Show Job Controls
Bid Cobra

HARRISON SH 43 (0208-01-026)

Items: 84

County: HARRISON
Length: 2.6380 MILES
Highway: SH 43
District: ATLANTA
Control Number: 0208-01-026
DBE Goal: 0.0%
Project: F 2026(875)
Guaranty: $70,000.00
Time: 65 WORKING DAYS
Engineer's Estimate: $3,307,700.41
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263222
Type: RESURFACE ROADWAY
Project ID: A00196275
Contract Type: Federal
Project Description: RESURFACE EXISTING 4-LANE ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
HARRISON SH 43 (0208-01-026)
Project Name: N/A
Project: F 2026(875)
Length: 2.6380 MILES
Project Type: CONSTRUCTION
Limits From: US 59
Limits To: SL 390
Project Description: RESURFACE EXISTING 4-LANE ROADWAY
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

84 Total 0 of 84
HARRISON  |  SH 43  |  ATLANTA  |  0208-01-026  |  1:00 PM AUGUST 06, 2026  |  $3,307,700.41  |  F 2026(875)  |  RESURF ROADWAY  |  65 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 46.400
REMOV CONC (RIPRAP)
SY 3.000
REMOV CONC (DRIVEWAYS)
SY 37.000
EMBANK (VEH)(OC)(TY C)
CY 252.000
BACKFILL (TY C)
STA 102.400
BLADING
STA 109.690
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 4,253.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 4,253.000
BOND FBR MTRX SEED (PERM)(RURAL)(CLAY)
SY 16,996.000
VEGETATIVE WATERING
TGL 409.000
SP MIXES SP-C SAC-A PG76-22
TON 10,606.000
TACK COAT
GAL 3,575.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 3,793.000
PLANE ASPH CONC PAV(2")
SY 70,484.000
PLANE ASPH CONC PAV (1" TO 2")
SY 25,922.000
CUT & RESTORE ASPH PAVING
SY 6.000
RIPRAP (CONC)(4 IN)
CY 1.000
RIPRAP (MOW STRIP)(4 IN)
CY 28.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 13.000
RC PIPE (CL III)(18 IN)
LF 154.000
RC PIPE (CL III)(24 IN)
LF 62.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 2.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 89.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 42.000
REMOV STR (HEADWALL)
EA 10.000
REMOV STR (PIPE)
LF 308.000
REMOVING ROCK RIPRAP
CY 5.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 130.000
TMA (MOBILE OPERATION)
DAY 20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 300.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 300.000
DRIVEWAYS (CONC) (TY 1)
SY 37.000
DRIVEWAYS (ACP)
SY 35.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 5.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 75.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 5.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 4.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 18.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000
REMOVE SM RD SN SUP&AM
EA 11.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 4,140.000
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 380.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 27,861.000
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 30.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 339.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 6.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 2.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 640.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 28,617.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 227.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 497.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 4,140.000
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 380.000
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 30.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 339.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 640.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 28,617.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 27,861.000
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 4,140.000
ALL-WTHER PM TY I (W)6"(DOT)(100MIL)
LF 380.000
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 28,617.000
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
LF 640.000
ALL-WTHER PM TY I (W) 8"(SLD)(100MIL)
LF 339.000
ALL-WTHER PM TY I (W) 8"(DOT)(100MIL)
LF 30.000
PREFAB PM TY C (W)(ARROW)
EA 6.000
PREFAB PM TY C (W)(LN REDUCT ARROW)
EA 4.000
PREFAB PM TY C (W)(WORD)
EA 2.000
REFL PAV MRKR TY I-C
EA 228.000
REFL PAV MRKR TY II-A-A
EA 497.000
COMPOSITE GEOGRID FOR ASPHALT OVERLAY
SY 65,423.000
TACK COAT
GAL 9,326.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $34,498.67
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $17,249.33
Total: $51,748.00