000 $1,250.000
644 6076 REMOVE SM RD SN SUP&AM EA 2.000 $90.000 $100.000 $100.000 $300.000 $200.000 $125.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 8.000 $25.000 $35.000 $30.000 $22.000 $30.000 $22.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 16.000 $30.000 $35.000 $30.000 $22.000 $30.000 $22.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 6,065.000 $0.400 $1.000 $0.550 $0.550 $0.500 $0.600
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 24.000 $5.000 $10.000 $8.800 $8.800 $10.000 $10.000
662 6045 WK ZN PV MK NON-REM (Y)(4")SLD W/MRKR LF 8,960.000 $2.000 $1.000 $1.100 $1.100 $1.000 $1.200
666 6224 PAVEMENT SEALER 4" LF 1,920.000 $0.500 $1.000 $0.550 $0.550 $0.500 $0.650
668 6002 PREFAB PAV MRK TY B (W)(4")(SLD) LF 960.000 $5.000 $7.000 $8.000 $8.250 $8.000 $8.500
668 6043 PREFAB PAV MRK TY B (Y)(4")(SLD) LF 960.000 $5.000 $7.000 $8.000 $8.250 $8.000 $8.500
672 6009 REFL PAV MRKR TY II-A-A EA 230.000 $3.500 $10.000 $4.500 $4.400 $5.000 $5.250
672 6013 TRAFFIC BUTTON TY II-A-A EA 34.000 $5.000 $15.000 $4.500 $4.400 $5.000 $5.250
672 6017 TRAFFIC BUTTON TY Y EA 102.000 $4.000 $8.000 $4.500 $4.400 $5.000 $4.500
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 16,037.000 $0.600 $1.000 $0.550 $0.550 $0.600 $0.550
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 24.000 $5.000 $10.000 $3.300 $3.300 $5.000 $3.500
678 6001 PAV SURF PREP FOR MRK (4") LF 1,920.000 $0.500 $1.000 $0.280 $0.280 $0.300 $0.300
678 6033 PAV SURF PREP FOR MRK (RPM) EA 22.000 $0.500 $5.000 $1.100 $1.100 $1.000 $1.200
3077 6021 SP MIXES SP-C PG70-22 TON 786.000 $120.000 $180.000 $170.000 $165.000 $150.000 $250.000
3077 6075 TACK COAT GAL 583.000 $6.000 $3.000 $4.500 $6.000 $8.000 $8.000
4021 6001 TIP TESTING(DRILL SHAFT) EA 4.000 $6,000.000 $500.000 $8,500.000 $4,500.000 $7,500.000 $7,500.000
4171 6001 INSTALL BRIDGE IDENTIFICATION NUMBERS EA 2.000 $350.000 $300.000 $500.000 $375.000 $500.000 $2,500.000
5129 6001 INSTALL FTB LF 225.000 $40.000 $55.000 $50.000 $30.000 $25.000 $55.000
5129 6002 REMOVE FTB LF 225.000 $10.000 $55.000 $15.000 $8.000 $5.000 $12.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $15,000.000 $16,000.000 $19,000.000 $20,000.000 $18,000.000
6149 6001 REFL PAV MRK AWT (W) 4" (SLD) (100MIL) LF 12,560.000 $0.500 $1.200 $0.700 $0.720 $0.750 $0.800
6149 6007 REFL PAV MRK AWT (Y) 4" (SLD) (100MIL) LF 7,070.000 $0.500 $1.200 $0.550 $0.550 $0.500 $0.550
6149 6008 REFL PAV MRK AWT (Y) 4" (BRK) (100MIL) LF 780.000 $0.500 $2.000 $0.550 $0.550 $0.500 $0.550
6185 6002 TMA (STATIONARY) DAY 15.000 $160.000 $1,000.000 $300.000 $250.000 $200.000 $150.000
6185 6003 TMA (MOBILE OPERATION) HR 60.000 $60.000 $50.000 $30.000 $55.000 $30.000 $75.000
Totals: $4,206,746.70 $4,618,853.24 $5,247,412.34 $5,275,492.18 $5,283,975.10 $5,910,170.05