Job Info for 0495-08-110

County: HARRISON Highway: IH 20 Date: 05/02/2018 (6 years ago) Engineer's Estimate: $1,955,599 Control Number: 0495-08-110
Project: BR 2018(831) District: ATLANTA Time: 345 WORKING DAYS Type: CONC DECK REPAIR & CONC STR REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,955,599.45
HIGHWAY 19 CONSTRUCTION LLC   $2,087,956.00 1
6.77% | $132,356.55
EAST TEXAS BRIDGE, INC.   $2,296,341.00 2
17.42% | $340,741.55
9.98% | $208,385.00
GIBSON & ASSOCIATES, INC.   $2,452,659.35 3
25.42% | $497,059.90
17.47% | $364,703.35
6.81% | $156,318.35
SJ&J CONSTRUCTION, LLC   $2,476,053.50 4
26.61% | $520,454.05
18.59% | $388,097.50
0.95% | $23,394.15
HODGES AND SON CONSTRUCTION COMPANY, INC.   $2,802,336.50 5
43.3% | $846,737.05
34.21% | $714,380.50
13.18% | $326,283.00
CDM HOLDINGS, LLC   $2,814,823.80 6
43.94% | $859,224.35
34.81% | $726,867.80
0.45% | $12,487.30
CEKRA INC.   $3,204,221.00 7
63.85% | $1,248,621.55
53.46% | $1,116,265.00
13.83% | $389,397.20

Bid Items

Items: 67, 0 filtered
HARRISON IH 20  |  ATLANTA  |  0495-08-110  |  05/02/2018  |  $1,955,599  |  BR 2018(831)  |  CONC DECK REPAIR & CONC STR REPAIR  |  345 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HIGHWAY 19 CONSTRUCTION LLC EAST TEXAS BRIDGE, INC. GIBSON & ASSOCIATES, INC. SJ&J CONSTRUCTION, LLC HODGES AND SON CONSTRUCTION COMPANY, INC. CDM HOLDINGS, LLC CEKRA INC.
104 6011 REMOVING CONC (MEDIANS) SY 169.000 $32.000 $25.000 $25.000 $140.000 $50.000 $40.000 $0.000 $25.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 1,745.000 $6.000 $5.000 $10.000 $18.250 $15.000 $50.000 $0.000 $25.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 425.000 $25.000 $30.000 $25.000 $57.000 $30.000 $40.000 $0.000 $50.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 1,310.000 $1.000 $1.000 $2.000 $1.930 $1.000 $2.000 $0.000 $2.000
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 655.000 $0.750 $1.000 $2.000 $1.930 $1.000 $2.000 $0.000 $2.000
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 655.000 $0.750 $1.000 $2.000 $1.930 $1.000 $2.000 $0.000 $2.000
168 6001 VEGETATIVE WATERING MG 22.000 $15.000 $10.000 $20.000 $275.000 $60.000 $1.000 $0.000 $15.000
354 6014 PLAN & TEXT CONC PAV(0" TO 3/4") SY 468.000 $20.000 $98.000 $70.000 $82.500 $90.000 $80.000 $0.000 $147.000
354 6016 PLAN & TEXT CONC PAV(0" TO 1-1/2") SY 376.000 $20.000 $98.000 $65.000 $44.000 $80.000 $80.000 $0.000 $147.000
428 6001 PENETRATING CONCRETE SURFACE TREATMENT SY 1,350.000 $10.000 $15.000 $8.250 $15.000 $3.000 $20.000 $0.000 $12.000
429 6002 CONC STR REPAIR (EPOXY MORTAR) SF 5.000 $100.000 $250.000 $315.000 $350.000 $400.000 $200.000 $0.000 $2,500.000
429 6003 CONC STR REPAIR(DECK REP(PART DEPTH)) SF 60.000 $88.000 $200.000 $200.000 $150.000 $100.000 $200.000 $0.000 $1,000.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 225.000 $185.000 $180.000 $140.000 $240.000 $200.000 $200.000 $0.000 $1,000.000
429 6009 CONC STR REPAIR (STANDARD) SF 5.000 $200.000 $200.000 $350.000 $350.000 $150.000 $200.000 $0.000 $2,500.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 143.000 $425.000 $400.000 $500.000 $1,000.000 $900.000 $500.000 $0.000 $450.000
438 6005 CLEANING AND SEALING JOINTS LF 995.000 $8.000 $55.000 $33.000 $44.000 $15.000 $30.000 $0.000 $75.000
438 6008 CLEANING AND SEALING JOINTS (CL 7) LF 995.000 $75.000 $65.000 $33.000 $44.000 $30.000 $40.000 $0.000 $75.000
439 6002 CONCRETE OVERLAY (2 IN) SY 2,707.000 $80.000 $21.000 $80.000 $71.000 $40.000 $100.000 $0.000 $100.000
451 6004 RETROFIT RAIL (TY T131RC) LF 1,132.000 $150.000 $190.000 $170.000 $171.000 $220.000 $200.000 $0.000 $250.000
451 6005 RETROFIT RAIL (TY T221) LF 600.000 $150.000 $200.000 $165.000 $150.000 $200.000 $250.000 $0.000 $250.000
454 6007 HEADER TYPE EXPANSION JOINT LF 240.000 $85.000 $30.000 $125.000 $83.000 $400.000 $150.000 $0.000 $400.000
454 6009 JOINT SEALANT LF 240.000 $15.000 $25.000 $16.000 $20.000 $40.000 $30.000 $0.000 $125.000
483 6004 HYDRO-DEMOLITION (1/2 IN) SY 2,707.000 $50.000 $38.000 $40.000 $60.000 $10.000 $60.000 $0.000 $75.000
483 6013 SHOT BLASTING SY 3,373.000 $15.000 $15.000 $6.000 $5.500 $6.500 $10.000 $0.000 $7.000
500 6001 MOBILIZATION LS 1.000 $200,000.000 $200,000.000 $220,000.000 $208,500.000 $330,000.000 $235,000.000 $0.000 $250,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 21.000 $2,500.000 $5,000.000 $5,000.000 $4,550.000 $6,000.000 $5,000.000 $0.000 $1,000.000
512 6067 PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL) LF 850.000 $35.000 $75.000 $75.000 $35.000 $60.000 $70.000 $0.000 $100.000
512 6069 PTB (MOVE)(F SHAPE)(TY 1) OR (STL) LF 1,275.000 $8.000 $25.000 $15.000 $12.000 $30.000 $20.000 $0.000 $25.000
512 6071 PTB (REMOVE)(F SHAPE)(TY 1) OR (STL) LF 850.000 $10.000 $25.000 $20.000 $13.500 $30.000 $20.000 $0.000 $25.000
514 6005 PERM CTB (SGL SLOPE) (TY 1) (48 ) LF 768.000 $160.000 $150.000 $135.000 $265.000 $300.000 $200.000 $0.000 $50.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,150.000 $20.000 $20.000 $20.000 $19.800 $28.000 $24.000 $0.000 $35.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 15.000 $1,750.000 $1,500.000 $1,500.000 $1,485.000 $1,500.000 $1,600.000 $0.000 $2,500.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,000.000 $788.000 $1,200.000 $1,193.500 $1,500.000 $900.000 $0.000 $5,000.000
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 4.000 $1,225.000 $625.000 $600.000 $577.500 $1,000.000 $800.000 $0.000 $5,000.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,125.000 $2.000 $2.000 $2.500 $2.480 $3.000 $3.000 $0.000 $25.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 16.000 $275.000 $200.000 $220.000 $220.000 $400.000 $300.000 $0.000 $500.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 4.000 $100.000 $250.000 $220.000 $220.000 $400.000 $300.000 $0.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 15.000 $2,500.000 $2,475.000 $2,500.000 $2,502.500 $2,500.000 $2,600.000 $0.000 $2,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 8.000 $350.000 $300.000 $220.000 $220.000 $400.000 $400.000 $0.000 $1,000.000
545 6001 CRASH CUSH ATTEN (INSTL) EA 3.000 $10,000.000 $9,500.000 $10,500.000 $10,257.500 $8,000.000 $10,000.000 $0.000 $10,000.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 4.000 $350.000 $2,500.000 $2,200.000 $2,200.000 $1,500.000 $3,000.000 $0.000 $2,500.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $1,000.000 $1,000.000 $550.000 $550.000 $1,500.000 $900.000 $0.000 $1,500.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 45.000 $35.000 $24.000 $20.000 $16.500 $60.000 $30.000 $0.000 $30.000
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 3.000 $35.000 $24.000 $20.000 $16.500 $60.000 $30.000 $0.000 $50.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 66.000 $30.000 $29.000 $35.000 $33.000 $60.000 $40.000 $0.000 $30.000
658 6068 INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2 EA 42.000 $30.000 $24.000 $35.000 $33.000 $60.000 $40.000 $0.000 $50.000
662 6056 WK ZN PAV MRK REMOV (TRAF BTN) TY W EA 2,220.000 $3.000 $4.000 $4.400 $4.400 $3.000 $5.000 $0.000 $5.000
662 6058 WK ZN PAV MRK REMOV (TRAF BTN) TY Y EA 3,236.000 $3.000 $4.000 $4.400 $4.400 $4.000 $5.000 $0.000 $5.000
666 6225 PAVEMENT SEALER 6" LF 3,757.000 $0.250 $1.000 $1.100 $1.100 $2.000 $2.000 $0.000 $3.000
666 6231 PAVEMENT SEALER (ARROW) EA 2.000 $32.000 $100.000 $110.000 $110.000 $200.000 $120.000 $0.000 $1,000.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 2.000 $325.000 $250.000 $275.000 $275.000 $400.000 $260.000 $0.000 $1,000.000
672 6007 REFL PAV MRKR TY I-C EA 18.000 $11.000 $5.000 $5.500 $5.500 $20.000 $6.000 $0.000 $100.000
672 6009 REFL PAV MRKR TY II-A-A EA 18.000 $11.000 $5.000 $5.500 $5.500 $20.000 $6.000 $0.000 $100.000
678 6002 PAV SURF PREP FOR MRK (6") LF 3,757.000 $0.100 $1.000 $1.100 $1.100 $2.000 $1.500 $0.000 $1.000
678 6009 PAV SURF PREP FOR MRK (ARROW) EA 2.000 $35.000 $100.000 $110.000 $110.000 $300.000 $120.000 $0.000 $25.000
713 6005 CRACK CLEANING AND SEALING (JCP) LF 600.000 $2.500 $55.000 $13.000 $15.000 $15.000 $20.000 $0.000 $25.000
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 245.000 $95.000 $75.000 $85.000 $100.000 $40.000 $120.000 $0.000 $200.000
786 6001 CARBON FIBER REINF POLYMER PROTECTION SF 180.000 $35.000 $100.000 $85.000 $82.500 $300.000 $100.000 $0.000 $100.000
4106 6001 POLYESTER POLYMER CONC OVERLAY (3/4") SY 3,373.000 $100.000 $95.000 $135.000 $108.000 $100.000 $170.000 $0.000 $143.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $7,500.000 $10,000.000 $20,000.000 $23,000.000 $12,000.000 $6,000.000 $0.000 $20,000.000
6019 6006 PREFB PV MK W/WNTY TY B (W)(6")(SLD) LF 1,212.000 $8.000 $6.000 $6.600 $6.600 $6.000 $7.000 $0.000 $10.000
6019 6007 PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST LF 300.000 $10.000 $8.000 $8.800 $8.800 $12.000 $10.000 $0.000 $10.000
6019 6014 PREFB PV MK W/WNTY TY B (Y)(6")(SLD) LF 1,060.000 $8.000 $6.000 $6.600 $6.600 $12.000 $7.000 $0.000 $10.000
6019 6015 PREFB PV MK W/WNTY TY B(Y)6"(BRK)CNTST LF 63.000 $10.000 $8.000 $8.800 $8.800 $12.000 $10.000 $0.000 $10.000
6019 6016 PREFB PV MK W/WNTY TY B(Y)6"(SLD)CNTST LF 1,122.000 $15.000 $8.000 $8.800 $8.800 $12.000 $10.000 $0.000 $10.000
6185 6001 TMA (STATIONARY) EA 2.000 $4,500.000 $10,000.000 $30,000.000 $39,000.000 $5,000.000 $16,000.000 $0.000 $5,000.000
6185 6003 TMA (MOBILE OPERATION) HR 20.000 $25.000 $100.000 $50.000 $100.000 $500.000 $30.000 $0.000 $500.000
Totals: $1,955,599.45 $2,087,956.00 $2,296,341.00 $2,452,659.35 $2,476,053.50 $2,802,336.50 $0.00 $3,204,221.00