Show Job Controls
Bid Cobra

HARRIS UA 90 (0028-01-099)

Items: 84

County: HARRIS
Length: N/A
Highway: UA 90
District: HOUSTON
Control Number: 0028-01-099
DBE Goal: N/A
Project: NH 2020(693)
Guaranty: N/A
Time: 64 WORKING DAYS
Engineer's Estimate: $1,449,415.43
Date: 04/09/2020 (6 years ago)
Contract Number: N/A
Type: BASE REPAIR, MILL, OVERLAY ROAD & SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,449,415.43
$1,366,270.54
Over/Under Est: -5.74% -$83,144.89
Over/Under Est: 1.24% $18,030.32
Amt Left: 7.41% $101,175.21
$1,588,888.65
Over/Under Est: 9.62% $139,473.22
Amt Left: 16.29% $222,618.11
Delta: -8.28% -$121,442.90
Over/Under Est: 37.82% $548,192.02
Amt Left: 46.21% $631,336.91
Delta: -25.72% -$408,718.80

Bid Items & Bid Tabulations

84 Total 0 of 84
HARRIS  |  UA 90  |  HOUSTON  |  0028-01-099  |  04/09/2020  |  $1,449,415.43  |  NH 2020(693)  |  BASE REPAIR, MILL, OVERLAY ROAD & S...  |  64 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
ANGEL BROTHERS HOLDINGS CORP.
TRIPLE B SERVICES LLP
DURWOOD GREENE CONSTRUCTION CO.
REMOVING STAB BASE AND ASPH PAV (6")
SY 9,057.000 $2.600 $4.250 $4.100 $8.510 $9.000
BACKFILL (TY A OR B)
STA 75.000 $170.000 $240.000 $270.000 $325.000 $175.000
FL BS (RDWY DEL) (TY A GR 4)
TON 200.000 $50.000 $31.000 $48.000 $47.000 $90.000
REWORK BS MTL (TY C) (6") (ORD COMP)
SY 9,057.000 $5.000 $2.500 $5.000 $4.900 $5.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 1,993.000 $84.000 $72.500 $85.000 $83.000 $100.000
PRIME COAT (MULTI OPTION)
GAL 2,265.000 $4.000 $1.900 $3.650 $2.750 $5.000
ASPH (AC-20-5TR)
GAL 14,897.000 $3.000 $2.480 $3.150 $4.250 $3.500
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 398.000 $118.000 $158.000 $128.000 $137.000 $122.000
D-GR HMA(SQ) TY-D PG76-22
TON 748.000 $140.000 $87.000 $98.000 $100.000 $170.000
STONE-MTRX-ASPH SMA-F SAC-A PG76-22
TON 3,350.000 $140.000 $130.000 $142.000 $200.000 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(24")
SY 30.000 $150.000 $210.000 $330.000 $140.000 $250.000
PLANE ASPH CONC PAV (2")
SY 40,600.000 $1.500 $1.500 $0.650 $2.000 $2.500
RIPRAP (MOW STRIP)(4 IN)
CY 9.000 $850.000 $655.000 $975.000 $900.000 $1,000.000
SALV MATRL (CREDIT ITEM)
LS 1.000 $1.000 $1.000 $1,000.000 $1.000
MOBILIZATION
LS 1.000 $135,640.560 $130,000.000 $133,000.000 $100,083.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $15,500.000 $1,580.000 $2,000.000 $6,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,444.000 $3.000 $3.320 $4.150 $3.600 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,444.000 $1.250 $2.400 $1.150 $0.750 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 84.000 $3.500 $32.500 $4.700 $10.000 $16.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 84.000 $0.850 $26.400 $1.200 $2.250 $5.000
MTL W-BEAM GD FEN (STEEL POST)
LF 62.500 $30.000 $28.900 $34.000 $31.500 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,300.000 $1,880.000 $2,220.000 $2,070.000 $3,300.000
REMOVE METAL BEAM GUARD FENCE
LF 62.500 $3.500 $2.100 $2.500 $2.310 $3.500
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,200.000 $2,670.000 $3,140.000 $2,940.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $320.000 $290.000 $340.000 $300.000 $350.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $86.000 $70.000 $82.000 $78.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 2.000 $31.000 $27.000 $32.000 $28.000 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 21,252.000 $0.200 $0.180 $0.200 $0.200 $0.180
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 40,977.000 $0.200 $0.200 $0.250 $0.220 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,895.000 $0.500 $0.400 $0.500 $0.440 $0.400
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 630.000 $2.000 $2.000 $2.350 $2.200 $2.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 18.000 $80.000 $65.000 $76.500 $71.000 $65.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 18.000 $80.000 $65.000 $76.500 $71.000 $65.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 16,458.000 $0.200 $0.200 $0.250 $0.220 $0.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 965.000 $0.900 $0.900 $1.100 $1.000 $0.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 210.000 $6.300 $8.000 $9.400 $8.800 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $125.000 $150.000 $176.500 $165.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000 $125.000 $150.000 $176.500 $165.000 $150.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 4.000 $525.000 $395.000 $465.000 $430.000 $395.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 3,542.000 $0.700 $1.250 $1.500 $0.220 $1.250
PAVEMENT SEALER 6"
LF 37,201.000 $0.100 $0.200 $0.250 $0.330 $0.200
PAVEMENT SEALER 8"
LF 965.000 $0.200 $0.300 $0.350 $0.330 $0.300
PAVEMENT SEALER 24"
LF 210.000 $0.500 $0.900 $1.100 $0.990 $0.900
PAVEMENT SEALER (ARROW)
EA 7.000 $25.000 $25.000 $29.500 $27.500 $25.000
PAVEMENT SEALER (WORD)
EA 7.000 $25.000 $25.000 $29.500 $27.500 $25.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $35.000 $30.000 $35.300 $33.000 $30.000
PAVEMENT SEALER (RR XING)
EA 4.000 $71.000 $45.000 $53.000 $50.000 $45.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,542.000 $0.600 $0.650 $0.750 $0.700 $0.650
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 13,659.000 $0.500 $0.650 $0.750 $0.700 $0.650
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 16,458.000 $0.500 $0.650 $0.750 $0.700 $0.650
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $230.000 $250.000 $294.000 $275.000 $250.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 1.000 $350.000 $295.000 $347.000 $325.000 $295.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $300.000 $250.000 $294.000 $275.000 $250.000
REFL PAV MRKR TY I-C
EA 40.000 $4.650 $4.000 $4.700 $4.400 $4.000
REFL PAV MRKR TY II-A-A
EA 388.000 $4.500 $4.000 $4.700 $4.400 $4.000
REFL PAV MRKR TY II-C-R
EA 183.000 $4.500 $4.000 $4.700 $4.400 $4.000
ELIM EXT PAV MRK & MRKS (6")
LF 1,453.000 $0.450 $0.400 $0.500 $0.440 $0.400
ELIM EXT PAV MRK & MRKS (8")
LF 407.000 $0.650 $0.600 $0.700 $0.660 $0.600
ELIM EXT PAV MRK & MRKS (12")
LF 375.000 $2.200 $0.800 $0.950 $0.880 $0.800
ELIM EXT PAV MRK & MRKS (24")
LF 80.000 $2.500 $1.000 $1.200 $1.100 $1.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $50.000 $85.000 $100.000 $93.000 $85.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 1.000 $55.000 $100.000 $118.000 $110.000 $100.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $60.000 $85.000 $100.000 $93.000 $85.000
PAV SURF PREP FOR MRK (6")
LF 38,654.000 $0.010 $0.030 $0.040 $0.030 $0.030
PAV SURF PREP FOR MRK (8")
LF 1,372.000 $0.040 $0.060 $0.070 $0.070 $0.060
PAV SURF PREP FOR MRK (12")
LF 375.000 $0.050 $0.150 $0.200 $0.160 $0.150
PAV SURF PREP FOR MRK (24")
LF 290.000 $0.100 $0.200 $0.250 $0.220 $0.200
PAV SURF PREP FOR MRK (ARROW)
EA 7.000 $6.000 $10.000 $11.800 $11.000 $10.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $10.000 $15.000 $17.700 $16.500 $15.000
PAV SURF PREP FOR MRK (WORD)
EA 7.000 $6.000 $12.500 $14.700 $13.750 $12.500
PAV SURF PREP FOR MRK (RR XING)
EA 4.000 $5.850 $15.000 $17.700 $16.500 $15.000
PAV SURF PREP FOR MRK (RPM)
EA 611.000 $0.550 $0.500 $0.600 $0.550 $0.500
DITCH CLEANING AND RESHAPING (FOOT)
LF 7,320.000 $12.500 $4.000 $16.000 $4.250 $23.000
STORM SEWER CLEANING (ALL SIZES)
LF 2,470.000 $7.000 $30.000 $22.000 $1.900 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 194.000 $50.000 $21.000 $55.000 $60.000 $75.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 468.000 $0.700 $1.500 $1.750 $1.650 $1.500
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 137.000 $0.700 $1.750 $2.100 $1.920 $1.750
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 407.000 $2.000 $1.850 $2.200 $2.000 $1.850
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 375.000 $3.000 $4.500 $5.300 $4.950 $4.500
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 80.000 $6.000 $9.000 $10.600 $9.900 $9.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 711.000 $0.600 $1.500 $1.800 $1.650 $1.500
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 137.000 $0.900 $2.000 $2.350 $2.200 $2.000
TMA (STATIONARY)
DAY 81.000 $250.000 $21.750 $190.000 $215.000 $250.000
TMA (MOBILE OPERATION)
HR 184.000 $60.000 $53.000 $35.000 $33.000 $35.000
Totals: $1,449,415.430 $1,366,272.540 $1,467,447.750 $1,590,888.655 $1,997,609.450