Show Job Controls
Bid Cobra

HARRIS IH 45 (0500-03-664)

Items: 54

County: HARRIS
Length: 4.3510 MILES
Highway: IH 45
District: HOUSTON
Control Number: 0500-03-664
DBE Goal: 0.0%
Project: F 2026(852)
Guaranty: $100,000.00
Time: 113 WORKING DAYS
Engineer's Estimate: $4,921,686.24
Date: 1:00 PM AUGUST 06, 2026 (in 5 weeks)
Contract Number: 8263217
Type: RESURFACE ROADWAY
Project ID: A00215821
Contract Type: Federal
Project Description: FULL DEPTH REPAIR, MILLING, SEAL COAT, SP-D OVERLAY, CURB AND SIDEWALK REPAIR, GUARDRAIL, AND PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
PHILLIP GARLIN
HARRIS IH 45 (0500-03-664)
Project Name: N/A
Project: F 2026(852)
Length: 4.3510 MILES
Project Type: CONSTRUCTION
Limits From: NORTH OF BNSF RR
Limits To: NORTH OF W CANINO RD
Project Description: FULL DEPTH REPAIR, MILLING, SEAL COAT, SP-D OVERLAY, CURB AND SIDEWALK REPAIR, GUARDRAIL, AND PAVEMENT MARKINGS
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

54 Total 0 of 54
1 Changed
HARRIS  |  IH 45  |  HOUSTON  |  0500-03-664  |  1:00 PM AUGUST 06, 2026  |  $4,921,686.24  |  F 2026(852)  |  RESURF ROADWAY  |  113 WORKING DAYS
Item Code
Description
Unit
Quantity
REMOV CONC (MOWSTRIP)
LF 5,023.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 53.000
REMOV CONC (CURB)
LF 1,283.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 41,054.000
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 877.000
SP MIXES SP-D SAC-A PG76-22
TON 16,912.000
TACK COAT
GAL 6,842.000
PLANE ASPH CONC PAV(2")
SY 34,623.000
PLANE ASPH CONC PAV(3")
SY 79,415.000
Qty Changed
FULL - DEPTH REPAIR CRCP (6")
CY 388.000
FULL - DEPTH REPAIR CPJR (8")
CY 423.000
RIPRAP (MOW STRIP)(4 IN)
CY 218.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000
TMA (STATIONARY)
DAY 110.000
TMA (MOBILE OPERATION)
DAY 15.000
CONC CURB (DOWEL)
LF 1,283.000
CONC SIDEWALKS (6")
SY 53.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,213.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 27.000
REMOVE METAL BEAM GUARD FENCE
LF 3,075.000
REMOVE TERMINAL ANCHOR SECTION
EA 18.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000
RM MTL BM GD FENCE TRANS (TL-2)
EA 10.000
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000
GUARDRAIL END TREATMENT (REMOVE)
EA 32.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 31.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 60.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 22,600.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 12,706.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 4,848.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 40,704.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,368.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 264.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,353.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 4,896.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,923.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 30,042.000
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 11,300.000
ALL-WTHER PM TY I (W)6"(DOT)(100MIL)
LF 92.000
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 20,352.000
PREFAB PM TY C (W)(24")(SLD)
LF 1,212.000
PREFAB PM TY C (W)(ARROW)
EA 2.000
PREFAB PM TY C (W)(DBL ARROW)
EA 11.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 3.000
PREFAB PM TY C (W)(WORD)
EA 10.000
REFL PAV MRKR TY II-C-R
EA 1,047.000
ELIM EXT PM & MRKS (24")
LF 511.000
ELIM EXT PM & MRKS (ARROW)
EA 2.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 3.000
ELIM EXT PM & MRKS (UTURN ARROW)
EA 3.000
ELIM EXT PM & MRKS (WORD)
EA 5.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,200.00
Total: $33,200.00